PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS

Similar documents
Project changes are summarized below and highlighted in yellow on the attached copy of the TIP. Federal Aid Type. Federal Funds

CHAPTER 3: CIRCULATION

DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Annual Listing of Obligated MPO Projects

RIDE III PROPOSED PROJECTS. April 2015

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2002 )

State Route 160 (Blue Diamond Highway)

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Planned Improvements from Sector & Area Plans that have been added to the MTP

Route 29 Solutions Projects

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Bluffdale/ UDOT South High-T Intersection Project Type Operations

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

CTH M HIGHWAY PROJECT CTH Q to STH 113

CITY OF LANCASTER PROPOSED NEW PROJECTS

Building Great Neighbourhoods QUEEN ALEXANDRA

Cincinnati Dayton Rd Widening

Highway 56 Traffic Study Rymal Road to Cemetery Road

Gandy Connector: Travel Demand. Policy Committee August 2013

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Basalt Creek Transportation Refinement Plan Recommendations

A: PLANNED P ROJECTS PROJECTS

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2001 )

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

APPENDIX D COST SUMMARY TABLES

Transportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

VISION TRANSPORTATION

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Secondary Road Program

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

3.0 Future Conditions

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

EXECUTIVE SUMMARY REGIONALLY SIGNIFICANT ROUTES FOR SAFETY AND MOBILITY REGIONALLY SIGNIFICANT ROUTES SEPTEMBER 2008 PARTNERING FOR SAFETY & MOBILITY

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Roadway Project Recommendations:

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN

2019 Federal Transportation Improvement Program

Chapter 4: Funding and Implementation

Iowa Highway 58 Corridor Improvement Study

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Short and Long Term Needs

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

2040 Long Range Plan Projects Draft October 2011

CHARLOTTE COUNTY PUNTA GORDA MPO

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

3.9 Recreational Trails and Natural Areas

Bicyclist Safety Action Plan (BSAP) 2018 Update. Presentation by Michael Sanders February 28, 2018

Coolidge - Florence Regional Transportation Plan

Combined RTIPRfor NMDOT District 1 Southwest and South Central RPOs. for 7 Year STIP (FY 2012 through FY 2018)

Preliminary Engineering Study

Regional. Featuring the Tucson streetcar. Over jobs created! See inside projects complete and more on the way!

TIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED.

FDOT Treasure Coast Traffic Impact Report

Open Response to Public Comments

FAMPO RESOLUTION 18-34

Culpeper District. Albemarle County Monthly Report September, 2011

PUBLIC SERVICE DEPARTMENT

Implementing Agency Project Award. Pavement resurfacing and concrete repair of approximately 17 centerline miles throughout city

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

FY Regional Transportation Improvement Program

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

Appendix 1. Public Participation

McLEAN CITIZENS ASSOCIATION

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

The Transportation Improvement Program

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

STATION #3 INITIAL ALTERNATIVES

Project Description Form 6V

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

San Bernardino County Non-Motorized Transportation Plan - Chapter 5

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Recommended Alternatives

Circulation and Mobility

City of Scotts Valley CITY COUNCIL STAFF REPORT

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Transcription:

PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY 2016-2035 SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS The Sun Corridor Metropolitan Planning Organization (Sun Corridor MPO) is notifying the public of a proposed amendment to the FY 2016-2035 Sun Corridor MPO Listing of Transportation Projects. A regional emissions analysis has been conducted for the proposed amendment to the FY 2016-2035 Listing of Transportation Projects. Both the proposed amendment and the corresponding regional emissions analysis are being provided for review and comment. The proposed amendment requires a new conformity determination. The proposed amendment to the FY 2016-2035 Listing of Transportation Projects is required for various project changes. The changes impact the modeling assumptions used in the most recent conformity analysis and a new regional emissions analysis for the nonattainment areas was conducted. The results of the regional emissions analysis for the proposed amendment indicate that the FY 2016-2035 Listing of Transportation Projects will not contribute to violations of federal air quality standards. The consultation documentation on the proposed amendment and regional emissions analysis is available for review at the Sun Corridor MPO Offices from 8:00 a.m. to 5:00p.m. Monday through Friday or on the Sun Corridor MPO website at www.scmpo.org. Public comments are welcomed at the Sun Corridor Metropolitan Planning Organization Executive Board meeting on June 16, 2015, or may be submitted in writing by 10:00 a.m. on June 15, 2015 to the address below. Contact Person: Irene Higgs, Sun Corridor MPO 211 rth Florence Street, Ste. 103, AZ 85122 Telephone: (520) 705-5143 E-mail: ihiggs@scmpo.org

ADOT I-8: Bianco Road - Junction I-10 Pavement Preservation 4 4 2016 NIM ADOT SR79, MP 122.4 Extend Pipes and Culverts 2 2 2016 NIM ADOT ADOT SR 87 at MP 128.89, Randolph. SR87 at Ruins Dr., MP 134.28 in COOLIDGE Construction Left Turn Lane and Intersection Lighting 2 2 2017 NIM New Traffic Signal 2 2 2018 NIM ADOT SR-287: JCT I-10 to La Palma Road Pavement Preservation 2 2 2018 NIM ADOT Burris Road to Five Point Intersection Pavement Preservation 2 2 2018 NIM ADOT I-10 SR 87 TI, MP 209.59 MP 213 Construct Roadway Widening 4 6 2022 2025 ADOT I-10 Early to I-8, MP 196 MP 199 Construct Roadway Widening 4 6 2023 2023 Phoenix Mart Loop and 1/4 mile 1/2 street improvement on Casa Bonita west of Toltec Buttes Road Toltec Buttes: Cottonwood Lane and Florence Blvd. McCartney Road:.25 mi. between Tucker Road and Palomino Parkway Camino Mercado: 0.25 miles improvement N. of Florence Blvd. Peart Road: 1/4 mile north of Cottonwood Lane, within the Villas at Mary T development. Trekell Road: 1/4 mile south from Rodeo Road intersectio Various Location in CASA GRANDE Cottonwood Lane: From Henness to Mission Parkway New Road Construction 0 2 2015 NIM Construct Roadway Widening 2 4 2015 2016 Construct Roadway Widening 2 3 2015 NIM New Road Construction 0 2 2015 NIM Construct Roadway Widening 2 5 2015 NIM Roadway Improvement - Turning Lanes Procurement - Upgrade Pedestrian Countdown Heads and APS 4 5 2016 NIM 0 0 2016 NIM Construct Roadway Widening 2 6 2018 2020 Doan St: Trekell to Pottebaum. Construct Roadway Widening 0 2 2019 NIM Open Page 1 of 10

Open I-8: at. MP 176 in City of, new intersection, and roadway expansion on Henness road from Florence Blvd to I-8. Construct Roadway, and new traffic interchange on I-8 including new underpass bridge structure and Henness Road. 0 4 2019 2020 Rodeo Road: Trekell and Peart Roads Trekell Road : From McCartney. to Val Vista Blvd. Hacienda Road: Florence Blvd. and Cottonwood Lane Widen and construct frontage road on north side 2 4 2019 2020 New Road Construction 0 3 2019 2020 Construct Roadway Widening 2 4 2019 2020 McCartney Road: 1/2 mile at Marabella Site Construct Roadway Widening 2 5 2019 2020 Burris Road: Peters Road and SR 84 Pave and Widen 2 4 2019 2020 Cottonwood Lane: From Mission Parkway to rth Signal Peak. Construct Roadway Widening 2 6 2020 2022 Kortsen TI New Traffic Interchange 0 0 2021 2024 Florence Blvd: Hacienda to Signal Peak South frontage road on I-8 at MP 176 between Henness Road alignment and Lamb/Cox Road Cornman Road between Henness Road and I-10 Florence Blvd: Hacienda to Signal Peak Construct Roadway Widening 2 4 2025 2025 Construct New Frontage 0 2 2030 2035 Pave Dirt Road 2 4 2030 2035 Construct Roadway Widening 4 6 2035 2035 Bartlett : Christensen to Hwy 87 Road 2(U) 2(U) 2016 NIM Randolph : RR to Vail Road 2 2 2016 NIM Bartlett : Hwy 87 to 5th St Road 2(U) 2(U) 2016 NIM Nafziger : Byrd Ave to Vah Ki Inn Road 2(U) 2(U) 2016 NIM Bartlett : Nafziger to Christensen Road 2(U) 2(U) 2016 NIM Page 2 of 10

Christensen : Ave to Martin Open 2 2 2016 NIM Central Ave: Main St to Arizona Blvd Construct Roadway Improvements 2 2 2017 NIM Ave: 9th St to Kenworthy Construct Roadway Improvements 2 2 2017 NIM Kenworthy : Martin rth 1/2 Mile Construct Roadway Widening 2 4 2017 2017 Nafziger : Ave to Byrd Ave Road 2(U) 2(U) 2017 NIM Randolph : Hwy 87 to Vail Road 2(U) 2(U) 2017 NIM Bartlett : Nafzinger to Attaway Road 2(U) 2(U) 2018 NIM Main St: Central Ave to Ave Construct Roadway Improvements 2 2 2018 NIM Macrae : Ave to Martin Road 2(U) 2(U) 2018 NIM Vah Ki Inn : 10th Place to Kenworthy Construct Roadway Widening 2 4 2018 2018 9th St: Ave to Martin Construct Sidewalks 2 2 2019 NIM Main St; Central Ave to Vah Ki Inn Construct Sidewalks 2 2 2019 NIM McCartney : Signal Peak to Toltec Buttes McRae : Martin to Woodruff Construct Roadway Widening 2 4 2019 2019 2 2 2019 NIM Martin : 9th St to Kenworthy Construct Roadway Improvements 2 2 2020 NIM Vah Ki Inn : Main St to Sonora St Construct Roadway Widening 2 4 2020 2020 Vah Ki Inn : rthern Ave to Skousen Construct Roadway Improvements 2 2 2020 NIM Woodruff : MacRae to Curry 2 2 2020 NIM Skousen : Vah Ki Inn to Hwy 87 Construct Roadway Improvements 2 2 2020 NIM - Page 3 of 10

Toltec Buttes : Randolph to McCartney Open Construct New Roadway 0 4 2020 2020 Vah Ki Inn : Sonora St to Washington St Construct Roadway Widening 2 4 2020 2020 Macrae : Ave to Vah Ki Inn Road 2(U) 2(U) 2020 NIM Martin : Arizona Blvd to 9th St Construct Roadway Widening 2 4 2020 2020 Martin : Kenworthy to Skousen Construct Roadway Improvements 2 2 2020 NIM Vah Ki Inn : Washington St to Nafziger Val Vista : Signal Peak to 1/4 MI East of Curry 2 2 2020 NIM Road 2(U) 2(U) 2020 NIM Macrae : Vah Ki Inn to Hwy 87 Road 2(U) 2(U) 2021 NIM -- Nafziger : Martin to Bartlett Road 2(U) 2(U) 2021 NIM -- Randolph : Signal Peak to Toltec Buttes Construct Roadway Improvements 2 2 2021 NIM -- Attaway : Hwy 287 rth 1/2 Mile Construct Roadway Improvements 2 2 2022 NIM -- Bartlett : Hwy 87 to 5th St Pave Dirt Road 2(U) 2 2022 2022 -- Martin : 9th St to Kenworthy Construct Roadway Widening 2 4 2022 2022 -- Martin : Skousen to Macrae Construct Roadway Improvements 2 2 2022 NIM -- Skousen : Ave to Midway St Construct Roadway Widening 3 4 2022 2022 -- Attaway : Vah Ki Inn to Hwy 287 Construct Roadway Improvements 2 2 2023 NIM -- Ave: 9th St to Kenworthy Construct Roadway Widening 2 4 2023 2023 -- rthern Ave: 9th St to Kenworthy Construct Roadway Improvements 2 2 2023 NIM -- Randolph : Hwy 87 to Vail Pave Unpaved Roadway 2(U) 2 2023 2023 -- Page 4 of 10

Randolph : Lola Lee to Signal Peak Open Construct Roadway Improvements 2 2 2023 NIM -- Skousen : Ave to Martin Construct Roadway Improvements 2 2 2023 NIM -- Skousen : Mid Way St to Vah Ki Inn Construct Roadway Widening 2 4 2023 2023 -- Kenworthy : Martin to Bartlett Construct Roadway Widening 2 4 2024 2024 -- Skousen : Vah Ki Inn to Hwy 87 Construct Roadway Widening 2 4 2024 2024 -- Vah Ki Inn at Nafziger 2 2 2024 NIM -- Attaway : Ave to Vah Ki Inn Construct Roadway Improvements 2 2 2025 NIM -- Signal Peak : Hwy 87 to Val Vista Bartlett : Eleven Mile Corner to Macrae Construct New Roadway Alignment 2 4 2025 2025 -- Road 2(U) 2(U) 2025 NIM -- Macrae : Woodruff to Bartlett Road 2(U) 2(U) 2025 NIM -- Randolph : La Palma to Sunshine Blvd Construct Roadway Improvements 2 2 2025 NIM -- Signal Peak : Hwy 87 to Val Vista Construct Roadway Widening 2 4 2025 2025 -- Vah Ki Inn : 9th St to 10th Place Construct Roadway Widening 2 4 2025 2025 -- Ave: Kenworthy to Skousen Randolph : Sunshine Blvd to Eleven Mile Corner Signal Peak : Val Vista to Woodruff Construct Roadway Widening 3 4 2026 2026 -- Construct Roadway Improvements 2 2 2026 NIM -- Construct Roadway Improvements 2 2 2026 NIM -- Woodruff : Curry to Signal Peak Construct Roadway Improvements 2 2 2026 NIM -- Macrae : Ave to Martin Pave Dirt Road 2(U) 2 2027 2027 -- Macrae : Ave to Vah Ki Inn Pave Dirt Road 2(U) 2 2027 2027 -- Page 5 of 10

McCartney : La Palma to Sunshine Blvd Open Pave Dirt Road 2(U) 2 2027 2027 -- Vah Ki Inn : rthern Ave to Skousen Construct Roadway Widening 2 4 2027 2027 -- Signal Peak : Woodruff to McCartney Woodruff : Macrae to Curry Pave Dirt Road 2(U) 4 2027 2027 -- 2(U) 2(U) 2027 NIM -- Martin : Kenworthy to Skousen Construct Roadway Widening 2 4 2028 2028 -- McCartney : Signal Peak to Toltec Buttes McCartney : Sunshine Blvd to Eleven Mile Corner Construct Roadway Widening 4 6 2028 2028 -- Pave Dirt Road 2(U) 2 2028 2028 -- Sunshine Blvd: Bartlett to Randolph Construct Roadway Widening 2 4 2028 2028 -- Woodruff : Signal Peak to Toltec Buttes Construct Roadway Improvements 2 2 2029 NIM -- Attaway : Hwy 287 rth 1/2 Mile Construct Roadway Widening 2 4 2030 2030 -- Macrae : Vah Ki Inn to Hwy 87 Pave Dirt Road 2(U) 2 2030 2030 -- Signal Peak : Val Vista to Woodruff Construct Roadway Widening 2 4 2030 2030 -- Sunshine Blvd: Randolph to Kleck Construct Roadway Widening 2 4 2030 2030 -- Val Vista : Signal Peak to 1/4 MI East of Curry Val Vista : Macrae to 1/4 MI East of Curry Pave and Widen Roadway 2(U) 4 2030 2030 -- Pave and Widen Roadway 2(U) 4 2031 2031 -- Bartlett : Hwy 87 to 5th St Construct Roadway Widening 2 4 2032 2032 -- McCartney : La Palma to Hwy 87 Construct Roadway 0 4 2032 2032 -- Ave: 1st St to Arizona Blvd Construct Roadway Widening 2 4 2033 2033 -- Attaway : Vah Ki Inn to Hwy 287 Construct Roadway Widening 2 4 2033 2033 -- Page 6 of 10

Open Martin : Picacho St to Arizona Blvd Construct Roadway Widening 2 4 2033 2033 -- Skousen : Ave to Martin Construct Roadway Widening 2 4 2033 2033 -- Various Alleys (Citywide) Road 1(U) 1(U) 2033 NIM -- Eleven Mile Corner : Bartlett to Randolph McCartney : Toltec Buttes to Evans Pave Dirt Road 2(U) 4 2034 2034 -- Construct Roadway Widening 5 6 2034 2034 -- Various Alleys (Citywide) Road 1(U) 1(U) 2034 NIM -- Attaway : Ave to Vah Ki Inn Construct Roadway Widening 2 4 2035 2035 -- Martin : Picacho St to Christensen Pave Dirt Road 2(U) 2 2035 2035 -- Various Alleys (Citywide) Road 1(U) 1(U) 2035 NIM -- Eloy Citywide (various) Procurement of Street Signs -- -- 2015 NIM Eloy Shedd : Estrella to Frontier St Design/ROW 4 2 2016 NIM Eloy Various Locations in ELOY Upgrade Pavement Markings 0 0 2016 NIM Eloy Houser Road: Frontier to Eleven Mile Corner Roadway Paving 2(U) 2 2015 2015 Eloy Montezuma Dr: Shira St to Arizona St Dust Mitigation 2 2 2016 NIM Eloy Atlantic Dr: Shira St to End Point Dust Mitigation 2 2 2016 NIM Eloy Cortez Dr: Shira St to Papago St Dust Mitigation 2 2 2016 NIM Eloy Pacific Dr: Shiria St to End Point Dust Mitigation 2 2 2016 NIM Eloy Maverick Dr: Toltec to End Point Dust Mitigation 2 2 2016 NIM Eloy Kioha Dr: Estrella to Shedd Dust Mitigation 2 2 2016 NIM Page 7 of 10

Open Eloy Montgomery Circle: Estrella Dust Mitigation 2 2 2016 NIM Eloy Valencia Dr: Zapotec Ave to Papago St Dust Mitigation 2 2 2016 NIM Eloy Zapotec Ave: Shedd to Valencia Dr Dust Mitigation 2 2 2016 NIM Eloy Kioha Dr: Shedd to Papago St. Dust Mitigation 2 2 2016 NIM Eloy Shedd : Estrella to Frontier St Reconstruction 4 2 2015 2015 Eloy Various Locations in ELOY Construction - Installation to Upgrade Regulatory Signs including Hardware 0 0 2017 NIM Eloy Toltec Road: I-10 to Frontier St Design/ROW 2 4 2019 NIM Eloy Main Street: Frontier Road (Hwy 84) to Battaglia Drive Roadway Improvements 4 2 2018 2019 Eloy Shedd Road: Estrella to Tumbleweed Design/ROW 2 4 2018 NIM Eloy Shedd Road: Frontier to Estrella Roadway Improvements 4 4 2018 NIM Eloy Toltec Road: I-10 to Frontier St Design/ROW 2 4 2019 NIM Eloy Toltec Road: I-10 to Frontier Roadway Improvements 2 4 2019 2019 Eloy Eloy Frontier Street (Hwy 84): La Palma Road to 11 Mile Corner Battaglia Dr: Sunshine Blvd to 11 Mile Corner Road Sign Upgrade at Various Location in PINAL COUNTY Roadway Improvements 4 4 2025 NIM Roadway Improvements 2 6 2035 2035 Design 0 0 2015 NIM Cornman : Midway to Mammoth Dust Mitigation 2(U) 2(U) 2015 NIM Midway : Cornman to Greene Wash Dust Mitigation 2(U) 2(U) 2015 NIM Storey Road: 11 mile Corner to LoLaLee Dust Mitigation 2(U) 2(U) 2016 NIM - Page 8 of 10

Open Hopi Drive: Pinal Ave to Trekell Dust Mitigation 2 2 2016 NIM Red Rock Access : Aguierre Ln to Sasco Pre-construction of Roadway Improvements -- -- 2016 NIM Hopi Dr: Pinal Ave (SR387) to Trekell Dust Mitigation 2(U) 2(U) 2016 NIM Storey : 11 Mile Corner to Tweedy Sign Upgrade at Various Location in PINAL COUNTY Dust Mitigation 2(U) 2(U) 2016 NIM Procurement 0 0 2017 NIM Christensen Road: Bartlett to Martin Dust Palliative 2(U) 2(U) 2017 NIM Bartlett : From 5th St to Christensen Dust Palliative 2(U) 2(U) 2017 NIM Henness : Val Vista to Waverly Dr New Construction 2(U) 2 2017 2017 Harmon : Toltec Hwy to Tweedy Dust Mitigation 2(U) 2(U) 2017 NIM LaPalma : SR287 to 0.25 mi N. Kleck Dust Mitigation 2(U) 2(U) 2017 NIM McCartney : I-10 to Evans Design 2 4 2017 NIM Battaglia Drive at Overfield Road Intersection Improvements 2 2 2017 NIM Estancia Dr: Davis Ranch to Hedgehog Trail Dust Mitigation 2(U) 2(U) 2017 NIM Harmon : Toltec Hwy to Tweedy Dust Mitigation 2(U) 2(U) 2017 NIM La Palma Road: State Route 287 to ¼ Mile rth of Kleck Road Dust Mitigation 2(U) 2(U) 2017 NIM Maverick Circle: Mohican West Dust Mitigation 2(U) 2(U) 2017 NIM McCartney : I-10 to Evans Reconstruction 2 4 2018 2018 Curry : SR287 to Storey Construction 2(U) 2 2018 2018 Tweedy : SR287 to Storey Construction 2(U) 2 2018 2018 Page 9 of 10

MaryLynne Lane: Missle Base to rth 3 Miles Peters : Santa Cruz Wash to Corrales Open Dust Palliative 2(U) 2(U) 2018 NIM Dust Palliative 2(U) 2(U) 2018 NIM State HWY 84: Fuqua to Stanfield. Construction 4 5 2025 2025 Stanfield : Peters to State Hwy 84 Construction 2 3 2025 2025 Kortsen : Stanfield to Fuqua Construction 2(U) 2 2025 2025 Stanfield : Clayton to Kortsen Construction 2(U) 2 2025 2025 Miller : Anderson to Russell (Solana Ranch rth) Construction 2(U) 2 2025 2025 Anderson : Barnes to Miller. Construction 2 3 2025 2025 Anderson : Kortsen to Barnes Construction 2 3 2025 2025 Kortsen : Anderson to Russell Construction 2(U) 2 2025 2025 Anderson : Peters to Hwy 84 Construction 2(U) 2 2025 2025 State Hwy 84: Anderson to Murphy Construction 2 3 2025 2025 Miller : Anderson to Russell (Santa Cruz Ranch) Construction 2(U) 2 2025 2025 McCartney : Weaver to Azurite Construction 2 3 2025 2025 Overfield : Lake Powell Dr.25 Miles South Construction 2 3 2025 2025 McCartney : Evans to 1.0 Miles East Construction 4 5 2025 2025 McCartney : Signal Peak to 0.5 Miles East Signal Peak : Randolph to 0.5 Miles rth Signal Peak : McCartney to 0.5 Miles South Construction 2(U) 2 2025 2025 Construction 2 4 2025 2025 Construction 2 3 2025 2025 Page 10 of 10