1 Combined RTIPRfor NMDOT District 1 Southwest and South Central RPOs for 7 Year STIP (FY 2012 through FY 2018) KEY: South Central RPO s Southwest RPO s Roadway Recommendations: Note: Required Local Government Match is subject to change by FHWA at the time of agreement. MATCH IN (14.56%) YEAR(S), IF! 1 SOLU APICABLE ABOVE 1 South of US 60 #2628 Socorro.17 Mile South of US Miles $1,277 $ Roadway Improvement STP S 2010, Revised N constructed in 1930's, thus having outlived its useful life. No capacity shown. 2 Silver Silver 3 I-25 Exit 83 SB Silver City Silver Phase II & Drainage Improvement 0.45 $1,087 $ Reconstruction STP L Elephant Butte I-25 Exit $452 $65.81 Reconstruction STP S 2010, Revised 2003/ REVISED All but ITS N Preliminary design complete, final design to be completed upon project funding Safety factors have been addressed concerning Exit 83 in the past. 4 Stewart East Bayard 5 6 New School Road Hermanas Grade Date Bisbee Rd. & Int. of NM9 T or C 7 NM 11 8 NM Hidalgo 9 Pear Pear /Nickel Construct a new culvert crossing on Stewart New School Road Intersection Improvments ft. $452 $65.81 STP L $3,600 $ STP S Luna Hermanas Grade $3,600 $ STP L Florida Thru-lane Widening from NM 11 to Santa Barbara Riley and Tyson Low Water Crossings Pear & Nickel Drai nage & Reconstruction of Intersection 0.20 $202 $29.41 Reconstruction STP S OR L 200 ft. $710 $ STP S OR L Pear/Nickel $510 $74.26 Reconstruction STP L 2003/ REVISED N N N N N N LGRF FUNDED ANNING & DESIGN; CONSTRUCTION ONLY NEEDED. Children safe route from school to food service, business center, and on Existing Roadway. Curb would act as a buffer. US border patrol use more than 50%, Appropriations request Feb. for $500,000 to address lowwater crossings SURVEYS TO BEGIN APRIL, HIGH TURNING VOLUMES/ REDUCED TRAFFIC FLOW; FLOODING CAUSES ISOLATION OF VIRDEN FROM EMERGENCY RES, ETC. Moved from s in Planning and design completed, additional funding requested through CDBG program for construction. 10 Pear Pear /8th Pear & Sl ate Intersection reconstruction to include drainage 0.25 $285 $41.50 Reconstruction STP L Subtotal of Roadway s: $12,175,000 $1,772,680 N Planning and design completed, additional funding requested through CDBG program for construction. Page 1 CRTIPR

2 Enhancement Recommendations: TE: Enhancement requirements include the following: 1) local county, municipal or tribal sponsor, 2) two local resolutions (early recognition of governing body and later commitment of matching funds), and 3) cost breakdown for 25% local match (excluding design costs) 1 NM 356 N. Foy to US 180 Bayard 2 Bayard 0 Santa Clara South side of NM 356 from N. Foy to US 180 PHASE II, ENHANCEMENTS ON BAYARD ST $ MATCH IN (25%) Pending agreement w/nmdot see PIF attachment 0.37 $1,652 $ nd Silver City Swan to NM $518 $ Cedar Sidewalks East Country Club Road east to the intersection with Pine /I-10 connector on south side of Cedar sidewalk, ADA improvements, reconstruction of deteriorated curb and gutter Sidewalks/LIGHT ING Sidewalks and Transit Stops RESOLUTI ON SUBMITTE D (Required) YEAR, IF! TPE TPE TPE 1.35 $399 $99.75 Sidewalk TPE Yes, M arch 2000/REVISED 2006/REVISED - 4 certificati on renewals 1 SOLU APICABLE ABOVE Phase I improvements were constructed the summer of 2010 utilizing ARRA and TPE funding. Roadway recently completed through CN3303. BID FOR DESIGN JULY ; CREATION OF SIDEWALKS AND TRANSIT IMPROVE SAFETY FOR SRTS 5 s Town of Silver City Little Walnut to Cain Drive across to Swan St and Silver down Gold to 12th up Grant 5.00 $950 $ Bike lanes, widening of shoulders, painting, lighting, sidewalks TPE 2009/REVISED CREATES CONNECTIVITY THROUGHOUT TOWN FROM THE RTH TO THE SOUTH 6 7 s Cedar Sidewalks West 0 Santa Clara Prescott, Cedar, Cleveland, and Oak. 0.6 $193 $48.25 Sidewalks TPE Pine to ~500ft. West of Yes, Country Club Rd. on 0.95 $178 $44.50 Sidewalk TPE M arch south side of Cedar Subtotal of Enhancements Category: $3,890,000 $972, /REVISED ACES SIDEWALKS IN AREA AROUND ELEM.; SAFER FOR STUDENTS Recommendations: TE: projects are listed here for reference purposes only. They are not presented as RPO prioritized projects. The projects are evaluated on their own merits. MATCH IN (20%) On System (ON) or Off System (OFF) YEAR, IF! 1 SOLU APICABLE ABOVE 1 I-25 Exit-41 Village of Hatch Hatch Interchange 0.50 $800 $16 Hatch Interchange and Turning Lanes OFF 2003/REVISED LOCAL BUSINESS HAS LOCATED ON RTH SIDE OF I-25 AND REQUIRES ACCESS FROM SOUTH SIDE. Page 2 CRTIPR

3 2 Maple Santa Cl ara Maple 100 ft. $830 $ #8582 Flood Control Socorro Escondida 0.03 $1,580 $ Oak Santa Cl ara Oak 125 ft. $1,000 $20 5 #2628 Schole Socorro Schole 1.00 $1,275 $ NM Grant Bear Creek Crossing 350 ft. $2,500 $50 Subtotal of Category: $7,985,000 $1,597,000 Replacement Replacement OFF Off Off On On 1997/REVISED 2010/REVISED 2005/REVISED 2010/REVISED 1995/REVISED SUBSTRUCTURE RATING OF 4 INSUFFICIENT, TRAFFIC SAFETY FEATURES RATES INADEQUATE; NMDOT APIED FOR HSIP FY 10 ONLY IDGE OVER FLOOD CONTROL PROVIDES ACCESS TO MANY FARMS. COULD BE USED AS A DETOUR IN SEVERE FLOODING. UNSAFE CROSSING FOR EMERGENCY PERSONNEL, PRIMARY BUS CROSSING FOR NEW SCHOOL UNDER CONSTRUCTION IDGE CONSTRUCTED IN 1930'S THUS HAVING OUTLIVED ITS USEFUL LIFE. WEIGHT CAPACITY DISAYED EMERGENCY PERSONNEL UNABLE TO CROSS WHEN FLOODING Scenic Byways Program Recommendations: TE: 20% local match, all federal funds are on a reimbursement basis. Total Cost of Scenic Byways Program: MATCH IN (20%) $0 $ $0 $0 YEAR, IF! 1 SOLU APICABLE ABOVE Planning Recommendations: Note: Required Local Government Match is subject to change by FHWA at the time of agreement. Professional Services COST [] MATCH IN Professional Svcs Match only - does not include match required YEAR(S), IF! 1 SOLU APICABLE ABOVE 1 M apl e M apl e Santa Cl ara Maple 100 ft. $80 $750 $16.00 Replacement L SUBSTRUCTURE RATING OF 4 INSUFFICIENT, TRAFFIC SAFETY FEATURES RATES INADEQUATE; NMDOT APIED FOR HSIP FY 10 2 Cedar 1.20 Cedar connection near Pearl 0.40 $194 $985 $28.25 Reconstruction L CITY WANTS TO USE PEARL ST. PROGRAMMED FOR FY '13; CHANGE OF TERMINI AND SCOPE NEEDS TO BE APPROVED VIA COMMISSION Page 3 CRTIPR

4 3 NM113 4 US180 5 NM Swan 38th St 7 N. 8th St 8 Country Club Rd. N. 8th/2nd. 9 Pine Loop (FL 5339) 13 NM Hidalgo Grant Hidalgo Town of Silver City 14 All 0 Santa Clara 15 Oak Oak 16 NM s 32nd Santa Clara Grant 0 Santa Clara Silver City Int. 9 & 113 to Mini Farms REDESIGN OF CULVERTS & CROSSING Hwy 180 & Kirkland Rd. On Hwy 80 from MP 31 S. to AZ State Line Drai nage & Improvements on Swan From 38th to Cain Dr. From 2nd. to New School to include Chaparral Blvd. On Country Club R. from Florida to Pine Pine /Spruce realignment of Intersection Truck Bypass to NM 26 from Exit 85 Interchange to NM 26 Reconstruction 8th Reconstruction from to Loop 22 NM 11 from Pear to Florida Transportation Master Plan Oak Bear Creek Crossing Prescott, Cedar, Cleveland, and Oak. Swan to NM ft. $56 $445 $8.15 Reconstruction S OR L 0.20 $80 $420 $11.65 Reconstruction S OR L $800 $4,115 $ Reconstruction S OR L 0.35 $185 $1,118 $26.94 Reconstruction L 0.82 $124 $723 $18.05 Reconstruction L 1.00 $239 $1,450 $34.80 Reconstruction S 0.28 $187 $1,033 $27.23 Reconstruction S 3.16 $2,520 $20,000 $ S 3.90 $335 $1,897 $48.78 Reconstruction S OR L 0.93 $394 $2,413 $57.37 Reconstruction S OR L 0.50 $356 $1,980 $51.83 Reconstruction S OR L All $50 $0 $1 Master Plan L ft. $400 $650 $8 New L 200 ft. $948 $1,552 $ S OR L 0.6 $50 $400 $12.50 Sidewalks L $74 $445 $18.50 Sidewalks and Transit Stops L FLOODING ACROSS CREATES HAZARD FOR USBP AND MILITARY TO AYAS; PIF 2010 for Planning and Design; Moved from in SAFETY CONCERNS; PIF IN 2010 FOR ANNING AND DESIGN SAFETY HAZARD; PIF 2010 for Design and Planning. DESIGN YET; ENGINEERS HAVE DONE COST ESTIMATE AND SCOPE OF WORK T EQUIPPED FOR SAFE BUS TRAVEL/PIF '10 FOR ANNING AND DESIGN CREATE TURNING LN./ ADD SHOULDERS; FY 10 PIF ANNING & DESIGN COMETION OF ARRA ES11220; FY 10 PIF FOR ANNING & DESIGN SAFER TRAFFIC FLOW WITH TRUCK TRAFFIC ON CREATED BY-PASS; FY 10 PIF FOR ANNING AND DESIGN CREATION OF CENTER TURN LANE; FY 10 PIF FOR ANNING & DESIGN CREATION OF MID. TURN LN. AND SIGNALIZATION; FY 10 PIF FOR ANNING & DESIGN CREATE TURNING LN./WIDEN SHOULDERS; FY 10 PIF FOR ANNING & DESIGN WOULD AID IN FUTURE AND ID OF DETERIORATING WAYS. UNSAFE CROSSING FOR EMERGENCY PERSONNEL, PRIMARY BUS CROSSING FOR NEW SCHOOL UNDER CONSTRUCTION EMERGENCY PERSONNEL UNABLE TO CROSS WHEN FLOODING ACES SIDEWALKS IN AREA AROUND ELEM.; SAFER FOR STUDENTS BID FOR DESIGN JULY ; CREATION OF SIDEWALKS AND TRANSIT IMPROVE SAFETY FOR SRTS Page 4 CRTIPR

5 19 s 20 NM Cedar Sidewalk s East N. Foy to US 180 Town of Silver City Bayard Little Walnut to Cain Drive across to Swan St and Silver down Gold to 12th up Grant South side of NM 356 from N. Foy to US 180 Country Club Road east to the intersection with Pine /I- 10 connector on south side of Cedar 5.00 $50 $900 $ $80 $375 $19.91 Bike lanes, widening of shoulders, painting, lighting, sidewalks sidewalk, ADA improvements, reconstruction of deteriorated curb and gutter L S OR L 1.35 $64 $335 $16.00 Sidewalk L CREATES CONNECTIVITY THROUGHOUT TOWN FROM THE RTH TO THE SOUTH Phase I improvements were constructed the summer of 2010 utilizing ARRA and TPE funding Cedar Sidewalk s West Oak & Bellm Planning and Design Bayard & Lari at Pine to ~500ft. West of Country Club Rd. on south side of Cedar Bayard & Village of Oak, east to Santa Cl ara Bellm and south to Lariat 0.95 $32 $147 $8.00 Sidewalk L 0.60 $260 $1,721 $65.00 Reconstruction curb and gutter, paving, sidewalks and lighting L The improvements will ensure continuity of planning, design and construction completed on CN3303 to include the second section of the principal route through Santa Clara. Subtotal for Planning Category: $7,557,640 $43,854,000 $1,244,442 South Central RPO Safety s Professional Services COST [] YEAR(S), IF! 1 SOLU APICABLE ABOVE 1 New School Rd. Date 2 I-25 Exit 83 SB 3 E. Frontage Rd, I-25 T or C Elephant Butte 0.99 Socorro 4 NM 51 MP 3.5 T or C Date and New School Rd. Intersection Improvments 1.00 $550 New School Rd. S Yes (3) No Yes Unk Yes 1-25 SB Exit $2,500 Otero-Rax-I-25 Frontage Rd. Sidewalk on 3rd 2nd Phase 0.30 $1, $150 Reconstruct Interchange Extend Frontage Rd and Provide Ped/Bicycle Path Extend Sidewalk from Phase I S Yes (6) No Yes Unk Yes S Yes (3) No Yes Unk Yes S Yes (2) No Yes Unk Yes Children safe route from school to food service, business center, and the need for curb to act as a buffer for walking children Re-Configure Interchange for improved safe egress and ingress, to eliminate confusion, improve traffic flow. Provide access and mobility on East side of I-25 where frontage ended. To extend pathway so pedestrians and wheel chai rs wi l l have a safer way to travel without having to use the busy highway shoulder. Page 5 CRTIPR

6 5 SR 52 MP 28 Sierra 6 I Socorro City 195 Upper Lake 4th & Date Near Winston from Cuchillo 0.20 $600 Winston NM 53, Low water crossing S Yes (2) No Unk Unk Yes T or C Sidewalk on Date 1.60 $2,000 Extend Sidewalk S Yes (2) No No Unk Yes Socorro.3 mi N of Elephant Butte Hot Springs State Park Cove North El Camino Real to South Parkview School "S" Curve- Rock Canyon Rd $39, $440 Sidewalks for Pedestrian Safety where curb and gutte are in place. Improve Dangersous "S" Curve S Yes (2) No Unk Yes S Yes (2) No No Unk Yes Flooding prevents emergency access. There is only one way in and out. Needs Box or to allow traffic to cross when heavy rainfall occurrs. Sidewalks needed to accommodate To add sidewalk to various streets in residential and commercia areas. Socorro will provide labor requesting only materials from this funding. Dangerous curve which has contributed to many accidents Upper Lake Rd. EB Dam- Monticello Pt. Elephant Butte State Park Along Elephant Butte Lake $600 Safety Improvements of route and removes pedestrians and bicycles from roadway S Yes (2) No No Unk Yes Provides pedestrian and safety to riders and provides a separation of car traffic with pedestrians and bicycles NM 51 and NM142 Hatch Sidewalk MP 3 NM51 and MP 9 NM142 Sierra 1.00 Village of Hatch MP 3 NM51 and MP 9 NM within village limits 6.00 $1, $ NM Sierra MP $2, Ridge Road Williamsburg Ridge Road 0.40 $160 *SWRPO projects for Catron and Village of Reserve were not included in this document, but were included in the CRTIPR for NMDOT District 6 Install guardrail, widening and installation of rockfall netting Sidewalks for Pedestrian Safety and bicyclists Real i gn roadway and provide guardrail and drai nage structures Roadway, flood control S Yes (2) No Yes Unk Yes S Yes (2) No Unk Unk Yes S Yes (2) No Unk Unk Unk S Yes (3) No Unk Unk No Guardrail and Rock Netting will preven vehicles from traveling over stepp should and provide protection from falling rock. No sidewalks exist near the Municipal Building, Community Center, and business area which is surrounded with multi-family apartments. Safer route to correct blind corners and provide better site distance on Red Hill section of NM 52 This would allow improved access to Ridge Rd thereby provide better access for emergency personnel. It also will help reduce flooding. Page 6 CRTIPR

SOUTHWEST RPO RTIPR for NMDOT District 1. for 7 Year STIP (FY 2012 through FY 2018) Roadway Project Recommendations:

SOUTHWEST RPO RTIPR for NMDOT District 1. for 7 Year STIP (FY 2012 through FY 2018) Roadway Project Recommendations: Key: New s SOUTHWEST RPO RTIPR for NMDOT District 1 for 7 Year STIP (FY 2012 through FY 2018) Roadway Recommendations: Note: Required Local Government Match is subject to change by FHWA at the time of

More information

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. $16,000-$20,000 (higher estimate in total - below)

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. $16,000-$20,000 (higher estimate in total - below) NWRPO, SWRPO, MRRPO Regional Transportation Improvement Program Recommendations (RTIPR/) for NMDOT District 6 2013-2018 for 6 Year STIP (FY 2012 through FY 2017) Final as prioritized by NWRPO, SWRPO, MRRPO

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. Road Reconstruction - paving, widening, shoulders, drainage improvement

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. Road Reconstruction - paving, widening, shoulders, drainage improvement Northwest RPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, ) & District 5 (San Juan) 2015-2020 for 5 Year STIP (FY 2015 through FY 2020) FINAL Prioritized

More information

REVISION 2 Prioritized by NWRTPO

REVISION 2 Prioritized by NWRTPO Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2017-2022 for 5 Year STIP (FY 2017 through FY 2022) REVISION

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Development Review Program Annual Report 2016

Development Review Program Annual Report 2016 Development Review Program Annual Report 2016 Web version Spring 2017 http://museumplacesanjose.com/ http://www.elcaminohospital.org City of Campbell Council Agenda Packet 9/13/16 Gunter Lofts Development

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

SNCC Demographic Trends

SNCC Demographic Trends Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

2015 Data review. Capturing Ready Lane NEXUS vehicles

2015 Data review. Capturing Ready Lane NEXUS vehicles 2015 Data review Capturing Ready Lane NEXUS vehicles Problem: NEXUS users make up the majority of traffic using the Ready Lane, but they are currently considered either standard traffic or Ready Lane traffic.

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Executive Summary. September 3, 2014

Executive Summary. September 3, 2014 D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

RE: Park Plaza Walgreens (P12-016)

RE: Park Plaza Walgreens (P12-016) 12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at

More information

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community

More information

Route 15 Congestion Report Findings

Route 15 Congestion Report Findings Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1 Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

Road Safety Evaluation ation A process to investigate traffic safety on tribal, county, or city roadways Roadway may be selected for evaluation if the

Road Safety Evaluation ation A process to investigate traffic safety on tribal, county, or city roadways Roadway may be selected for evaluation if the Road Safety Evaluation Shoalwater Bay Roads WSDOT Highways & Local Programs Road Safety Evaluation ation A process to investigate traffic safety on tribal, county, or city roadways Roadway may be selected

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis) Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Complete Streets Training. Georgia Municipal Association June 27, 2016

Complete Streets Training. Georgia Municipal Association June 27, 2016 Complete Streets Training Georgia Municipal Association June 27, 2016 Overview What are CS? GDOT s Policy Case Study 2 What are Complete Streets? According to the National Complete Streets Coalition, complete

More information

Project Application. Project Location: Salem Drive (Federal Route 1101)

Project Application. Project Location: Salem Drive (Federal Route 1101) Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project

More information

Hampton Roads Pedestrian and Bicycle Advisory Committee

Hampton Roads Pedestrian and Bicycle Advisory Committee Hampton Roads Pedestrian and Bicycle Advisory Committee HRTPO Transportation Technical Advisory Committee November 6, 2013 Carl E. Jackson III, AICP Transportation Planning Specialist Hampton Roads District

More information

NORTH HIGHLAND LAKE ROAD PROJECT

NORTH HIGHLAND LAKE ROAD PROJECT NORTH HIGHLAND LAKE ROAD PROJECT The purpose of this special newsletter is to inform the residents of Flat Rock about the facts concerning the proposed N. Highland Lake Road Project and clarify some misconceptions.

More information

US Route 4 Traffic and Pedestrian Improvement Project

US Route 4 Traffic and Pedestrian Improvement Project Welcome to the public meeting for US Route 4 Traffic and Pedestrian Improvement Project June 5, 2018 Introduction Project Team Town of North Greenbush, Tony Germano, Town Comptroller Lou Desso, Town Supervisor

More information

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Part 1: General Information Funding

More information

Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS

Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS Introduction The US-41/M-28 Access Management Plan was the first of its kind in the Upper Peninsula. Since 2004, when the Corridor Advisory Group first

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Agenda Item No. 6C ATTACHMENT 1

Agenda Item No. 6C ATTACHMENT 1 ATTACHMENT District Bike Plan Proposed s Hillside Ln Livermore D TAC

More information

INTERSECTION DESIGN TREATMENTS

INTERSECTION DESIGN TREATMENTS Designing for Bicyclist Safety INTERSECTION DESIGN TREATMENTS LEARNING OUTCOMES Understand intersection design options and features Select appropriate design feature for a bikeway in a given context C1

More information

Physical Implications of Complete Streets Policies

Physical Implications of Complete Streets Policies Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

Bellevue Downtown Association Downtown Bike Series

Bellevue Downtown Association Downtown Bike Series Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate

More information

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region 2014 Wisconsin Tribal Transportation Conference Matt Halada Transportation Planner NE Region Implementing Wisconsin s Pedestrian and Bicycle Accommodations Law (Complete Streets) Tools and methods for

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information