SALINITY AND DISSOLVED OXYGEN IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL AND IN ADJACENT SURFACE WATERS,

Similar documents
Inner Harbor Navigation Canal (IHNC) Basin 1% (100-yr) and 0.2% (500-yr) Surge and Wave Event Water Levels

Information for File # SEW

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

COASTAL MORPHODYNAMICS

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here.

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

MEAN LOW TIDE (MLT) to MEAN LOWER LOW WATER (MLLW)

Bridge Design for Marine Vessel Collision

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

natural low-water ' conditionson tamed Mississippi, new life springs, up Vl ' V ' ' - "

WATERWAYS AND HARBORS DIVISION Proceedings of the American Society of Civil Engineers. EQUILIBRIUM FLOW AREAS OF INLETS ON SANDY COASTS a

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

Causes and Monitoring of Hypoxia in Corpus Christi Bay

FIU Digital Commons. Florida International University. Henry O. Briceño Florida International University,

Lecture 1 Why Do We Have Levees in Louisiana? J. David Rogers, Ph.D., P.E., R.G.

2017 Annual Report: Survey pf American Alligators (Alligator mississippiensis) in the Big Thicket National Preserve. Summary.

STUDY PERFORMANCE REPORT

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

Modeling 3D circulation in the Choctawhatchee Bay and River System

Water Resources Report RKLD Annual Meeting July 30, 2016

Modeling of Oxygen Injection Experiment in Savannah Harbor

HURRICANE NATE BRIEFING

Properties. terc.ucdavis.edu 8

Annex E Bridge Pier Protection Plan

JAP Additional Information Sheet

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W.

CROSS-SHORE SEDIMENT PROCESSES

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License

ELEVATIONS FOR DESIGN OF HURRICANE PROTECTION LEVEES AND STRUCTURES

Hydrologic Feasibility of Storm Surge Barriers

HURRICANE NATE BRIEFING

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

CLAIBORNE LOCK AND DAM PERTINENT DATA

Southeast Volusia Coastal Projects Update

N. Tay Evans Marine Fisheries Biologist & Technical Review Coordinator

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

LITTLE LAGOON & LITTLE LAGOON PASS: RESEARCH UPDATES & DIRECTIONS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

The Ike Dike. A Coastal Barrier Protecting the. Hurricane Storm Surge. Protecting the Houston/Galveston Region from Hurricane Storm Surge

Staying in Tune with South Florida s Water Cycle for Scientists, Managers, and Policy Makers in 5 Minutes per Week

Wave Transformation, Prediction, and Analysis at Kaumalapau Harbor, Lanai, Hawaii

NYS Coastal Waters. Water Resources of NYS: THE NATURE of the COASTAL ZONE. NYS Coastal Waters. NYS Coastal Atlas. Coastal Zone Management 10/10/2014

Citrus, Hernando, and Pasco Coastal Hazard Analysis. Flood Risk Review Meeting Citrus, Hernando, and Pasco Counties, Florida December 14, 2017

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

Developing Back Bay. Pre-Handout. Scope and Background

Town of Duck, North Carolina

Illinois State Water Survey

OFFICE OF HOMELAND SECURITY & EMERGENCY PREPAREDNESS MISSISSIPPI RIVER LEVEE DISTRICTS DAILY COMMUNICATION & READINGS LOG

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

Ninilchik Harbor Page 2 of 11

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

Figure 1 GE image of the Costa Sur & EcoEléctrica power plants, located inside Guayanilla and Tallaboa bay.

STREAM SURVEY File form No..

Technical Report Culvert A Hydraulic Analysis

Climate Change Impacts to KSC Launch Complex

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Instrumented Ballast Tank Studies to Examine Ballast Management Practices

Municipal Adaptation to Sea Level Rise in Saco Bay, Ogunquit, and Seabrook

Site selection criteria. Stream selection criteria

Eastern Equatorial Pacific

Grays Harbor Federal Project

Exercise (4): Open Channel Flow - Gradually Varied Flow

Types of Estuaries and Mixing Patterns. Mrs. Stahl Marine Science Honors

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed.

DEAD-ENDCHANNELFLUSHINGINHARBORS

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Swimming against the tide gates. Paul Franklin

State of Texas Operations and Maintenance

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

Potomac River Water Quality: Current Status & Trends

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363

Annual Meeting June 17, Research Stewardship Education

OYSTER REEF RESTORATION; RESTORING ECOLOGICAL FUNCTION

OPERATIONS Western Gulf Coast Edition TX DOT Ports & Waterways Conference 2009

Town of Duck, North Carolina

SHOALING PREVENTION: AN ALTERNATIVE TO DREDGING

Sussex County, DE Preliminary Study Overview

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

CHAPTER 134 INTRODUCTION

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning

RESPONSE TO COMMENT: 45

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

FINAL REPORT APPENDIX A. Physical Description of the Shubenacadie River

MIKE Release General product news for Marine software products, tools & features. Nov 2018

Oxbows and Sloughs: Wisconsin s Forgotten Lakes

Transcription:

SALINITY AND DISSOLVED OXYGEN IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL AND IN ADJACENT SURFACE WATERS, 2008-2012 Southeast Louisiana Flood Protection Authority-East Coastal Advisory Committee Meeting January 17 2014 CHRISTOPHER SWARZENSKI US Geological Survey Louisiana Water Science Center, Baton Rouge

UNITED STATES GEOLOGICAL SURVEY LOUISIANA WATER SCIENCE CENTER (BATON ROUGE) - collect and disseminate groundwater and surface-water data (quality and quantity) - offices in all 50 states and Puerto Rico - support Federal, State and Local Agencies with data collection needs and sometimes interpretation 1/23/2014

REAL-TIME ACCESS TO DATA ON WWW 1/23/2014

MONITORING WATER QUALITY EFFECTS OF HYDROLOGIC MODIFICATIONS TO MRGO NAVIGATION CHANNEL Co-operator: US ARMY CORPS OF ENGINEERS, NOD (Barb Kleiss, Laura Lee Wilkinson) - two projects, related to construction of rock barrier and Hurricane Surge Risk Reduction complex (Borgne surge barrier, Seabrook gate) - used a combination of data logging sondes measuring temperature and salinity, and transects with depth-averaged profiles of dissolved oxygen, salinity, temperature Two reports: Swarzenski, Mize and Lovelace, 2012, Water-Quality, Bed-Sediment, and Discharge Data for the Mississippi River-Gulf Outlet and Adjacent Waterways, Southeastern Louisiana, August 2008 Through December 2009, USGS open file report 2012-1056 Swarzenski and Mize, 2014 Effect of Hydrologic Modifications on Salinity and Formation of Hypoxia in the Mississippi River Gulf Outlet and Adjacent Waterways, Southeastern Louisiana, 2008-2012, in final review, ready for priniting 1/23/2014

Discharge at IHNC at Seabrook bridge (negative flow into the Lake) 15000 DISCHARGE IN CUBIC FEET PER SECOND 10000 5000 0-5000 -10000-15000 -20000 May 1 May 8 May 15 May 22 COMPUTER INSTANTANEOUS DISCHARGE IN THE INNER HARBOR NAVIGATION CHANNEL AT SEABROOK BRIDGE, MAY 2013

Rock Barrier Borgne Surge Barrier Seabrook Flood Complex

IHNC 10 ft Transect 6 Near GIWW 10 ft Transect 5AV Lake Borgne 7 ft Transect 5BV 6 Inbetween Transect 4 IHNC Near GIWW 10 ft 10 ft 10 ft 5A Lake Borgne 10 ft 5 Transect 3 Violet Canal Explanation Downstream Inbetween 10 ft Synoptic measurement 4 Explanation 10 and 20 ft Continuous Sonde 3 Downstream 10 ft 2 Transect 2 1 Transect 1 Barrier 1/23/2014

35 30 Rock barrier completed Surge barrier completed Period when there was a cofferdam across IHNC Salinity, in parts per thousand 25 20 15 10 5 0 Jan. 1, 2009 Jan. 1, 2010 Jan. 1, 2011 Jan. 1, 2012 Jan. 1, 2013 SAMPLING SITES Industrial Canal at I-10 at New Orleans(site 21) MRGO near mile 59 near Michoud (site 11) MRGO near mile 46 near Yscloskey (site 8) Lake Pontchartrain at Seabrook bridge (site 20) Lake Borgne near MRGO near Violet (site 12) MRGO near mile 35 near Hopedale (site 5)

DEPTH-AVERAGED SALINITY CONTOURS IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL, AUGUST 2008

DEPTH-AVERAGED SALINITY CONTOURS IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL, AUGUST 2010

Depth in feet Depth in feet Salinity in parts per thousand 10 12 14 16 18 20 22 24 26 28 0-5 -10-15 -20-25 -30-35 -40 August 15, 2008 Water temp 24-28 degrees C -45 0 2 4 6 8 10 Dissolved Oxygen in mg/l Salinity in parts per thousand 10 12 14 16 18 20 22 24 26 28 0-5 -10-15 -20-25 -30-35 -40 June 10, 2009 Water temp 26-31 degrees C -45 0 2 4 6 8 10 Dissolved Oxygen in mg/l Depth in feet Depth in feet Salinity in parts per thousand 10 12 14 16 18 20 22 24 26 28 0-5 -10-15 -20-25 -30-35 -40 March 11, 2009 Water temp 15-20 degrees C -45 0 2 4 6 8 10 Dissolved Oxygen in mg/l Salinity in parts per thousand 10 12 14 16 18 20 22 24 26 28 0-5 -10-15 -20-25 -30-35 -40 Nov 3, 2009 Water temp 20 degrees C -45 0 2 4 6 8 10 Dissolved Oxygen in mg/l GRAPHIC 4 TIME SERIES OF DISSOLVED OXYGEN AND SALINITY PROFILES AT TRANSECT 2 DOWNSTREAM OF AND CLOSEST TO BARRIER (ABOUT 2 MILES BELOW BARRIER) Dissolved oxygen Salinity 1/23/2014

Water depth, in feet Surge barrier Violet Canal Rock barrier 59 54 52 44 37 34 30 27 mile 20 0-10 -20-30 -40 EXTENT OF HYPOXIC CONDITIONS (IN DARK GREEN) IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL, OCTOBER 2009

Timing and depth of hypoxic (D.O. < 2 mg/l) conditions in MRGO 2010 T4 T5BV T5AV T6 GIWW west May 28-37 ok 30-36 ok ns June 31-37 29-34 ok ok 35-40 July 30-37 ns ok ok ok August 30-37 ok 32-36 ok 31-40 Sept ns ok ok ok ok Oct ok ok ok ok ns 1/23/2014

Timing and depth (ft) of hypoxic (D.O. < 2 mg/l) conditions in MRGO 2011 T4 T5BV T5AV T6 GIWW west January ok ok ok ok ok March 32-37 30-34 30-36 ok ok May ok ok ok ok ok June 30-37 ns ns ok ns July 28-37 25-34 25-36 35-40 35-40 August 28-37 26-34 24-36 ok ok Sept 28-37 29-34 27-36 ok 33-40 Oct ok 32-34 ok ok ok Dec ok ok ok ok ok 1/23/2014

Timing and depth of hypoxic (D.O. < 2 mg/l) conditions in MRGO 2012 T4 T5BV T5AV T6 GIWW west March ok ok ok ok ns May 30-37 ns ok ns 35-40 June 32-37 ok ok ok ok July 30-37 28-34 30-36 ok ok 1/23/2014

0.4 mg/l, 10/11 4.7 mg/l, 7/12 4.5 mg/l 7/12 1.2 mg/l, 9/10 0.7 mg/l, 6/12 Lowest dissolved oxygen measured at DEQ stations and date; At DEQ 13, hypoxic conditions extended along entire 5 ft channel depth; at DEQ 5 hypoxic conditions occurred more than once 1/23/2014