S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !

Similar documents
CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

GENERAL LEGEND 12"CMP

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW


Riverside County Transportation Department Summary of Bids

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Developing a Portwide Asset Management Program

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

PROPOSAL. PROPOSAL OF, a corporation a

NARRATIVE FOR SERENITY HILL OF HALSTED BAY SERENITY HILL OF LAKE MINNETONKA, LLC


CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Planning & Zoning Commission

'!' CORDOVA BRANDON GREEN

CITY OF SOUTH DAYTONA

Engineering Design Criteria & Standard Drawings

CONCEPT STUDY. Kasold Drive Improvements (6th Street to Bob Billings Parkway) Lawrence, Kansas PREPARED FOR

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

SECTION 3 STREET DESIGN

City of Margate, Florida. Neighborhood Traffic Management Manual

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

CITY OF ROSEVILLE DESIGN STANDARDS

Reserve Study Navigation Options

Tabulation of Bids. Counties:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate

City/ Town: Route: Intersection Name; Street Names:

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

Northside School Class I Bike Path, Cool, CA Application Attachments

SECTION VII ROADWAY AND SITE IMPROVEMENTS

Midway City Council 15 January 2019 Regular Meeting. Homestead Villas / Preliminary Approval

22. Specialty Valves.

Stormwater Management Report for the Macri Dixon Condo Block

DISTRICT BICYCLE PROGRAM

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

CITY OF ZUMBROTA ORDINANCE NO

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Item No. 14 Town of Atherton

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

JAP Additional Information Sheet

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.

POLICY REVIEW SUMMARY

SECTION PRESSURE TESTING OF PIPING

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Office Use Only Fee Paid

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Watermain Replacement and Connection Procedure

City of Columbia Engineering Regulations Manual

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

Lecture 10 : Sewer Appurtenances

APPENDIX L: COST ESTIMATING TOOLS

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A

CHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive

TABLE OF CONTENTS POWDER SPRINGS UNIFIED DEVELOPMENT CODE ARTICLES

4 GENERIC COST ESTIMATING TOOL

Village of Lombard. Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL Tel: Fax:

Assessment of Soil Erosion at a DC Park Facility Spring Valley Park NW Washington, DC

TITLE 16 STREETS AND SIDEWALKS, ETC. 1 CHAPTER 1 MISCELLANEOUS

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

Tabulation of Bids. Counties:

Derby Street. Project Updates. Salem, Massachusetts

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

RZC Appendix 8A Marymoor Subarea Street Requirements

Section 4: Inventory Methodology and Findings

Town of Tupper Lake Water and Sewer District Consolidation Study

APPENDIX E Activity Defect Assignment

CTH M HIGHWAY PROJECT CTH Q to STH 113

IMPLEMENTATION WORKBOOK

Facility Condition Assessment Report

Transcription:

- F - r-=-::--;;m11s.. THTHESE DRAWNGS CONSTRUCTON OTE: TD SOllE BE CONS DETAllS TYPCAL DH PlANS. AND NLY - NTT FOR PERMT OR El NOT BE R :tt eecce lll""' FAMLAR,_ EASBLJTY O.,."',_"'.,.. "' CTRONA DRVE 25-FT LANDSCAPE BUFFER LNE CTRONA DRVE R.O. w. LNE _,_ -, LOT 5 S TREET (TO DADE ) BE MPROVED 96.3' - -, 1------ i---- LOT 6 ") G/ ' --o- LOT 7 LOT LNE (TYP), so. a - - r- - r - so. o, LOT 1 POND T.O.B ci LOT 2 (() 1.' ONE-WAY LOT 3 ROAD LOT 4 LOT 8 - _/ 11)!1) LOT 9 LFT STAT/ON ----- 2.' J 4. O'!1) so.a LOT 14 LOT 13 so.a LOT 15 EXST. LARGE TREE (TYP) PROP. R.. W. LNE (TYP)!/LNE (TYP) 55 LOT 12 LOT 11!1) LOT 1 OPE. EXST. TREES TO REMAN 1. _ 5 -FT WDE s/w (TYP) oo PUD STE PLAN PRELMNARY 3 SCALE: 1. 'flllll""" c CTDH N... ' f-z -o t; w::::> D.."' "' ii i. (.!) u z: 2; -z w >-u "' ZO... "'. "' D.. "' : C3 cl <( "'... z E 1- :z v ") u o en N (]) ") +-' c _J u i.j._ en :::c - en c u (]) =fil CD = o. <( z z <( z* a::: w i.j._ m * ex; ti '? w a::: <D - N en..r::: v +-' vm v:i w z oo N w <C :::::!: ::: a... J _J W LL W> e::::: > ::: ::r::" WW OU :zo <CL5 W Zm CD> ::: <C e::::: - :z wo uo <( :z e::::: 1-- u :z <C z ::: w LL DATE: 2-3-17 :r: Cl... GEOMETRY PLAN Key Sheet,..+:- PSP-1 W E Page of s

PRELMNARY COST ESTMATE SUMMARY Citrona Drive PUD Development Asa R. Gillette, P.E. 7-Feb-17 # lots: 15 DESCRPTON Project Area 1% Contingincy TOTALS $/LOT. EARTHWORK $13,61 $1,36 $14,367 $958 A. DADE ST. ROADWAY CONSTRUCTON $27,864 $2,786 $3,651 $2,43 B. SUBDVSON ROADWAY CONSTRUCTON $42,523 $4,252 $46,775 $3,118. DRANAGE SYSTEM $24,75 $2,475 $27,225 $1,815 V. WATER SYSTEM CONSTRUCTON $19,3 $1,9 $2,93 $1,394 V. SANTARY SEWER SYSTEM $58,3 $5,83 $64,13 $4,275 V. RECREATON AREA $5, $75 $5,75 $383 V. ENGNEERNG SERVCES $15,95 $1,595 $17,545 $1,17 V. SURVEYNG SERVCES $7,56 $76 $7,761 $517 X. LAND PLANNNG SERVCES $ $ $ $ TOTAL $213,56 $21,61 $235,17 $15,674 Asa R. Gillette, P.E. Page 1 2/7/217

PRELMNARY COST ESTMATE TEMZATON Citrona Drive PUD Development Asa R. Gillette, P.E. 7-Feb-17 ESTMATED ESTMATED ESTMATED TEM DESCRPTON UNT UNT COST QUANTTY AMOUNT PART - EARTHWORK 1 Roadway Earthwork (both streets) C.Y. $4.5 2,78 $9,35. 2 Pond Excavation C.Y. $2.5 1,484 $3,71.67 TOTAL PART - EARTHWORK $13,6.67 PART A - DADE STREET ROADWAY CONSTRUCTON 3 Clearing and Grubbing AC. $3,8..34 $1,38.54 4 Stabilized Subgrade (8") S.Y. $9. 778 $7,. 5 Limerock Base (6") S.Y. $1. 722 $7,222.22 6 Asphaltic Concrete (Type S-3) (1-1/2") S.Y. $12. 611 $7,333.33 7 Curb and Gutter L.F. $12. $. 8 Erosion Control L.S. $1,. $. 9 Sidewalk - 5' wide L.F. $2. 25 $5,. 1 Coquina Roadway S.Y. $1. $. 11 Signage EA. $25. $. TOTAL PART A - DADE STREET ROADWAY CONSTRUCTON $27,864.1 PART B - SUBDVSON ROADWAY CONSTRUCTON 3 Clearing and Grubbing AC. $3,8..51 $1,954.9 4 Stabilized Subgrade (8") S.Y. $9. 1,12 $1,8. 5 Limerock Base (6") S.Y. $1. 996 $9,955.56 6 Asphaltic Concrete (Type S-3) (1-1/2") S.Y. $12. 871 $1,453.33 7 Curb and Gutter L.F. $12. $. 8 Erosion Control L.S. $1,. $. 9 Sidewalk - 5' wide L.F. $18. 56 $1,8. 1 Coquina Roadway S.Y. $1. $. 11 Signage EA. $25. $. TOTAL PART B - SUBDVSON ROADWAY CONSTRUCTON $42,522.98 PART - DRANAGE SYSTEM 12 15" RCP L.F. $16. $. Asa R. Gillette, P.E. Page 1 2/7/217

13 18" RCP L.F. $27. $. 14 24" RCP L.F. $3. 32 $9,6. 15 3" RCP L.F. $36. $. 16 36" RCP L.F. $48. $. 17 42" RCP L.F. $58. $. 18 48" RCP L.F. $68. $. 19 6" RCP L.F. $79. $. 2 24" MES EA. $45. 12 $5,4. 21 3" MES EA. $5. $. 22 36" MES EA. $525. $. 23 48" MES EA. $55. $. 24 6" MES EA. $675. $. 25 Ditch Bottom nlet EA. $2,25. 3 $6,75. 26 Curb nlet EA. $2,3. $. 27 Manhole EA. $3,. 1 $3,. TOTAL PART - DRANAGE SYSTEM $24,75. PART V - WATER SYSTEM CONSTRUCTON: 28 Water Treatment Plant EA. $75,. $. 29 4" SCH 8 L.F. $11. $. 3 6" D.R. 18 PVC L.F. $12. 5 $6,. 31 8" D.R. 18 PVC L.F. $16. $. 32 1" D.R. 18 PVC L.F. $19. $. 33 4 " Gate Valve EA. $585. $. 34 6 " Gate Valve EA. $812.5 2 $1,625. 35 8 " Gate Valve EA. $1,4. $. 36 1" Gate Valve EA. $1,3. $. 37 Fire Hydrant Assembly EA. $2,5. 1 $2,5. 38 Flushing Valve EA. $65. 1 $65. 39 1" x 8" Cross EA. $5. $. Tees: 4 8" x 8" EA. $49.5 $. 41 8" x 6" EA. $364. 2 $728. 42 8" x 4" EA. $325. $. 43 6" x 6" EA. $325. $. 44 6" x 4" EA. $286. $. Reducers: Asa R. Gillette, P.E. Page 2 2/7/217

45 8" x 6" EA. $25. $. 46 8" x 4" EA. $25. $. 47 6" x 4" EA. $25. $. Bends: 48 1" - 45 Deg. EA. $4. $. 49 8" - 22.5 Deg. EA. $375. $. 5 6" - 45 Deg. EA. $35. $. 51 6" - 22.5 Deg. EA. $35. $. 52 4" - 45 Deg. EA. $3. $. 53 4" - 22.5 Deg. EA. $3. $. 54 8" Plug EA. $25. $. 55 6" - Plug EA. $25. $. 56 Lot Services EA. $5. 15 $7,5. 57 A/B Crossing EA $2,5. $. TOTAL PART V - WATER SYSTEM CONSTRUCTON $19,3. PART V - SANTARY SEWER SYSTEM 58 Sewer Treatment Plant EA. $1,. $. 59 8" Gravity Sanitary Sewer (includes dewatering) L.F. $38. 45 $17,1. 6 Sanitary Manhole (4' Dia - Type 'A') EA. $3,. 3 $9,. 6b Sanitary Manhole (4' Dia - Type 'B') EA. $4,5. $. 61 Sewer Service Laterals EA. $6. 15 $9,. 61a Force Main L.F. $16. 1,45 $23,2. 61b 4" Force Main L.F. $14. $. 61c Pump Station (8' Diameter) EA. $75,. $. 61d Minor Lift Station EA. $25,. 1 $25,. TOTAL PART V - SANTARY SEWER SYSTEM $58,3. PART V - RECREATON 62 Tennis Courts EA. $2,. $. 63 Swimming Pool EA. $3,. $. 64 Dock mprovements EA. $3,. $. 65 Community Park EA. $5,. 1 $5,. 66 Croquet Court EA. $2,. $. TOTAL PART V - RECREATON $5,. PART V - ENGNEERNG SERVCES 67a Underground Electric LOT $4. $. 67b Roadway and Subdivision Design per lot $8,75. 1 $8,75. Asa R. Gillette, P.E. Page 3 2/7/217

68 SJRWMD & COFB permitting PHASE $4,5. 1 $4,5. 69 Permit Fees PHASE $1,. $. 7 Potable Water Design EA. $1,5. 1 $1,5. 71 Wastewater Treatment Plant Design EA. $1,2. 1 $1,2. TOTAL PART V - ENGNEERNG SERVCES $15,95. PART V - SURVEYNG SERVCES 72 Topographic Survey ACRE $4. 3.35 $1,341.89 73 Tree Survey EA $7.5 5 $375. 74 Boundary Survey ACRE $25. 3.35 $838.68 75 Platting LOT $3. 15 $4,5. TOTAL PART V - SURVEYNG SERVCES $7,55.57 TOTAL $213,56 Asa R. Gillette, P.E. Page 4 2/7/217