EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

Similar documents
EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

Wellwork Chronological Regulatory Report

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

FORGE Energy UL 21 Pahaska 1H API Number:

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

ENDEAVOR ENERGY RESOURCES

Wellwork Chronological Regulatory Report

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

FORGE Energy UL 21 Freedom 1 API Number:

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Pasquale Imbò e Marco Pelucchi ENI S.pA;

DB Bridge Plug. Features. Benefits. Applications

HydroPull. Extended-Reach Tool. Applications

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

Drilling Morning Report

Live well deployment of long perforating gun system using combined CT technologies

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

BP SIT Testing Franks Facility Lafayette

Zarvona Energy LLC DAILY OPERATIONS

PHE KE30-A8 WORKOVER PROGRAM

Deepwater Horizon Incident Internal Investigation

Dynamic Underbalance (DUB)

Subsea Safety Systems

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Extended leak off testing

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Chapter 5 HORIZONTAL DRILLING

5k Slickline Lightweight Pressure Control Equipment 4 ID

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

OCEAN DRILLING PROGRAM

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Cased-Hole Logging Environment

Zarvona DAILY WORKOVER / COMPLETION REPORT

HPHT Annular Casing Packer. Obex Annular Casing Packer

Hydro-Mech Bridge Plug

RPSEA UDW Forum June 22 & 23, Secure Energy for America

SUBSEA KILL SHEET EXERCISE No. 5

Air and Gas Drilling

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Practice Exam IADC WellSharp Driller and Supervisor

RIH intermediate section casing in Bazian-1 exploration oil well

Introduction to Through Tubing Rotary Drilling

Engineered solutions for complex pressure situations

TAM Single SeT inflatable

1. The well has been shut in on a kick and the kill operation has not started.

Daily Drilling Report

Model A Sleeve Valve Cement Retainer

Study Guide IADC WellSharp Driller and Supervisor

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Hard or Soft Shut-in : Which is the Best Approach?

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

SPE MS. Copyright 2015, Society of Petroleum Engineers

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

Rig Math. Page 1.

The Developing Design of the Blowout Preventer in Deep Water

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA

Removal of hydraulic load holding valve incident causing injury

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Abandonment Program for Paramount Fort Liard F 36

E NGINEERED C EMENTING S OLUTIONS

Float Equipment TYPE 925/926

APPENDIX A1 - Drilling and completion work programme

and and Norton J. Lapeyrouse CONTENTS

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

Worked Questions and Answers

W I L D W E L L C O N T R O L COMPLICATIONS

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

W I L D W E L L C O N T R O L AIR DRILLING

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

PRESSURE TESTING REPORT

Transcription:

1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original Spud Date 02/02/2017 Est. Days 25.00 Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Bruce Smiley, Jeff Pontell Measured Depth(ft) Engineer Joddie Carlile TVD(ft) Other Supervisor Mike Reber 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,761.75 / 2,736.10 Hole size(in) THF Datum Daily (hr/%) 24.00/100.00 Days Ahd(-) Bhnd(+)(50/50) Actual cost to date/afe 1,964,038/4,757,442.00 Last Casing MD Next Casing MD Current MW / BH EMW(ppg) / Actual divided by AFE Daily Cost 0.41 92,643 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: 340 man hours 54 driving hours Drill Category Drill Type Detection (sec) Drills Complete (sec) Crew drilled Pass / Fail PIC Comments Coiled Tubing Surface rig-up leak above BOP (Lub./stuffing box, 116.00 Night Pass MIKE REBER Coiled Tubing Surface rig-up leak above BOP (Lub./stuffing box, 135.00 Day Pass BRUCE SMILEY/JEFF 107 S MUSTER HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 36 24 Hour Summary Operations Summary POOH with BHA #6, bump up, bleed, BD tools/fish, injection test, cleanout plug that did not come back with fish, RD CT package

2 bore Update Since Report Time Continue RD CT package 24 Hour Forecast Release equipment, haul work fluid to disposal

3 bore 0:00 2.25 00:30 3,370' current depth, POOH at 90 ft/min,.75 bpm / 3,800 WH and maintain 01:15 200' current depth, wait 30 min for guns to cool, go to radio silence and confirm no phones on location. 2:15 2:30 3:00 7:00 0.25 0.50 4.00 0.50 01:45 POOH and bump up, shut (2) 7-1/16" 10K FV and confirm, bleed off to gas buster, final well pressure 3,800 psi 02:00 BOP DRILL, muster #1 at entrance to location, head count, all hands present by sign in sheet, muster time 1 minute 56 seconds, dscuss pinhole, prevailing winds, buddy system, work yourself around side of location if on other side, good drill, enter into view and email field sups and HSE. Keane WL on location, on site orientation for crew, review expectations and policy, discuss recent LWC-finger incident 02:40 Pro torque break bolts on 5-1/18" 15K flange, don't lift lube off well 02:50 PAUSE, Keane WL opens explosive permit, review live guns BD procedure and recovery of same, minimal personnel in no go zone, prep to lift lube off well with expectation of live guns at surface, 12 questions for safe lift, PU lube off 15K Quad BOP's and swing to side Lower BHA #6 3.75" overshot dressed with 2.75" spiral grapple out of lubricator, Boss Hog setting sleeve comes through bottom of lubricator. The 4-1/2" Boss Hog plug was not recovered, all WL tools where recovered except the plug, calipered the OD of the CCL, 2.748' at top, 2.756" middle, 2.7565" bottom, tools showed light to heavy washover indications during burn shoe run, distance matched with 15.7' swallowed by washpipe, BD and recover Keane WL tools as follows Tool OD (") L (') Cable Head 1.435".61' CCL 2.756" 1.5' BART 2.735" 2.44' Quick change 1.65" 44' Quick change 2.75".67' Top sub 2.75".17' Plug shoot adapter 2.75".58' #10 firing head 2.75" 1.5' Baker #10 set tool 2.75" 3.79' Setting sleeve 3.63" 1.67' TOTAL LENGTH 21.37' 03:45 Lift lube to well and 6 bolt and torque, close #1 (Quad blinds) and #5 (combo blind / shears) and confirm visually, assemble valve team and walk lines, line up to establish injection rate down 2" kill side and isolate 3" side. set kicks at 7,000 psi 04:30 Roll pump on at 1.25 bpm / 4,000 psi and confirm injection, bring rate to 2.75 bpm / 4,690 psi to 5,300 psi and pump lateral volume of 130 bbls, set kicks at 7,500 psi, increase rate to 6.0 bbls/min / 5,800 psi to 6,200 psi, increase rate to 8.0 bpm / 6,600 psi, pump total volume of 600 bbls, SD, ISIP from pump gauge 5,700 psi. 07:00 Injection confirmed at max rate 8.0 bpm / 6,600 psi / 600 bbls total pumped, prep to MU tools, RIH with cleanout run. Perform BOP drill with day crew. Muster time 107 s, roll call time 135 s. Discuss roles and responsibilities in multiple different scenarios. Discuss other drills including H2S and leaking dual

4 bore flapper check valves in string. Discuss expectations moving forward. 7:30 1.28 MU BHA #7 for cleanout to last known plug set depth as follows: Tool OD (") L (') ID (") Slip type connector 3.125.96 1-3/8 Dual BPV sub 2.875 1.42 N/A Accelerator 2.89 5.89 15/16 Bidirectional jars 2.89 5.61 15/16 Hydraulic disconnect 2.88 2.13 11/16 Circulating sub 2.874 1.33.6 Agitator 2.876 4.31 N/A Motor 2.875 13.59 N/A Crossover 3.15.99 1.36 Roller cone bit 3.75.45 N/A TOTAL LENGTH 36.68 FT. 8:47 9:29 10:08 13:09 14:44 14:52 0.70 0.65 3.02 1.58 0.13 0.15 Function test motor at 1.5 bbl/min x 1250 psi, 2.5 bbl/min x 2400 psi. Swing over lubricator and tools, stab on quad BOPs. NU. Discuss 9QFSPT, walk the line, break circulation to OTT. Test stack and return line to 500 psi low 5 min, 8200 psi high 10 min. Test trips. All good tests, equalize to well, open up and RIH. Opening WHP 4000 psi. RIH with Circ P 4100 psi, WHP 4000, 95 ft/min in vertical, wt check 7000 ft CTM 18k lbf. Bring pump on minimum rate.75 bbl/min at 8000 ft CTM, Circ P 4300 psi, WHP 4000 psi,.2 gal/10 bbl PoP,.08 gal/10 Wt check 10800 ft CTM 34k lbf. Enter curve at 35 ft/min. Continue to pump minimum rate.75 bbl/min, Circ P 4300 psi, WHP 4000 psi,.2 gal/10 bbl PoP,.08 gal/10 At 11500 ft CTM, bring pump rate to 2.5 bbl/min, Circ P 5900 psi WHP 4000 psi,.2 gal/10 bbl PoP,.08 gal/10 RIH through curve at 35 ft/min Continue in lateral with following parameters: - 13000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5600 psi WHP 4000 psi, 80 ft/min, 18k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-14000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5600 psi WHP 4000 psi, 80 ft/min, 17k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-15000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4100 psi, 80 ft/min, 16k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-16000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4000 psi, 80 ft/min, 17k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-17000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4000 psi, 80 ft/min, 16k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-18000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4000 psi, 80 ft/min, 14k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10 Continue RIH at 18688 ft CTM, observe wt fluctuations appear to be pushing debris/plug parts. Minimal torque/pressure signature. Continue RIH to expected plug depth. Send 10 bbl, 80 visc sweep timed to reach end of coil when tagging target depth 19610 ft CTM. Continue RIH with following parameters: - 19000 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP

5 bore 4000 psi, 65 ft/min, 13.5k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-19300 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4000 psi, 65 ft/min, 13k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10-19500 ft CTM, 2.5 bbl/min bbl in - bbl out, Circ P 5700 psi WHP 4000 psi, 65 ft/min, 10k lbf running wt,.2 gal/10 bbl PoP,.08 gal/10 15:01 0.38 Tag plug RIH at 19553 ft CTM indicated by 700 psi differential. Drop rate to 1 bbl/min, come off plug with 47k lbf pickup 10 ft, bring rate back to 2.5 bbl/min. Creep 15 ft/min burning through plug to 19581 ft CTM, pumping 2.75 bbl/min and setting minimal wt down allowing agitator to give back pipe wt. 15:24 15:37 17:34 18:11 19:00 22:15 0.22 1.95 0.62 0.82 3.25 1.75 Pick up to 19590 ft CTM and repeat, see multiple pressure increases on way, maintaining positive wt. At 19590 ft CTM, through plug and perfs, gel sweep at bit. Continue RIH, 5-10 ft/min maintaining positive wt. Tag plug at 19606 ft CTM, drop rate and PU 10' off plug. Begin POOH at 50 ft/min, PU 48k lbf, pumping 2.75 bbl/min, bbl in - bbl out accounting for pipe displacement, Circ P 5900 psi WHP 4000 psi. POOH to allow sweep to stay well ahead of bit. POOH at 35 ft/min in curve between 11850 ft CTM and 10850 ft CTM. POOH at 80 ft/min in vertical. Increase speed, reduce rate to 2.5 bbl/min, bbl in - bbl out, Circ P 5500 psi WHP 3800 psi. 6070' current depth, POOH at 80 ft/min / 2.5 bpm / 5,500 psi / 3,850 psi 20:29 Bump up, close LFV 31 turns and confirm, bleed off to gas buster, close in UFV 31 truns and confirm, final well pressure 3,900 psi. 20:40 12 questions for safe lift, discuss BD tools and (7) 10' 15K lubricator sticks, Pro torque BD bolts on 5-1/8" 15K lube on top of Quad BOP's, swing to side, lower tools and BD BHA #6 - cleanout run as follows BREAK DOWN/LOAD OUT OD (") L (') ID (") Slip type connector 3.125.96 1-3/8 Dual BPV sub 2.875 1.42 N/A Accelerator 2.89 5.89 15/16 Bidirectional jars 2.89 5.61 15/16 Hydraulic disconnect 2.88 2.13 11/16 Circulating sub 2.874 1.33.6 Agitator 2.876 4.31 N/A Motor 2.875 13.59 N/A Crossover 3.15.99 1.36 Roller cone bit 3.75.45 N/A All tools in good shape, no visble marks on 3.75" tri cone bit, load out tools 21:15 Vac out Emerald Surf lines, RD Emerald Surf BD 70' of 5-1/8" 15K lubricator, rack 40' of lube in STEP rack, release 30' of rental and load out same 22:30 Vac out 2" temp pipe, BD and rack, continue RD pump truck 23:55 30' of 5-1/8" 15K lube BD and moved to side of location, continue RD STEP 5-1/8" lube at report time Total 24.00