41st Avenue B-Line Kerrisdale Village Street Improvements

Similar documents
North Vancouver Community Associations Network. November 15, pm to 9 pm

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

City of White Rock. Strategic Transportation Plan. May 16, 2005

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

- 1 - TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION - VANCOUVER TRANSPORTATION PLAN PROGRESS REPORT (MAY 2006) SUMMARY

STONY PLAIN ROAD STREETSCAPE

Standing Committee on Policy and Strategic Priorities

Welcome! Public Open House on UBC s Transportation Plan

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

OAKRIDGE + AMENITIES OAKRIDGE CENTRE - ISSUES AND DIRECTIONS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Tonight is for you. Learn everything you can. Share all your ideas.

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Pocatello Regional Transit Master Transit Plan Draft Recommendations

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

Eliminate on-street parking where it will allow for a dedicated bus only lane %

UBC Vancouver Transportation Status Report Fall 2014

We want to hear from you!

U NIVERSITY OF B RITISH C OLUMBIA. Fall 2010 Transportation Status Report

Arterial Transitway Corridors Study. Ave

PEDESTRIAN ACTION PLAN

Community Task Force July 25, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Public Event 1 Community Workshops

Welcome. Welcome to the second open house on the Downtown Transportation Study.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Exceeding expectations: The growth of walking in Vancouver and creating a more walkable city in the future through EcoDensity

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

Why invest in the 1 Street S.W. Corridor?

ECONOMY PEOPLE ENVIRONMENT

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

1 ALEXANDER STREET BIKEWAY

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

RICHARDS STREET BIKE LANE

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

Satisfaction with Canada Line and Connecting Buses. Wave 2

CITY OF VANCOUVER ADMINISTRATIVE REPORT

122 Avenue: 107 Street to Fort Road

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM

Moving Forward with Winnipeg's Downtown Protected Cycling Network

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary

Transportation & Land Use. Workshop: March 6, 2013

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Welcome. If you have any questions or comments on the project, please contact:

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

The Broadway SkyTrain Extension

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Technical Working Group November 15, 2017

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Welcome to the McKenzie Interchange Project Open House!

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Montford Drive Parking & Circulation Study

Tunnel Reconstruction South 5 th Street Association October 16, 2018

5 Transit & Traffic. Overview

Bus Rapid Transit Plans

North Shore Transportation Improvement Strategy

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

UBC Vancouver Transportation Status Report Fall 2017

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Appendix A-K Public Information Centre 2 Materials

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Community Task Force November 15, 2017

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Better Market Street Project. Project Update January 15, 2015

Metropolitan Council Transportation Committee

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Rethinking Transportation

May 5, 2009 File:

North Coast Corridor:

CONNECTING PEOPLE TO PLACES

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

to the Public Information Centre for the Downtown Traffic Study

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

NEWMARKET CENTRE Mobility Hub Profile

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

TRANSPORT CHICAGO: STRATEGIC PUBLIC TRANSIT BUS RELIABILITY IMPROVEMENTS

Chapter 5 Future Transportation

Southside Pilot Proposal

Bicycle Friendly Niagara Falls

Peterborough Council on Aging

Bus Timetable. VanBook2 1-A VanBook2 1-B. Vancouver Book 2: Vancouver, UBC, SeaBus. Compass is your Key. Load. Tap. Ride.

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Frequently Asked Questions (FAQ)

Welcome. Background. Goals. Vision

Transcription:

1. WELCOME! 41st Avenue B-Line Kerrisdale Village Improvements Public Open House Please sign in so we can provide updates and information on construction The City of Vancouver is working with TransLink to introduce a new B-Line bus service along the 41st Avenue corridor as part of the Mayors 10-Year Vision. The proposed service changes include replacing Bus Route 43 with the new B-Line bus service and modifying the existing Bus Routes 41 and 49 as a result of the introduction of the new B-Line. THE NEW B-LINE WILL FEATURE THE FOLLOWING ELEMENTS: Improved travel time and reliability stops spaced approximately 1 km apart, new articulated buses, all-door boarding. Frequent service bus service would be every 3-6 minutes in peak times and every 8-10 minutes during non-peak. Available all day service hours would be between 6am - 1am. Bus stop amenities stops will have digital signage showing arrival times, and route information inside buses. 1. Talk to City and TransLink staff HOW CAN YOU PROVIDE INPUT? or the project team. 2. Fill out a comment sheet here, or later, online at: vancouver.ca/41stbline 3. Write us at: 41st-bline@vancouver.ca 4. Call us at 3-1-1

2. 41ST AVENUE UPGRADES Introduction WHY ARE TRANSLINK AND THE CITY OF VANCOUVER IMPROVING TRANSIT SERVICE ALONG 41ST AVENUE? Both the Metro Vancouver Region and the City are growing. Over the next 30 years, we re expecting about 130,000 new residents and close to 9,000 new jobs within the City, bringing more trips and more life to Vancouver. The street network is largely built out, leaving few opportunities for building new roads, but by using our existing streets more efficiently we can move more people in the limited space we have. As part of the Mayors 10-Year Investment Plan, TransLink is working with the City of Vancouver and other municipalities to introduce three new B-Line or better services within the region to do just that. over the next 30 years, we re expecting about 130,000 NEW RESIDENTS and close to 9,000 NEW JOBS One of these new B-Lines will operate along the 41st Avenue corridor, which was first identified for improved service in 1997 and acknowledged as a priority in the City s Transportation 2040 Plan. It will operate between the University of British Columbia (UBC) and Joyce-Collingwood Station and is scheduled to open in Fall 2019. The 41st Avenue corridor is a key east-west route for general vehicles, transit, and trucks. It is part of the Major Road Network, Frequent Transit Network, and is a truck route. The corridor connects major destinations across Vancouver, including: The Expo and Canada Lines Oakridge Municipal Town Centre UBC Walkable neighbourhood retail areas around Dunbar, Kerrisdale along 41st Avenue, Fraser, Victoria Drive, and Kingsway. There are two main bus routes that run the length of this corridor, from UBC to Joyce-Collingwood Station. Combined, these two bus routes carry over 10 million riders per year: Bus Route 41, which provides local-stopping service with high frequency (up to every 5 minutes) seven days a week, and has the second highest bus ridership in the region (with over 26,500 daily passenger boardings), after the 99 B-Line. Bus Route 43, which provides limited-stop service during weekdays only, with service ending after approximately 8pm (carrying 6,400 passengers daily). In addition to these two routes, bus routes 2, 26, 49 and the 480 partially run along the corridor.

3. 41ST AVENUE UPGRADES Introduction continued Being a busy vehicle and transit corridor, Bus Routes 41 and 43 have the following characteristics when averaged over the year. During peak times, the conditions are likely worse. Bus Speed Overcrowding Bunching Bus 41 21km/h 17% 8% Bus 43 24km/h 11% 3% Did you know? During peak times, transit carries 40-60% of people travelling on 41st Avenue between Dunbar and Granville Transit Ridership within the City and Region Transit ridership continues to increase within Metro Vancouver and the City. Vancouver has one of the busiest transit systems in North America and transit is often at capacity. To the right is an image of historic ridership trends in the region. WHAT CONSULTATION HAS BEEN DONE TO DATE? In Spring 2018, TransLink consulted transit passengers and neighborhoods along the proposed new B-Line corridors to solicit feedback on proposed bus stops, local service changes and speed/reliability measures. A total of 2,368 completed survey responses on the 41st Avenue B-Line were received. The level of public support for all aspects of the B-Line proposal was highly positive: The majority of respondents supported the proposed 41st Avenue B-Line stop locations, changes to local routes and transit priority measures. A large majority of transit users supported changes to streets and intersections to support speed and reliability of the new 41st Avenue B-Line. Support was strong across all proposed transit priority measures. Since Fall 2018, the City has also been consulting with key stakeholders including business improvement associations, schools, and community centres to gather feedback and to develop a better understanding of the local issues that might influence the project.

4. 41ST AVENUE UPGRADES Policy Background TRANSPORTATION 2040 Transportation 2040 is a long-term strategic vision for the City that helps guide transportation and land use decisions and public investments. TARGET: Make two-thirds of trips on foot, bike or transit by 2040 Reduce the average distance driven per resident by 20% (from 2007 levels). TRANSIT VISION: Support transit improvements to increase capacity and ensure service that is fast, frequent, reliable, fully accessible, and comfortable. POLICIES: Collaborate with TransLink to provide fast, frequent, high-capacity, and fully accessible transit service on high-demand corridors including Broadway, Hastings, 41st/49th Avenue, Commercial/Victoria, and Main/Fraser. Work with TransLink and the Province to improve the frequency, capacity, reliability, and service span of local transit, prioritizing high-demand corridors. OTHER RELATED POLICIES Arbutus Greenway Design Vision and Implementation Strategy (2018): Identified and proposed a broad range of public realm and active transportation improvements along the Arbutus corridor, including fully segregated walking and cycling pathways, public gathering areas, site furniture and other public amenities. Congestion Management Strategy (2017): Provides direction on identifying and monitoring impacts to traffic flow on the street network, developing strategies to address impacted areas of congestion, and tracking progress and results. It also builds on T2040 policies and emerging directions in the TransLink 10-Year Investment Plan. WHERE ARE WE IN THE PROCESS? 2014 Mayor s Council developed the 10-Year Vision 2017-2018 TransLink consulted with the public on the new B-Line corridors 2018 Early 2019 WE ARE HERE Spring 2019 Summer / Fall 2019 City continued consultation on street improvements with stakeholders and general public Public Open House Kerrisdale District Refining and reporting out on design changes Anticipated implementation of most measures along the corridor and launch of B-Line 2020 Implementation of additional measures

New B-Lines in 2019 west vancouver Marine Main north vancouver belcarra anmore downtown port moody vancouver burnaby coquitlam 41st Avenue new westminster richmond surrey Legend delta New B-Lines in 2019 Existing 95, 96, 99 B-Lines Canada Line Expo Line Millennium Line SeaBus West Coast Express white rock port coquitlam Lougheed Hwy pitt meadows maple ridge langley

Joyce St Kingsway Patterson Ave Boundary Rd Tyne St upert R t S Clarendon St Joyce Collingwood Millennium Line Expo Line Victoria Dr Kerr St Knight St Metrotown UBC Exchange Central Park Future 41st Avenue B-Line and Changes to Local Routes Planned network Wesbrook Mall East Mall Agronomy Rd Canada Line Cambie St W 16th Ave Oakridge Park Fraser St Main St Oak St Granville St W 33rd Ave E 33rd Ave Queen Elizabeth Park West Blvd Mackenzie St Carnarvon St Blenheim St Dunbar St Crown St SW Marine Dr E 41st Ave W 41st Ave B-Line E 49th Ave W 49th Ave Legend Dunbar Loop Langara Cambie St Planned B-Line route B-Line SW Marine Dr Fraser River Park Planned B-Line stop Planned stops Main Oak West Boulevard Route 43 replaced with new B-Line Dunbar Loop Agronomy Road Oakridge Granville Carnarvon Avenue UBC Exchange Bus SkyTrain exchange station B-Line Fraser Knight Victoria Drive Clarendon Rupert Kingsway Joyce Collingwood Bus exchange Route 41 changed to run between Crown and Joyce Station

Legend 0-10 km/h 10-20 km/h 20-30 km/h 30-40 km/h 40-50 km/h 50+ km/h

8. 41ST AVENUE UPGRADES Transportation Improvements and Evaluation WHAT DECISION MAKING GOES INTO TRANSPORTATION IMPROVEMENTS AND AMENITIES? HOW DO CITIES DECIDE WHAT CHANGES TO MAKE? Enhancements to a B-Line service, or any transit services, are dependent on municipal collaboration with TransLink. These decisions are made through rigorous analysis, traffic studies and modeling of the street network to ensure overall traffic performance is improved and bus travel times are reduced. To evaluate the effectiveness of potential transportation improvements and amenities, City staff undertake a monitoring and evaluation framework that includes but is not limited to the following: Safety Parking Needs Accessibility Loading Needs Connectivity to Key destinations Volumes and Delay for All Modes BUS STOP AMENITIES When funding is available, the addition of bus stops with amenities such as shelters, benches and real-time displays improves the waiting environment at bus stops. Adding amenities also results in greater rider satisfaction, and higher ridership.

9. 41ST AVENUE UPGRADES Transit Benefits Improved People Moving Capacity HOW WILL YOU BENEFIT FROM IMPROVED SERVICE ALONG 41ST AVENUE? People using transit can: Save time through faster, more frequent and more reliable service Have improved access to employment opportunities, educational and health institutions, community centres and libraries. Have higher levels of productivity by using time spent on public transit to carry out other tasks. Save money - compared to driving, traveling by transit is much more affordable. Experience less stress by avoiding having to drive in highly congested areas and find parking. Have greater mobility, especially for those who don t or can t drive, which facilitates greater access to employment, social services and social interaction with friends and family. Residents, businesses, and communities: By carrying more passengers by bus, which takes up less road space than individual cars, it keeps traffic moving and reduces air pollution from idling vehicles. More frequent and reliable transit services will bring more people to retail areas and make communities more vibrant and lively. Money spent on public transportation has a high economic return in comparison to private automobile and housing prices. HOW DO WE DETERMINE THESE BENEFITS? On an annual basis, TransLink measures the performance of all transit services, including the number of boardings, transit vehicle speeds, on-time performance of buses, etc. They also conduct customer service performance surveys every 3 months. Together, these reports will provide TransLink and the City with an understanding of how well the B-Line service is performing and meeting the needs of transit users. The environmental, community, and economic impacts of the new B-Line will be more difficult to determine, as there are many other factors at play. The City will continue to monitor the new B-Line service after it launches and identify if additional changes are required to further improve the corridor s people-moving capacity and/or to better capture the community benefits of the service.

10. 41ST AVENUE UPGRADES Transportation Design Process What We Heard The City heard historically and through the Arbutus Greenway consultation and discussions with businesses in the area that crossing at the West and East Boulevard intersections could be made easier for people on foot or bike. As a result, westbound vehicles often block the greenway crossing, making it challenging for people walking and riding bicycles to cross north-south. This is particularly challenging for people using mobility aids like wheelchairs, and for those with visual impairments. Currently many of the vehicle movements are hard to make and vehicles, including buses, are often trapped in the small queue space between the two boulevards. What We re Proposing The City worked with TransLink to investigate improvements to make the area safer for people walking, cycling and rolling and to improve the flow and reliability of buses and PLAN VIEWS Character Zone 5 general purpose vehicles along 41st Avenue. B-Line Project Bike Path The changes shown in board #11 are being proposed as part of the B-Line project. Arbutus Greenway Public Plaza Architectural Structures supporting Lighting, and Opportunities for Future Public Art Green Infrastructure/ Raingarden Accessible Public Washroom Coffee Kiosk Additional Potential Future Changes Pedestrian Path East Boulevard West Boulevard Narrowing East Boulevard north of 41st Avenue means that the space gained can be reserved to be a future programmable public space, as identified during the Arbutus Greenway design process. At the moment, Kerrisdale Village does not have a public space that can be used for programmed events and activities like many other BIA areas across the city. Shade Trees With Movable Chairs There is the potential in the future to add a new vehicular crossing at 39th Avenue and at 42nd Avenue along West Boulevard to improve local circulation. Arbutus Greenway Design Vision 41ST AVENUE PRE-STREETCAR PLAN VIEW ARBUTUS GREENWAY DESIGN VISION 23 EAST BOULEVARD W 41st Ave WEST BOULEVARD 39TH AVENUE 42ND AVENUE We are also interested in hearing your thoughts about this idea.

To reduce tripping hazards for pedestrians, particularly those with mobility devices and strollers. To make the crossing of the greenway safer for people walking and cycling by reducing the north-south pedestrian crossing distance at East Boulevard and reducing the chances of conflict at the crosswalks with vehicles turning left. However, pedestrians walking to/from the major origins/destinations east of East Boulevard will need to walk further to cross 41st Avenue. To help prevent through-moving vehicles from getting stuck behind right-turning vehicles which improves traffic flow. The transit lane helps buses travel through the area more reliably. To help prevent through-moving vehicles from getting stuck behind left- or right-turning vehicles which improves traffic flow. Explore opportunities to fix and repair crosswalks Remove the traffic signal and crosswalk at East Boulevard and provide a centralized greenway crossing Reassign the eastbound curb lane to a right turn lane and a transit lane (from West Boulevard to the eastbound bus stop) Reassign the westbound curb lane to a right-turn lane and lengthen the existing westbound left-turn bay B C F E D A To make space for a new eastbound left-turn lane on 41st Avenue. More short-term parking can be provided in the nearby EasyPark lot on East Boulevard if necessary. J Remove 1-3 parking stalls and relocate loading zone G I J To improve traffic flow and reduce short-cutting through nearby local streets. It should also reduce chances for conflicts with pedestrians. E 41ST AVENUE I Introduce an eastbound left-turn bay C D F H LANEWAY Why? PROPOSED CHANGES C ARBUTUS GREENWAY What is Different? A B WEST BOULEVARD C EAST BOULEVARD Recommended Transportation Design K J I H G Why? To simplify the intersection and lead to fewer vehicle movements. This change also prevents westbound left-turning vehicles who are turning onto East Boulevard from blocking westbound left-turning vehicles who are turning onto West Boulevard. To simplify the intersection and lead to fewer vehicle movements, some of which are difficult in the existing condition. These changes will also prevent southbound vehicles on East Boulevard, north of 41st Avenue, from conflicting with westbound vehicles on 41st Avenue. A future programmable public space also becomes available. Avoids the buses getting stuck behind right-turning vehicles and vice versa. Also, provides more street space for waiting transit passengers, and pedestrians walking by. To make space for the new bus stops. More short-term parking can be provided in the nearby EasyPark lot on East Boulevard if necessary. Upgrading to a fully signalized intersection will improve vehicle access to businesses south of 41st Avenue and to the lane north of 41st Avenue. Restrict vehicle movement to right-in/right-out Restrict vehicle movement to right-in only from 41st Avenue and convert East Boulevard to one-way northbound from 41st Avenue to the lane north of 41st Avenue Relocate eastbound bus stop to far side of East Boulevard and westbound bus stop to near side of East Boulevard Remove 7-8 parking stalls from the north side of 41st Avenue and 8-9 parking stalls from the south side of 41st Avenue Turn Maple into a fully signalized intersection K N What is Different? 11. 41ST AVENUE UPGRADES MAPLE STREET

12. NEXT STEPS Talk to City and TransLink staff or the project team. Fill out a comment sheet here, or later, online at: vancouver.ca/41st-bline. The consultation period for this segment of the route will close on March 1, 2019. Staff will work with TransLink to refine the East 41st Boulevard changes based on feedback from local businesses, residents and other stakeholders. Some improvements will be made for Fall 2019 and others will be delivered in 2020.