PHNOM PENH CAPITAL CITY (PPUTMP) OUTLINE OF THE PPCC RAIL TRANSIT SYSTEM

Similar documents
Arterial Transitway Corridors Study. Ave

Cambodia Road Traffic Accident and Victim Information System

Wellington Public Transport Spine Study

The way forward. Colombo Metropolitan Transport Master Plan and Areas for International Cooperation

Gerald Ollivier Lead Transport Specialist World Bank, New Delhi. Transforming Cities through Integrated Planning Corridor Scale

Presentation to the City of Ottawa Transit Commission. February 20, 2013

Highway Transitway Corridor Study

I-66 Corridor Improvements Route 15 to I-495. November 2014

Transportation, Parking & Roads

PESHAWAR Bus Rapid TRANSIT. By Engr. Haroon Rashid Ph. D Scholar, MS in Transportation Planning and B.Sc Civil Engineering

Hurontario-Main Light Rail Transit (LRT) Project

EXISTING CONDITIONS OF AND SOLUTIONS FOR THE DEVELOPMENT OF SUSTAINABLE URBAN TRANSPORT IN SOME MAJOR CITIES OF

Joseph Iacobucci. James Czarnecky, AICP

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

101 Corridor Managed Lanes

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

INTEGRATED MULTI-MODAL TRANSPORTATION IN INDIA

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Experience from India Future Perspectives

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Cotton Belt Corridor Regional Rail Project

Service Business Plan

Urban Transportation Issues. BRT Developments in China PURPOSE

Addressing Traffic Congestion in Jakarta: what went wrong and the road ahead

Appendix 1 Transit Network Analysis

STATION #3 INITIAL ALTERNATIVES

AGENDA. Stakeholder Workshop

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

TRANSBAY JOINT POWERS AUTHORITY

Public Bicycle Sharing Scheme

Regional Bus Priority

Road Safety in Asia and the Pacific and The Updated Regional Road Safety Goals and Targets for Asia and the Pacific

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Previous Transit Studies MTTF MEETING #

Wilshire Boulevard Bus Rapid Transit Project

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

CPC Parking Lot Riverside Drive. Transportation Rationale

VIII. Project Prioritization & Implementation

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Community Engagement Process

Durham Region Long Term Transit Strategy

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Casablanca Boulevard & GO Station Access

Policy and Strategy for Sustainable Urban Transport in Vietnam

Copenhagen Cycling Map. Red Lines Cycling facilities

Final Study Recommendations AMES TRANSIT FEASIBILITY STUDY. For Public Review and Comment. October Ames Transit Feasibility Study

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Proposed Project I 35 from Denton to Cooke County Line

I-35W Solutions Alliance Project Update July 13, 2017

2015 Data review. Capturing Ready Lane NEXUS vehicles

Arterial Transitway Corridors Study

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Mr. Joseph J. Lhota Chairman Metropolitan Transportation Authority 2 Broadway New York, NY Re: Train On-Time Performance Report 2017-F-8

Going Green: How California is Reviving Passenger Rail. APTA/ AASHTO AASHTO 2008 State Public Transit Partnerships. August 7, 2008

South King County High-Capacity Transit Corridor Study

Transportation Planning Division

Diamond Springs Parkway Project

Multi-Modal Facility Feasibility Study (WFC006)

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

Access BART: TOD and Improved Connections. October 29, 2008

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018

Bus Rapid Transit Symposium. THOMAS CENTER SPANISH COURT October 14, 2008

JICA Preparatory Survey On Greater Cairo Metro Line No.4 In the Arab Republic of Egypt FINAL REPORT. Volume 4 DRAWINGS JUNE 2010

Shifting Gears for a Healthier City.

Creating the Future Bruce B Downs Blvd

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Can PRT overcome the conflicts between public transport and cycling?

Transit Operations in the I-95 Express Lanes

SUMP in Emilia Romagna Region and the national level»

MARTA Expansion Update

Implementation Options

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Decongestion Strategies for Delhi Roads

SOCIALLY AND ENVIRONMENTALLY SUSTAINABLE URBAN TRANSPORT

Metropolitan Council Transportation Committee

TR A N S P O R TAT I O N READY TO GO

Urban Traffic Analysis Using HSL (Helsinki Bus) Dataset Kai Zhao University of Helsinki

OVERVIEW OF CIRCULATION

Clackamas County Comprehensive Plan

ENGAGING ENTREPRENEURS TO PROVIDE INTEGRATED MOBILITY SOLUTION AMIT BHATT, DIRECTOR- INTEGRATED TRANSPORT, WRI INDIA

Chapter 2 Current and Future Conditions

IRIS 2 MOBILITY PLAN Brussels-Capital Region

Setting Regional and National Road Safety Targets

North Hollywood to Pasadena BRT Corridor Technical Study. Eco-Rapid Transit/Orange Line Development Authority March 8, 2017

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Integrated Pedestrian Simulation in VISSIM

Transcription:

PHNOM PENH CAPITAL HALL MINISTRY OF PUBLIC WORKS AND TRANSPORT THE KINGDOM OF CAMBODIA (MPWT) PROJECT FOR COMPREHENSIVE URBAN TRANSPORT PLAN IN PHNOM PENH CAPITAL CITY (PPUTMP) JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) OUTLINE OF THE PPCC RAIL TRANSIT SYSTEM 06 August 2015 SAM PISETH DIRECTOR OF PUBLIC WORKS AND TRANSPORT PHNOM PENH CAPITAL CITY 1

1. TARGET PUBLIC TRANSPORT CORRIDORS & CORRIDOR ANALYSIS East west and Southwest transport corridors were selected as the target Public Transport corridor of the pre F/S based on the public transport development scenario and the following corridor analysis result: A relatively high passenger demand of around 72,500 to 81,600 trips/day in 2035. The route connects between urban center and rapid urbanized western fringe area. The route connects with several intense traffic generation nodes, i.e. Phnom Penh airport, train depot and bus terminal facilities. A large scale private development plan for the central district is underway. Various land use patterns are seen along the corridor. It is possible to serve future transport demand by bus feeder network from south and north. 2

2. Route Alternatives for East West and Southwest Transport Corridors

3. Evaluation of Rout Alternative Length of elevated and underground section (km) Cost (Million USD) Accessibility to the airport Alternative 1 Alternative 2 Alternative 3 1 Alternative 3 2 Russia Blvd. route Monivong Blvd. MRD (Russia, underground) MRD Depot (Russia, elevated) Railway Russia route Central Station Depot (Railway line and Russian Blvd. Elevated) Olympic Studiam Monireth (CDG and Monireth, Elevated) Monireth Airport (Monireth, Veng Sreng and Russia, Elevated) Central Market Depot (CDG, Monireth, Veng Sreng and Russia, Elevated) Elevated Section 11.8 14.2 12.0 16.3 Underground Section 2.2 0.9 0.9 0.9 Total 14.0 15.1 12.9 17.2 759 645 586 733 2 4 6 2 Future development along the route Future Extension Items 2035 Passenger Demand (Passengers/Day) Land use along the route Urban environment (urban scenery) CDG Monireth Veng Sreng Blvd. route 81,600 72,500 75,000 79,000 3 1 1 2 3 1 3 3 3 3 1 1 3 1 3 3 3 1 3 1 3 3 2 1 The optimum route for the preliminary F/S is selected from the four alternatives through the evaluation on the eight viewpoints. Each evaluation item is given points: 3 for good, 2 for fair and 1 for worse. However, since cost is the most important items for the route evaluation, its point is multiplied by 2. Alternative 3 1 received the highest point as shown in the Table. Issue to the VIP Traffic 1 3 3 3 Overall Evaluation 21 17 22 16 4

4. Route Characteristics of Alternative 3 Demand 5

5. Selection of Rail Transit System 6

5. Selection of Rail Transit System Cont d Image of Automated Guideway Transit (AGT) Singapore Sengkang/Punggol Line 7

5. Selection of Rail Transit System Range of Application 8

5. Selection of Rail Transit System Exceptional Route Flexibility 9

6. Schedule Based on the public transport development scenario, it is recommended that the first stage of the rail transit be implemented after the medium term (2020). Then, considering the construction period, it is necessary to proceed to the next step (Feasibility Study) as soon as possible. 1. Preliminary F/S Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Quarter 1 2 1 2 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 2. Finalization & Government Process 3. F/S & Basic Design Detail Design, Tendering 2018 Apr. 2019 Dec. Construction Period 2020 Jan. 2023 Mar. 3 years + 3 months Operation 2023 Apr. 4. Cambodia G. Approval 5. ODA Process 6. Selection of Consultant 7. Detailed Design 8. Tender Document/Tendering 9. Construction Supervision 10. Civil Construction 11. Station and Depot Building Construction 12. E&M System incl. Trains 13. O&M Tender/Contract/Works 14. Open of Commercial Operation 10 Note: Next Most Important Steps Necessary Working Period Formalization & Documentary Works

7. Current Conditions along Alt.3 Route Olympic Stadium Monireth Blvd. North Stung Minh Chey Flyover Monireth Blvd. South

7. Current Conditions along Alt.3 Route cont d Veng Sreng Blvd. Veng Sreng Blvd. Near Cham Chau Roundabout Cham Chau Bus Terminal Russian Blvd. Near Airport