U.S. Department of Homeland Security. Acquisition Planning Forecast System

Similar documents
Grays Harbor O&M and Deepening Dredging

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Grays Harbor Federal Project

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association,

Rural Energy Conference Planning the Construction of Lake Dorothy Hydro By Tim McLeod President Alaska Electric Light and Power

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Housing Recycle. APRIL 2017 Recycle Monthly Average Pounds Per Home 89 Tons collected UNCLASSIFIED 1. Goal is 36 Pounds per Household

Demand for Harbors, Dockage, and Other Navigational Needs for Small Boats and Commercial Fishing Vessels in Alaska

INNCOM SYSTEM MONITORING MARRIOT HOTEL DOWNTOWN PHILADELPHIA, PA. Report 9. July 2, CH2M HILL Project No

CONFINED SPACE ENTRY WRITTEN PLAN

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Testing Procedures of Watertight Compartments

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

F All types of inert gas systems are to comply with the following:

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Water Management Plan For The Blue Ocean Golf Club

City of Palmer Action Memorandum No

Olmsted Locks & Dam. Inland Waterways Users Board. MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016

2014 Annual Community Report

Campbell Union High School District Revised 4/11/18. Master Plan Construction Schedule Summary Measure AA, QZAB, and Capital Facilities TODAY

Orion In Situ Oil Sands 2014 Progress Update. Presented May 21, 2015

MR. DAVID DALE, SES, PE, PMP DIRECTOR, US

HOUSE ROOFS. #101/103 Bldg (1/2) $11, $575 $4,025. #102 Bldg (1/2) $11, $575 $5,750

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

References: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8

DEPARTMENT OF FISH AND GAME

2018 HR & PAYROLL Deadlines

Confined Space Entry Written Program

Emergency Situation Assessment

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

2017 CRAPPIE TOURNAMENT SUMMARY

(12) United States Patent

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Information. And. Procedure. Manual

Job Hazard Analysis. University of Washington Seattle Campus Facilities Services Campus Engineering & Operations Seattle, WA 98195

Kodiak, Alaska Site 1 Wind Resource Report

UNIVERSITY OF FLORIDA Academic Calendar Guidelines

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

Juneau Douglas Harbor

CLEVELAND UTILITIES WATER DIVISION WATER & WASTEWATER RATES Effective July 1, 2018 (Minimum bills will apply based on meter size.)

Special projects are mainly capital equipment purchases and improvements to the inlet. Most improvements are cost shared with FDEP and FIND.

Kentucky Lock Project Update Inland Waterways Users Board

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

September 2018 FY Key Performance Report

{ } Jack Holland Page 1 of DOC

Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN

Shafter Avenue Repaving

Charles Barrett. Support Educational Program. Charles Barrett Total. Support Educational Program

UK Energy Futures. Richard Smith Head of Energy Strategy & Policy

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

ASBESTOS INVENTORY CONTROL

PROJECTS STREETS

Project Update & Local Suppliers

Procedure: Pressure equipment safety

HOW TO MAKE MORE PRODUCTION WITH PLUNGER LIFT

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

January Sun Mon Tue Wed Thu Fri Sat. Notes: Jan 01: New Year s Day (closed) Jan 21: M L King Day (closed) leavenworth.armymwr.

AN OVERVIEW OF THE UPPER KUSKOKWIM CONTROLLED CONTROLLED USE AREA AND THE USE OF MOOSE BY AREA RESIDENTS, Elizabeth Andrews and Jeff Stokes

May 2018 FY Key Performance Report

MONTHLY RIDERSHIP AND PERFORMANCE REPORT. REVISED January 2016 Monthly Performance Report

Manufacturers continue capacity expansion as technology orders grow

Liquefied Natural Gas: Current Trends and Future Directions

Preston s Edmond Market Report

Simons, Siegling & Cappelmann bound volumes, SCHS#

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS

Performance Monitoring Examples Monitor, Analyze, Optimize

MEMORANDUM TABLED DOCUMENT. WACI lb. Tabled at tackvi-oin COMMUNITY AND LEISURE ASSETS GROUP OF ACTIVITIES 2015/16. Feb-16

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

2005 ABC. Chapter 3 Part 2. Navigating with ATON's. Revision to D-13 Local Notes. Instructor Notes for Mike Brough. Mike Brough

Jacksonville District Master ************************************************************************** USACE / CESAJ

REQUEST FOR QUOTATION 3-10-B037 METROPOLITAN WASHINGTON AIRPORT AUTHORITY SPRINKLER SYSTEM TESTING AND INSPECTION. July 22, 2010

January 2019 FY Key Performance Report

Inerted Vessels: Preventing Hazards Caused by Gas Buoyancy

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

POLICY & PROCEDURE #502 EFFECTIVE DATE: 6/5/02 LAST REVISED: 7/12/12 LAST REVIEWED: 7/8/15

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1)Dir,,oht MEMORANDUM. Tabled at rnoilo TABLED DOCUMENT. Mar-16. Current Infrastructure projects/upgrades and other Council activities within the Ward

Albeni Falls Dam Downstream Water Temperature Study Interim Results

INDUSTRY OVERVIEW BOB WELLS SENIOR VICE PRESIDENT, CORPORATE COMMUNICATIONS & PUBLIC AFFAIRS FINANCIAL COMMUNITY PRESENTATION OCTOBER 3, 2017

FREEDOM OF INFORMATION REQUEST

September 2017 MLS Statistical Report. Residential Inventory

SJMGA 2018 Events. January Schedule of Events. February Schedule of Events TIME

December 25 Christmas Day May 21 Victoria Day December 26 Boxing Day July 1 Canada Day (stat: Mon. July 2)

Statistically Speaking

OTUMOETAI COLLEGE NCEA MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018

Monday Tuesday Wednesday Thursday Friday

CHAPTER I SUEZ CANAL NAVIGATION FEATURES SECTION 1 APPROACHES

The Filson Historical Society. Hood, James N., Papers, 1927,

Spokane Sportsplex - Ice Only (DRAFT) (Spokane, WA) Five-Year Operating Pro Forma

APPENDIX D REAL ESTATE PLAN

Capital Projects' Timelines

SEASONAL PRICES for TENNESSEE FEEDER CATTLE and COWS

Analyzing the Energy Economy Michael Plante Senior Research Economist

TUC LIBRARY COLLECTIONS. Records of the London Bookbinders and Paperworkers

2018 CRAPPIE TOURNAMENT SUMMARY

FINANCIAL ANALYSIS. Stoby

Transcription:

U.S. Department of Homeland Security Acquisition Planning Forecast System October 03, 2018 Search Results Based on the following Search: : All s : All es : All s : All s : All s : All s Forecast State: All Forecast States : All s APFS coordinator Office: All APFS Coordinator Offices Contracting Office: /CEU Juneau Requirement Office: All Requirement Offices Point Of Contact: All POCs Requirement : All Requirement s Last Updated By: All Users Approved By: All Users PR Date Start: Oct. 1, 2018 PR Date End: All PR Dates Award Date Start: All Award Dates Award Date End: All Award Dates Last Updated Start: All Dates Last Updated End: All Dates Full Text Search: All Text Public View: No F2017039018 Dec. 11, 2018 904-463-2412 James.C.McFerran@uscg.mil Page 1

9404831 Replace Tower RLPA15, COMDET Kodiak F2018043599 541620 DWAC/OASIS $150,000 to $250,000 None Oct. 1, 2018 Raven Smith 206-220-7402 raven.j.smith@uscg.mil 11559373 Biological Assessment and Five Year Programmatic Consultation F2018043661 Nov. 14, 2018 8927458 Kodiak Major M&R Historic Houses, SOQ D F2018043663 Jan. 23, 2019 9064724 Kodiak Fit-out Heat and Pipe Work Shops Bldg 20. Project will be competed amongst pool of preselected Regional Multiple Award Construction Page 2

F2018043741 Nov. 14, 2018 9077344 Kodiak Repair/replace Firehouse roll up doors. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043742 Dec. 3, 2018 10095815 Kodiak Repair WTP ( wet well, PLCs, meter hut) FY19 (parent). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043744 $5,000,000 to $10,000,000 Dec. 5, 2018 7337347 Kodiak Repair Buskin Water Line - FY17 CPOP. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043746 Page 3

$1,000,000 to $2,000,000 Nov. 14, 2018 7497652 Kodiak Replace Fuel Pipe From Laundry to Bldg N21. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043751 Oct. 15, 2018 9926124 Kodiak API 653 Repairs for Bulk Fuel Tank (N-60) (welding, cleaning, painting). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043753 Oct. 15, 2018 6461930 Replace Generators NDS Naked Island (FY18 CPOP funded). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043762 Oct. 1, 2018 Page 4

11559367 Kodiak AE Design FY19 and FY20 Steam Repairs. F2018043763 Recompetition Incumbent Stantec Contract Number HSCG50-17-D-PSL006 Contract Complete Dec. 2, 2019 Oct. 1, 2018 9741400 Kodiak AE Design for Water Treatment Plant (WTP) project development (FY19). F2018043764 APFS Coordinator: CEU Seattle-(APFS Coordinator) Jan. 23, 2019 6424309 Pave Parking & Side Entrance Road, SFO Valdez (Design/Build). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043765 Feb. 20, 2019 8405333 Repair Electrical Equipment Petroleum Oil and Lubricants (POL) Facility. Project will be competed amongst pool of preselected Regional Multiple Award Construction Page 5

F2018043766 Other Feb. 27, 2019 6461937 Replace Generators NDS Cape Fanshaw (fy19 CPOP funded). F2018043767 Jan. 8, 2019 8270974 Kodiak Repave Anchor Way. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043768 Dec. 4, 2018 8938806 Kodiak DEMO Bldg A512. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043769 Page 6

$1,000,000 to $2,000,000 Oct. 24, 2018 474412 Repair Air Station Kodiak Hanger 3 Fire Protect Systems Stage 1 (Design/Build). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043770 Feb. 6, 2019 8379496 Homer Replace HICKORY Constant Tension Winches. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043771 Other Jan. 23, 2019 8270807 Homer DREDGE: HICKORY Berth (FY19). MIPR with Army Corp of Engineers F2018043772 Aug. 30, 2019 Page 7

10094060 Conduct Short Term Repairs for Sitka Moorings, CGC KUKUI (CPOP APPR). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043775 $1,000,000 to $2,000,000 July 22, 2019 Q4 2019 4956061 Repair/Replace HVAC DDC Controls, Base Ketchikan. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043776 Oct. 29, 2018 11445583 Kod/Ketch A/E Study Kod shore ties, USTs, N27; Ketch Boathouse leaks. Project will be competed amongst pool of preselected Alaska A/E. F2018043777 $2,000,000 to $5,000,000 Oct. 8, 2018 4615583 Reconfigure Tower Field COMDET KODIAK (D-B parent). Page 8

F2018043778 Nov. 5, 2018 8622815 Valdez M&R Housing Boiler Rooms (D-B). Project will be competed amongst pool of preselected Regional Multiple Award Construction Contractors (RMACC). F2018043779 $2,000,000 to $5,000,000 Feb. 11, 2019 10884578 Kodiak Repair Utilities and Paving on STORIS N27 to 518 (CPOP appvd). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043780 $1,000,000 to $2,000,000 Oct. 22, 2018 9363867 Replace Windows, Doors and AC, SFO Valdez. Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043781 Page 9

Oct. 22, 2018 10257391 D17 Repair/Replace ATON Structures (FY19). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043791 Recompetition Incumbent Sev1Tech Contract Number HSCG87-17-F-PJT809 Contract Complete Sept. 18, 2020 Sept. 9, 2019 Q4 2019 8938787 CEU Option Year 2 - OASIS Contract Designers in Juneau FY19. Option Year 2 was established at award in FY17. F2018043793 $1,000,000 to $2,000,000 Oct. 29, 2018 9623880 Kodaik Demolish Abandoned Facilities COMDET Receiving Site (Parent). Project will be competed amongst pool of preselected Regional Multiple Award Construction F2018043794 Oct. 29, 2018 Page 10

10291170 Ketchikan A/E Design for M&R Waterfront. Project will be competed amongst pool of preselected Alaska A/E. F2018044336 Dec. 5, 2018 11550843 Kodiak Architect & Engineering Design Heat / Pipe shop for BOSS Equipment Move in Bldg 20 at USCG Base Kodiak Page 11