EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

Similar documents
EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

Wellwork Chronological Regulatory Report

FORGE Energy UL 21 Pahaska 1H API Number:

Wellwork Chronological Regulatory Report

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

Zarvona DAILY WORKOVER / COMPLETION REPORT

FORGE Energy UL 21 Freedom 1 API Number:

Zarvona Energy LLC DAILY OPERATIONS

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

ENDEAVOR ENERGY RESOURCES

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

Drilling Morning Report

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

PHE KE30-A8 WORKOVER PROGRAM

Live well deployment of long perforating gun system using combined CT technologies

Practice Exam IADC WellSharp Driller and Supervisor

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Colorado Oil and Gas Conservation Commission

DB Bridge Plug. Features. Benefits. Applications

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Subsea Safety Systems

Daily Drilling Report

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Dynamic Underbalance (DUB)

Hydro-Mech Bridge Plug

Casing Design. Casing Design. By Dr. Khaled El-shreef

IWCF Equipment Sample Questions (Surface Stack)

FREQUENTLY ASKED QUESTIONS

Abandonment Program for Paramount Fort Liard F 36

HydroPull. Extended-Reach Tool. Applications

5k Slickline Lightweight Pressure Control Equipment 4 ID

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

Engineered solutions for complex pressure situations

BP SIT Testing Franks Facility Lafayette

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

WELL NO: BJN-8. Lower master valve

1. The well has been shut in on a kick and the kill operation has not started.

APPENDIX A1 - Drilling and completion work programme

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Completions & Workovers Module 1.9

Deepwater Horizon Incident Internal Investigation

Coal Bed Methane (CBM) Permeability Testing

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Industry Code: Alberta Small Employer OHS Legislated Requirements

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

Remedial Efforts for Fracture Treatment in Horizontal Laterals Robert Reyes, Halliburton

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

Retrievable Bridge Plugs

Chapter 5 HORIZONTAL DRILLING

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

HPHT Annular Casing Packer. Obex Annular Casing Packer

SUBSEA KILL SHEET EXERCISE No. 5

Standard Operating Procedures

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Shell Castor & Pollux Rig Equipment Primary Items

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

CHE Well Testing Package/Service:

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Extended leak off testing

TurboDraft Fire Eductor

LIMITED ENTRY CLUSTER PERFORATING SYSTEM IMPROVES FRACTURING EFFICIENCY IN HORIZONTAL WELLS

W I L D W E L L C O N T R O L COMPLETIONS AND WORKOVERS

OCEAN DRILLING PROGRAM

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

SPE MS. Copyright 2015, Society of Petroleum Engineers

W I L D W E L L C O N T R O L FLUIDS

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

BLACK HILLS PLATEAU PRODUCTION COMPANY

Transcription:

Report 1 8/3/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 1. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Keith Immatty Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 32,678/4,413,1. Daily (hr/%) / Actual divided by AFE.1 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 32,678 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: 24 Hour Summary Operations Summary Spotted equipment and conducted PJSM. N/U and performed test 1-3 for tubing head spool and frac valve. Update Since Report Time 24 Hour Forecast 8/4/216 5:57:6 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 1 8/3/216 12:.5 Spot equipment. PJSM 12:3.5 N/D adapter flange 13:.5 P/U and N/U tubing head spool and frac valve 13:3 1. Test seal and void. Uninstall BPV and install 2 way check valve 14:3 1. Troubleshoot frontier testing equipment. 15:3 3. Perform tests 1-3. Total 6.5 8/4/216 5:57:6 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

Report 2 8/14/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 2. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 8,415/4,413,1. Daily (hr/%) / Actual divided by AFE.2 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 47,737 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: Personnel: 21 Days / Nights Man hours: 145 Days / Nights Drive hours: 3 Days / Nights SSE's: Days / Nights JSA's: 6 Days / Nights Drills: Days / Nights Stop cards: Days / Nights HEROS: Days / Nights Incidents: Days / Nights Inspections: 2 Days / Nights HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 6 1 24 Hour Summary Operations Summary 8/15/216 5:52:54 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 2 8/14/216 Update Since Report Time NU FMC FRAC TREE AND TETRA FLOWBACK PKG 24 Hour Forecast PSI TEST CASING AND OPEN ALPHA SLEEVE 7:.5 PREW RUF HSM, Discuss all vendors JSA'S, Job duties and Heat Awareness. 7:3 1. PREW RUF 7" Casing psi = 9-5/8"x7" casing = 1 psi NU Frac Tree on top of 7-1/16" 1k Manual Gate Valve (LMV) Tree Configuration from Top of LMV up; 8:3 1: 1:2 11: 1.5.33.67 5.5 PREW RUF PREW RUF PREW RUF PREW RUF 7-1/16" 1k Manual Gate Valve (UMV) 4-1/16" 1K Flowcross - (2) 4-1/16" 1K Manual Gate Valve (Left) - (1) 4-1/16" 1K Manual Gate Valve (RIght) - (1) 4-1/16" 1K Hydraulic Gate Valve (ht) 7-1/16" 1K Hydraulic Gate Valve RU hydraulic accumulator, function test hydraulic wing valve and hydraulic master valve. Verify all turns on frac tree valves. MIRU Tetra Flowback PKG Pressure test 4" Hydraulic OFWV, 7" Hyd, 4" outer opposite manual valve, 5psi low 98psi high. Bleed pressure and set valves for next test. Pressure test 4" Manual IFWV and 4" Manual opposite IFWV valve 5psi low 98psi high. Continue to RU Tetra Flowback PKG. 16:3 18: 1.5. PREW RUF PREW RUF Psi test Tetra Flowback iron 5 psi/low 5 min, 95 psi/high 5 min PSI TEST GOOD Secure SDFN Total 11. 8/15/216 5:52:54 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

Report 3 8/15/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 3. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Jeff Pontell 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 17,63/4,413,1. Daily (hr/%) / Actual divided by AFE.2 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 27,215 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: Personnel: 23 Days / 9 Nights Man hours: 131 Days / 93 Nights Drive hours: 35.5 Days / 26 Nights SSE's: Days / Nights JSA's: 6 Days / 5 Nights Drills: Days / Nights Stop cards: Days / Nights HEROS: Days / Nights Incidents: Days / Nights Inspections: 2 Days / 2 Nights HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 11 2 24 Hour Summary Operations Summary 8/16/216 5:26:24 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 3 8/15/216 NU FMC FRAC TREE AND TETRA FLOWBACK PKG Update Since Report Time PSI TEST CASING, OPEN BAKER ALPHA SLEEVE AND START DFIT 24 Hour Forecast CONTINUE INJECTION TEST, PREP PAD FOR STAGE 1 PUMPDOWN/FRAC 8/16/216 5:26:24 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 3 8/15/216 7:.5 PREW RUF HSM Discus all vendors JSA'S, Job duties and heat awareness. 7:3 9:5 9:25 1.58.33.58 PREW RUF PREW RUF PREW RUF 7" CASING PSI = PSI 9-5/8" X 7" annulus casing psi = PSI MIRU Renegade WLU, Function test WL Valves and MU Gauge Ring BHA Consisting of: 1.375" Cable Head,Length = 1.13', 2.75" CCL, Length = 1.46' 2.75" Weight bar, Length = 7' 3.125" Quick Change, Length = 1' 3.5" Junk Basket, Length = 6.5' 3.78" Gauge Ring MU WL Valves and lubricator to FMC Frac Stack. PSI Test Renegade Lubricator, 5 psi low/5 min, 1 psi high/5 min. (TEST GOOD) RIH 1: 1:5.83.5 PREW RUF PREW RUF Tag liner top @11,415'(WLM) After several attemps to RIH past liner top only 15' past liner top was achieved, decision was made to POOH and inspect gauge ring. POOH to inspect BHA. 11:2 12: 14:.67 2. 2. PREW RUF PREW OTS PREW OTS At surface with W/L, Bump up, SIW, Bleed off psi and check BHA. After inspection of BHA it was noticed that the Gauge ring and junk basket was filled with drilling mud, decision was made to RD Renegade W/L and move forward with opening the Baker alpha sleeve and attempt to clear well bore. RDMO Renegade W/L, MIRU Keane pump truck and related equipment. Wait on Keane 2nd pump truck, acid truck and restraints to AOL. 16: 1. PREW OTS MIRU Keane 2nd pump truck 17:.25 PREW OTS Wait on restraints and acid. 17:15 1.25 PREW OTS Install restraints on Keane pump iron. 18:3 19:.5.5 PREW OTS PREW OTS PSI Test Keane pump iron, 5 psi/low 5 min, 98 psi/high 5 min (TEST GOOD) HSM with night crew 19:3.33 PREW OTS Spot acid truck and prepare for TRRC Casing test. 19:5 2:12 2:25 2:35 2:42 22:5.37.22.17.12 1.38.83 PREW OTS PREW OTS PREW OTS PREW OTS PREW OTS PREW OTS Open well with psi, Bring pump rate up to 1.5 bpm and psi up casing to 565 psi and hold for 15 minutes for TRRC Test. Bring pump rate up to 1.5 bpm and monitor psi for sleeve activation. PSI brokeback at 8455 psi, SD pump and monitor ISIP. Total bbls pumped = 6.5 Monitor psi for ISIP 5 MIN = 53 PSI 1 MIN = 4915 PSI 15 MIN = 474 PSI Bring pump rate up to 1 bpm and monitor psi. PSI lined out at 69 PSI Raise rate to 1.4 bpm. PSI lined out at 73 PSI = 1.4 bpm PSI = 74 Total bbls = 13 22:55 23: 23:31.8.52.48 PREW OTS PREW OTS PREW OTS Start pumping 15 gallons of 15% acid. Bring rate to 2.5 bpm, pressure lined out at 63 psi. Continue displacing acid. Bring rate to 2.75 bpm, pressure lined out at 65 psi. Continue displacing acid With two loads FW on the way, drop rate to 1.5 bpm to avoid having to shut down due to running out of water. Pressure lined out at 58 8/16/216 5:26:24 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3

bore Report 3 8/15/216 psi. ETA on water :. Total 17. 6. Update :.42 PREW OTS With two loads FW on the way, drop rate to 1.5 bpm to avoid having to shut down due to running out of water. Pressure lines out at 58 psi. ETA on water :. :25.5 PREW OTS Drop rate to 1 bpm to avoid running out of water and shutting down. Pressure lines out at 53 psi. Still no water delivered. :55.42 PREW OTS Drop rate to.75 bpm to avoid running out of water. Updated ETA on water 15-2. Pressure lines out at 5 psi. 7 bbl water remaining on location. 1:2.17 PREW OTS Drop rate to.5 bpm to avoid running out of water. 3 bbl water remaining on location. 1:3.33 PREW OTS Two loads FW arrived on location before location capacity ran out. Offload water. Have enough water to displace acid to sleeve + 2 bbl. ETA on last water truck 3. 1:5.85 PREW OTS Walk rate back up to continue displacing acid. s and pressures as follow: 1 bpm @ 533 psi, 1.25 bpm @ 55 psi, 1.5 bpm @ 57 psi, 1.75 bpm @ 58 psi, 2 bpm @ 6 psi, 2.25 bpm @ 6 psi, 2.5 bpm @ 6 psi, 2.75 bpm @ 617 psi, 3 bpm @ 63 psi. Slow pressure creep to 69 psi. 2:41.32 PREW OTS After pressure creep to 75 psi, reduce rate to 1 bpm to address pressure creep and time location volume with incoming water truck ETA 315. 3:.87 PREW OTS Water truck arrived and offloaded, walk rate up to 1.5 bpm. Complete acid displacement at 55 bbl. Pressure drops from 7 psi to 54 with acid at sleeve. 3:52.22 PREW OTS Discuss injection test and set pump kickouts. ISIP before test 522 psi. Bring on pumps at following rates and pressures: 2.5 bpm @ 518 psi, 4 bpm @ 528 psi, 6 bpm @ 528 psi, 8 bpm @ 52 psi, 9 bpm @ 52 psi, 11 bpm @ 535 psi, 12 bpm @ 55 psi. Pump away 6 bbl injection test and shut down. ISIP 51 psi. 4:5.42 PREW OTS Shut in well and bleed off. Verify psi at flowback and pumps. Perform walkaround with crews and then release Tetra and Keane. 4:3 2. COIL NOA No activity, wait on daylight. 8/16/216 5:26:24 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 4

Report 4 8/16/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 4. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Donnie Van Ness 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 122,598/4,413,1. Daily (hr/%) / Actual divided by AFE.3 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 12,917 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: Personnel: 31 Days / Nights Man hours: 197 Days / Nights Drive hours: 46 Days / Nights SSE's: Days / Nights JSA's: 8 Days / Nights Drills: Days / Nights Stop cards: Days / Nights HEROS: Days / Nights Incidents: Days / Nights Inspections: 2 Days / Nights HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 8 3 24 Hour Summary Operations Summary 8/17/216 5:35:37 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 4 8/16/216 PERFORM TRRC CASING TEST, OPEN BAKER ALPHA SLEEVE AND START DFIT Update Since Report Time CONTINUE INJECTION TEST, PSI TEST CASING, MADE 14 ATTEMPTS TO PULL PLUG. 24 Hour Forecast MIRU SL UNIT, ATTEMPT TO PULL PLUG. 8/17/216 5:35:37 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 4 8/16/216 :.42 PREW OTS With two loads FW on the way, drop rate to 1.5 bpm to avoid having to shut down due to running out of water. Pressure lines out at 58 psi. ETA on water :. :25.5 PREW OTS Drop rate to 1 bpm to avoid running out of water and shutting down. Pressure lines out at 53 psi. Still no water delivered. :55.42 PREW OTS Drop rate to.75 bpm to avoid running out of water. Updated ETA on water 15-2. Pressure lines out at 5 psi. 7 bbl water remaining on location. 1:2.17 PREW OTS Drop rate to.5 bpm to avoid running out of water. 3 bbl water remaining on location. 1:3.33 PREW OTS Two loads FW arrived on location before location capacity ran out. Offload water. Have enough water to displace acid to sleeve + 2 bbl. ETA on last water truck 3. 1:5.85 PREW OTS Walk rate back up to continue displacing acid. s and pressures as follow: 1 bpm @ 533 psi, 1.25 bpm @ 55 psi, 1.5 bpm @ 57 psi, 1.75 bpm @ 58 psi, 2 bpm @ 6 psi, 2.25 bpm @ 6 psi, 2.5 bpm @ 6 psi, 2.75 bpm @ 617 psi, 3 bpm @ 63 psi. Slow pressure creep to 69 psi. 2:41.32 PREW OTS After pressure creep to 75 psi, reduce rate to 1 bpm to address pressure creep and time location volume with incoming water truck ETA 315. 3:.87 PREW OTS Water truck arrived and offloaded, walk rate up to 1.5 bpm. Complete acid displacement at 55 bbl. Pressure drops from 7 psi to 54 with acid at sleeve. 3:52.22 PREW OTS Discuss injection test and set pump kickouts. ISIP before test 522 psi. Bring on pumps at following rates and pressures: 2.5 bpm @ 518 psi, 4 bpm @ 528 psi, 6 bpm @ 528 psi, 8 bpm @ 52 psi, 9 bpm @ 52 psi, 11 bpm @ 535 psi, 12 bpm @ 55 psi. Pump away 6 bbl injection test and shut down. ISIP 51 psi. 4:5.42 PREW OTS Shut in well and bleed off. Verify psi at flowback and pumps. Perform walkaround with crews and then release Tetra and Keane. 4:3 2.5 COIL NOA No activity, wait on daylight. 7:.5 PREW OTS HSM with day crew 7:3 1: 1:3 13:45 2.5.5 3.25.33 PREW OTS PREW OTS PREW OTS PREW OTS 7" CASING PSI = 52 PSI 9-5/8" X 7" annulus casing psi = PSI RDMO Keane secondary pump truck and acid buggy, wait on Renegade W/L Renegade AOL, HSM, Discuss all JSA'S, job duties, line of fire, hand placement and heat exaustion. MIRU Renegade WLU, Function test WL Valves and MU Gauge Ring BHA Consisting of: 1.375" Cable Head,Length = 1.13', 2.75" CCL, Length = 1.46' 2.75" Weight bar, Length = 7' 3.125" Quick Change, Length = 1' 3.5" Junk Basket, Length = 6.5' 3.78" Gauge Ring MU WL Valves and lubricator to FMC Frac Stack. PSI Test lubricator 5 psi/low, 75 psi/high 14:5.67 PREW OTS Open well with 52 psi RIH 14:45.8 PREW OTS Stop at 11,62' 14:5.42 PREW OTS Log across liner top at 11,438' (WLM) POOH 15:15 15:2.8.42 PREW OTS PREW OTS At surface with W/L, SIW with 52 PSI, Bleed off PSI and change out BHA. MU Renegade BHA consisting of: 1.375" Cable Head,Length = 1.13', 2.75" CCL, Length = 1.46' 2.75" Weight bar, Length = 7' 3.125" Quick Change, Length = 1' 3.13" Firing Head =.25' 2.75" Baker 1 Setting Tool, Lenghth = 4.38' 8/17/216 5:35:37 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3

bore Report 4 8/16/216 3.779" Baker Reteivable Plug assymbly, Length = 6.91' MU WL Valves and lubricator to FMC Frac Stack. 15:45.17 PREW OTS PSI Test lubricator 5 psi/low, 75 psi/high 15:55 1. PREW OTS Open well with 52 psi, RIH 16:55 17:.8.33 PREW OTS PREW OTS Set plug at 11,525'(WLM) Weight before = 182#s Weight after = 167#s POOH 17:2 17:25 17:55.8.5.42 PREW OTS PREW OTS PREW OTS At surface with W/L, SIW with 52 PSI, Bleed off PSI and change out BHA. MU Baker Retrieving head BHA Consisting of: 1.375" Cable Head,Length = 1.13', 2.75" CCL, Length = 1.46' 3.25" Weight bar, Length = 1' 3.25" Jars, Length = 8' 3.742" Retrieving Head, Length = 1.8' Open well with 38 psi and bring psi up to 95 psi(hold for 1 min) 18:2 19:.67.33 PREW OTS PREW OTS Bleed psi down to 5 psi, SIW, PSI Test lubricator to 75 psi. Equalize to 5 psi. Open, RIH w/bha to retriev plug. 19:2 19:5.5.17 PREW OTS PREW OTS Pressure up on csg to 63 psi. Look liked we latched plug but pulled right off. Made 14 more attempts and could not latch plug. Jarred down on plug with no luck. Consult with field sup and Engineer, will RU SL unit in the AM. 2:.5 PREW OTS Bled csg to 4 psi. POOH 2:3 22: 1.5.5 PREW OTS PREW OTS OOH, SICP= 31 psi. SWI, bleed lubricator and surface line pressure to psi, RDMO WL. Secure. SDFN. Total 22.5 8/17/216 5:35:37 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 4

Report 5 8/17/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 5. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Donnie Van Ness 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 147,682/4,413,1. Daily (hr/%) / Actual divided by AFE.3 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 6,993 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 4 24 Hour Summary Operations Summary Update Since Report Time 24 Hour Forecast 8/18/216 5:39:13 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 5 8/17/216 7: 11. PREW OTS Wait on Braided line unit. Total 11. 8/18/216 5:39:13 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

Report 6 8/18/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 6. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Eric Huls/ Wes Garver 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 17,417/4,413,1. Daily (hr/%) 1./4.17 Actual divided by AFE.4 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 22,735 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: DAY/ NIGHT Personnel - 3/ 16 SSE % - / Man Hours 116/78 Driving Hours 72/4 Total Hours 188/118 JSA s 6/6 Pauses 1/2 Stop Cards / HEROS / Incident/Near Miss / Drills / Audits/Inspections / Orientations / Tours / 8/19/216 5:31:19 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 6 8/18/216 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 12 5 24 Hour Summary Operations Summary COULDNT LATCH BAKE PLUG, DECISON WAS MADE TO BRING IN CT AND RETRIEVE PLUG Update Since Report Time MIRU CT. 24 Hour Forecast RIH AND RETRIEVE BAKER PLUG, RDMO CT. 8/19/216 5:31:19 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 6 8/18/216 : 7.5 PREW OTS Wait on Braided line unit. 7:3 8:15.75 1.8 PREW PREW Fesco braided line unit AOL, HSM, Discuss all JSA'S, job duties, line of fire, hand placement and right to stop the job. MIRU Fesco braided line unit 9:2.8 PREW Function test wireline valves 9:25 3.15 PREW Continue RU of Fesco unit MU Baker Retrieving head BHA Consisting of: 1.75" Rope Socket, Length =.67" 1.75" Swivel, Length =.85' 2.5" crossover, Length =.5' 2.5" Weight bar, Length = 15' 2.5" Crossover, Length.5' 2.125" Oil Jars, Length = 6' 2.5" Crossover, Length.5' 2.5" Spang Jars, Length = 6' 2.25" Crossover, Length.67' 1.5" Crossover, Length.3' 2.25" Pulling Tool, Length 1.25' 3" Bait Sub, Length 1.75' Baker Overshot and grapple, Length 2.5' 12:34.27 PREW MU WL Valves and lubricator to FMC Frac Stack. PSI Test lubricator 5 psi/low, 7 psi/high 12:5.67 PREW Open well with 34psi and RIH 13:3 14:1.67.9 PREW PREW Pressure up on csg to 65 psi prior to getting to liner top at 1144'. Unable to get through liner top after making multiple attempts. POOH 15:4 15:35 15:4 15:55.52.8.25.58 PREW PREW PREW PREW At surface with W/L, SIW with 32 PSI, Bleed off PSI and change out BHA. MU 2.25" Bailer BHA Consisting of: 1.75" Rope Socket, Length =.67" 1.75" Swivel, Length =.85' 2.5" crossover, Length =.5' 2.5" Weight bar, Length = 15' 2.5" Crossover, Length.5' 2.125" Oil Jars, Length = 6' 2.5" Crossover, Length.5' 2.5" Spang Jars, Length = 6' 2.25" Crossover, Length.67' 1.5" Crossover, Length.3' 2.25" Bailer, Length 6.875' 2.25" Chisel Bottom Ball Check, Length.5' MU WL Lubricator to FMC Frac Stack. PSI Test lubricator 5 psi/low, 7 psi/high Open, RIH w/bha to attempt to pass through liner top. 16:3 16:45.25.28 PREW PREW Pressure up on csg to 65 psi prior to getting to liner top at 1144'. Unable to get through liner top after making multiple attempts. POOH 17:2.97 PREW POOH, SICP= 22 psi. SWI, bleed lubricator and surface line pressure to psi, RDMO WL. RDMO Keane Pumps. 18: 19: 21: 1. 2. 1. Bailer arrived at surface full of dark sludge that appears to be pipe dope. Sample collected and will be sent off to be tested. PREW NU 4" valve and test 3 low, hold for 5 min, test good. Pressure test high 98 psi, hold for 5 min, test good. Bleed down pressure. COIL RGU Move in CT unit, spot unit and light plants. Move Crane into position for CT job. COIL RGU 1 ***SHELL*** WAITING ON CT PUMP TRUCK WITH CHANGEOVER TO ARRIVE ON LOCATION. CT CREW COMING 8/19/216 5:31:19 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3

bore Report 6 8/18/216 FROM PREVIOUS JOB. 22:.5 COIL RGU STOP**** CT CREW ON LOCATION. SPOT EQUIPMENT. 22:3 22:45 23:45.25 1..25 SAF SAFETY MEETING, GO OVER JSA'S AND PERMITS, DISCUSS 12 LSR'S, 3 GR'S, L&H, 12 Q'S, LINE OF FIRE, HAND PLACEMENT, GOOD COMMUNICATION, LINE OF FIRE, WORKING AT HEIGHTS, STAYING HYDRATED, WEATHER AND STOP THE JOB AUTHORITY. COIL RGU NO-GO IRON, RU PUMP IRON, FUCTION TEST BOP'S, LAY OUT HOSES TO WATER TANK. NU 4 1/16" X 5 1/8" ADAPTER FLANGE COIL RGU PU/NU BOP'S TO ADAPTER FLANGE. Total 24. 6. Update : COIL RGU Continue to ru CT pump lines and kill lines, ru restraints. Summary Start Date/Time Responsible Company Code Failure MD (ft) Ops Code Type* Equipment Type Net time (hr) Gross time (hr) Severity Status 8/18/216 21: SHELL Wait On Equipment RGU N Coil Tubing Surface Equipment 1. 1. OPEN : SHELL WOE WAITING ON CT PUMP WITH CHANGEOVER TO ARRIVE ON LOCATION Title: WOE Total 1. 1. 8/19/216 5:31:19 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 4

Report 7 8/19/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 7. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Eric Huls/ Wes Garver 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 217,383/4,413,1. Daily (hr/%) / Actual divided by AFE.5 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 47,91 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 2 Safety Comments: DAY/ NIGHT Personnel - 27/ 2 SSE % - /5 Man Hours 23 / 22 Driving Hours 57/ 49 Total Hours 287/ 269 JSA s 6/6 Pauses 2/2 Stop Cards / HEROS / Incident/Near Miss / Drills / Audits/Inspections / Orientations / Tours / 8/2/216 5:36:25 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 7 8/19/216 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 12 6 24 Hour Summary Fished baker plug with CT, RDMO CT. RU WL Update Since Report Time RU WL. Prep for frac operations. 24 Hour Forecast Frac Operations Summary 8/2/216 5:36:25 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 7 8/19/216 : 2.25 COIL RGU Continue to RU CT pump lines and kill lines, RU restraints. 2:15 2:55 3:45 4:3 4:5 5:2 6:15 6:3 7: 7:32 9:21 9:25 9:35 12:2 12:45 12:47 13:3 13:2 15:8 15:37 16:39 18:6 18:3 19:.67.83.75.33.5.92.25.5.53 1.82.7.17 2.75.42.3.27.28 1.8.48 1.3 1.45.4.5 1.5 COIL RGU PU Injector, MU lubricator. COIL RGU Check Slim Line Dimple Connector, MU pull plate, pull test to 4K, test good. Finish up with P&ID, prep to load reel with treated water. COIL RGU Load reel with 72bbls of treated water. COIL RGU MU test sub, psi test CT to 4K. Test good. COIL RGU MU TTS/Baker BHA as follows: Dimple Connector for 2 3/8" CT- OD- 2.88",ID-.88", Length -.82' Dual BPV- OD-2.88", ID-1.", Length- 1.41' Hailey Bi Directional Jar- OD-2.88", ID-1", Length- 4.63' Hydraulic Disconnect- OD-2.88",.69" ID, Length - 2.23' Titan Ultra Short Motor- OD- 2.88", Length- 5.7' Rotary Sub- OD-2.88", ID-1.38", Length-.48' Cross Over- OD-3.6", ID- 1.88",.Length-68' On/OFF Tool- OD-3.74", Length- 2.5' COIL RGU Function test motor @ 3bpm, 31 psi. Shut down pump, MU lubricator to BOP's COIL RGU Pause, go over 9Q's, discus line of fire, good communication and stop the job authority. COIL RGU Walk the lines, break circulation, shut in at the manifold and pressure test. Test 4 Low, hold for 5 min, test good. Bring up pressure to 95 psi, had leak at bowen connection. Bleed off pressure, check seals at connection. Crew Change. Safety meeting with the day crew. COIL RGU Walk the lines, break circulation, shut in at the manifold and pressure test. Test 5 Low, hold for 5 min, test good. Bring up pressure to 92 psi, hold for 5 min., test good. COIL CTR Put 28 psi on well head. Open upper master valve. equalized at 25psi. RIH with CT while pumping.9 bpm in and taking.9 bpm out. COIL CTR Record PU weight prior to reaching liner top. Depth = 194' Pump.9 bpm in and out Pump Circ Psi = 58psi PU weight 22K lbs COIL CTR RIH through liner top without seeing any restriction. RIH and tagged at 11492'. COIL CIR PU to 1148'. Increase pump rate to 3 bpm in and 3 bpm out. Pump 1 bbl gel sweep and continue to pump until getting bottoms up COIL CTR Build wellhead pressure to 6psi prior to going down to latch plug. Pressure slowly builds. COIL CTR RIH. Reach 11678' without landing on anything. COIL PCT POOH with CT to 1136'. COIL PCT Pump down casing at 1 bpm to do determine if the packer is still set. Pressure builds slightly and then stays constant. COIL POOH CT. COIL SIW with 2psi on the well. Lay out the retievable plug COIL Close in flowback manifold, open well, Pump 125 bbl into the well with the CT pump. Pumped at 3bpm and pressure lined out at 72psi. COIL SIW with 55 psi on the well. Blow down CT reel to the flowback tanks COIL RGO down and backload CT lubricator. RDMO CT unit. COIL RGO Safety meeting, go over jsa's and permits, discuss 12 LSR's, 3GR's, L&H, hand placement, line of fire, good communication and stop the job authority. COIL RGO Continue to RDMO CT. NU goat head and 4" crown valve, 8/2/216 5:36:25 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3

bore Report 7 8/19/216 2:3 1. FRAC RIF Spot accumulator and test unit. Prep for frac and WL rig up. RD crane and move into position for frac/wl. 21:3.75 FRAC RIF Lay out spill containment for WL 22:15.75 FRAC RIF Spot in WL unit. 23: 23:15.25.75 FRAC RIF FRAC RIF Safety meeting, go over jsa's and permits, discuss lifting ops, pinch points, good communication and stop the job authority. RU WL, function test bop's. Test good. MU BOP's to tree. Total 24. 6. Update : 1. FRAC RIF RU WL, function test bop's. Test good. MU BOP's to tree. MU WL lubricator 1: FRAC RIF Wait on frac equipment to arrive. 8/2/216 5:36:25 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 4

Report 8 8/2/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 8. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Eric Huls/ Wes Garver 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 282,93/4,413,1. Daily (hr/%).5/2.8 Actual divided by AFE.6 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 23,112 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 1 Safety Comments: DAY/ NIGHT Personnel - 29/ 38 SSE % - /1 Man Hours 285 / 432 Driving Hours 58/ 8 Total Hours 343/ 512 JSA s 8/8 Pauses 1/1 Stop Cards / HEROS / Incident/Near Miss / Drills / Audits/Inspections / Orientations / Tours / 8/21/216 4:59:17 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 8 8/2/216 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 16 7 24 Hour Summary Operations Summary MIRU Frac and WL, had a swarm of bees on the water tanks, needed to call out a bee keeper to continue RU Update Since Report Time MIRU Frac and WL, had a swarm of bees on the water tanks, needed to call out a bee keeper to continue RU 24 Hour Forecast Frac operations. : 1. FRAC RIF RU WL, function test bop's. Test good. MU BOP's to tree. MU WL lubricator 1: 4.75 FRAC RIF Wait on frac equipment to arrive. 5:45.75 FRAC RIF Frac crew on location, Spot frac equipment and RU 6:3.5 SAF Safety meeting, crew change. 7: 11.5 FRAC RIF MIRU Frac equipment as it arrives on location 18:3 19: 21:45.5 2.75.5 FRAC RIF FRAC RIF 1 Safety meeting, go over jsa's and permits, discuss good communication, L&H, 12 LSR's, ERP's, bee's on location, staying hydrated, weather, 3 point contact and stop the job authority. Spot in horse power, continue to RU, wait on bee keepers to arrive on location to take care of swarm. Bee keepers on location, remove bees. 22:15 1.75 FRAC RIF *** STOP*** BEES REMOVED FROM WATER TANKS. Spot in blender, RU remaining frac equipment. Total 24. 6. Update : 2. FRAC RIF RU backside frac equipment, prep chemicals and set up to prime up trucks. 2: FRAC RIF Prime up trucks, prep to pressure test. Summary Start Date/Time Responsible Company Code Failure MD (ft) Ops Code Type* Equipment Type Net time (hr) Gross time (hr) Severity Status 8/2/216 21:45 SHELL Wait On Safety RIF N.5 OPEN : WAIT ON BEE KEEPERS Title: BEES IN WATER TANKS Total.5 8/21/216 4:59:17 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

Report 9 8/21/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 9. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Eric Huls/ Wes Garver 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 49,651/4,413,1. Daily (hr/%) / Actual divided by AFE.11 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 28,558 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 3 1 Safety Comments: DAY/ NIGHT Personnel - 32/ 3 SSE % - /1 Man Hours 384 / 36 Driving Hours 65/65 Total Hours 449/ 425 JSA s 8/8 Pauses 1/1 Stop Cards /3 HEROS / Incident/Near Miss / Drills / Audits/Inspections / Orientations / Tours / Stop cards: Bee swarm on locaiton, carying iron, tripped over hose, check valve rigged up backward. 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 9 8/21/216 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 16 8 24 Hour Summary Started frac, stg 1-4 Update Since Report Time Frac stg 1-4 24 Hour Forecast Continue frac ops Operations Summary 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 9 8/21/216 : 2. FRAC RIF RU backside frac equipment, prep chemicals and set up to prime up trucks. 2: 1. FRAC RIF Prime up trucks, prep to pressure test. 3: 1. FRAC RIF Had to change out a check valve on a pump truck. 4: 5: 5:15 1..25.42 FRAC RIF FRAC RIF FRAC RIF Walk lines, verify valve alignment, pressure test frac iron, test low 1 psi, test good, pressure up to 943 psi, hold for 5 min, test good. Bleed down pressure. Gather everyone for a safety meeting. Safety meeting, go over jsa's and permits, discuss good communication, line of fire, valve alignment, pinch points, L&H, 12 LSR's, 12 Q's, using tag lines, and stop the job authority. Double check equipment, prep to equalize WHP. 5:4 6:3 6:5.83.33.33 FRAC RIF Gather valve team and open well, WHP-525 psi, 9 5/8" X 7"- psi. Begin pumping Stage 1. SAF Crew Change Safety Meeting with Day Crew: Discuss muster locations, hospital locations and primary drivers. Review job assignments, safety/hazards, safety 1st, non-complacency and staying focused. FRAC FRT Complete Stage 1: 7:1 7:42.53.13 FRAC FWL FRAC FWL Stage 1 Summary Interval 19813-19815 Open Pressure 5,25 psi Max Treating Pressure 9,327 psi Max Slurry 6 bpm Average Treating Pressure 8,737 psi Average Slurry 52 bpm Breakdown Pressure 8,65 psi Breakdown 1 bpm Breakdown Volume 1,8 gal Avg HHP 11,114 hp Final ISIP 5,662 psi Frac Gradient.932 psi/ft Pad Volume 21,966 gal Main Body Volume 127,242 gal Flush Volume 26,544 gal 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped 92, lbs Proppant in Formation 92, lbs Avg Proppant Concentration 1.27 lb/gal Max Proppant Concentration 2.23 lb/gal Load to Recover 3,3 bbls Load to Recover w/o Acid 3,1 bbls 15% HCL Spearhead 1,2 gal Slickwater Fluid Pumped 2,981 bbls 1# Linear Fluid Pumped 2 bbls 2# Linear Fluid Pumped bbls Pump down volume bbls pump down rate N/A bpm Max pump down pressure N/A psi Fluid Temp 72.?F Total Pump Time 1:27 hr:min Pumps Lost During Job Treatment Start Time 5:4 Treatment End Time 7:7 Diverter Slurry bbls Handover from frac to wireline. Pick up lubricator. Remove night cap. PU tools. Stab lubricator. Fill lubricator. 7:5 8:.17 3.5 FRAC FWL Pressure test lubricator to 6 psi low for 5 mins and 95 psi high for 5 mins. Open well with 51 psi. 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3

bore Report 9 8/21/216 Stage #2 Plug and Perf RIH with (4) 1' Keane guns: 2.75"" OD HSC at 6SPF with 6* phased perforating guns and a 3.65" Downhole Technology Boss Hog composite frac plug. 11:3 1.17 RIH to 6'. *****Begin on Keane Wireline (WOE) @ 8:3 Waiting on cable to connect wireline laptop to perf panel inside wireline unit. FRAC *****End on Keane Wireline (WOE) at 11:3. Total time = 3 hours Continue RIH with Stage #2 Plug and Perf Tie into liner top @ 1148'. Bring on pumps at 1195'. Pump down as follows: 3 bpm @ 5 psi 6 bpm @ 54 psi @ 125' 9 bpm @ 57 psi @ 121' 12 bpm @ 662 psi @ 123' 14 bpm @ 6591 psi @ 126' Max:14 bpm. Max: 6634 psi. Depth: 1979' 12:4 1.33 FRAC Set plug @ 19752 ft Perforate as follows: 19764' - 19765' 19712' - 19713' 1966' - 19661' 1968' - 1969' Stabilized pressure after perforating: 4975 psi Pump down volume: 156 bbl POOH while logging with WL 14:.3 FRAC WLF Shut in well with 465 psi. Bleed off. 14:2 14:9.12 2.57 FRAC WLF FRAC FRT Break lubricator. All shots fired. Drop ball. MU night cap. LD tools and lub. Secure crown and wing valves. Handover from WL to frac. Equalize at 463 psi and open well. Pump Stage #2 Stage 2 Summary Interval 1968-1961 Open Pressure 4,62 psi Max Treating Pressure 9,243 psi Max Slurry 6 bpm Average Treating Pressure 8,842 psi Average Slurry 5 bpm Breakdown Pressure 8,188 psi Breakdown 9 bpm Breakdown Volume 19,362 gal Avg HHP 1,879 hp Final ISIP 5,858 psi Frac Gradient.921 psi/ft Pad Volume 24,822 gal Main Body Volume 247,418 gal Flush Volume 25,914 gal 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped 35,72 lbs Proppant in Formation 35,72 lbs Avg Proppant Concentration 1.78 lb/gal Max Proppant Concentration 3.12 lb/gal Load to Recover 5,891 bbls Load to Recover w/o Acid 5,879 bbls 15% HCL Spearhead 5 gal Slickwater Fluid Pumped 5,73 bbls 1# Linear Fluid Pumped 2 bbls 2# Linear Fluid Pumped bbls 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 4

bore Report 9 8/21/216 Pump down volume 156 bbls pump down rate 14 bpm Max pump down pressure 6,634 psi Fluid Temp 72.?F Total Pump Time 2:28 hr:min Pumps Lost During Job Treatment Start Time 14:11 Treatment End Time 16:39 Diverter Slurry bbls 16:43.15 FRAC FWL Handover from frac to wireline. Pick up lubricator. Remove night cap. PU tools. 16:52.2 FRAC FWL Stab lubricator. Fill lubricator. 16:53.7 FRAC FWL Pressure test lubricator to 5 psi low and 75 psi high. 16:57.8 Open well with 53 psi. Stage #3 Plug and Perf RIH with (4) 1' Keane guns: 2.75" OD HSC at 6SPF with 6* phased perforating guns and a 3.65" Downhole Technology Boss Hog composite frac plug. Tie into liner top @ 1148'. Bring on pumps at 119'. Pump down as follows: 3 bpm @ 54 psi 6 bpm @ 56 psi @ 12' 9 bpm @ 57 psi @ 121' 12 bpm @ 61 psi @ 1225' 14 bpm @ 62 psi @ 125' Max:14 bpm. Max: 622 psi. Depth: 1968' 17:45.88 FRAC Set plug @ 19588 ft Perforate as follows: 19556' - 19557' 195' - 1951' 19452' - 19453' 194' - 1941' Stabilized pressure after perforating: 51 psi Pump down volume: 143 bbl POOH with WL 18:38.3 FRAC WLF Shut in well with 489 psi. Bleed off. 18:4 18:44 18:58.7.23 2.15 FRAC WLF FRAC FRT FRAC FRT Break lubricator. All shots fired. Drop ball. MU night cap. LD tools and lub. Secure crown and wing valves. Handover from WL to frac. Pressure test frac iron after breaking lines to swap out frac pump. Equalize at 486 psi and open well. Pump Stage #3 Stage 3 Summary Interval 194-1942 Open Pressure 4,86 psi Max Treating Pressure 9,38 psi Max Slurry 57 bpm Average Treating Pressure 8,958 psi Average Slurry 48 bpm Breakdown Pressure 9,417 psi Breakdown 18 bpm Breakdown Volume 2,34 gal Avg HHP 1,473 hp Final ISIP 5,545 psi Frac Gradient.895 psi/ft Pad Volume 25,452 gal Main Body Volume 219,614 gal Flush Volume 27,216 gal 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped 35,34 lbs 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 5

bore Report 9 8/21/216 Proppant in Formation 35,34 lbs Avg Proppant Concentration 2.16 lb/gal Max Proppant Concentration 3.31 lb/gal Load to Recover 5,229 bbls Load to Recover w/o Acid 5,217 bbls 15% HCL Spearhead 5 gal Slickwater Fluid Pumped 5,54 bbls 1# Linear Fluid Pumped 2 bbls 2# Linear Fluid Pumped bbls Pump down volume 143 bbls pump down rate 14 bpm Max pump down pressure 6,223 psi Fluid Temp 72.?F Total Pump Time 2:1 hr:min Pumps Lost During Job 2 Treatment Start Time 18:58 Treatment End Time 21:8 Diverter Slurry bbls 21:7.3 FRAC FWL SI well, bleed off pressure Handover from frac to wireline. Pick up lubricator. Remove night cap. PU tools. Stab lubricator. Fill lubricator. Go over 9Q's. PT lubricator to 1k-8kpsi. Test good, bleed down pressure to 54psi, Gather valve team and open well. WHP-52psi. 21:25.78 "Stage #4 Plug and Perf RIH with (4) 1' Keane guns: 2.75"" OD HSC at 6SPF with 6* phased perforating guns and Downhole Technology Boss Hog composite frac plug. Tie into liner top @1148. Bring on pumps at 64'. Pump down as follows: 3bpm @ 5psi @64 6bpm @ 52psi @68 1bpm @ 55psi @66 12bpm w/ 59psi @696 12bpm w/ 6psi @66 12bpm w/ 6psi @686 12bpm w/ 6psi @416 22:12.63 Set plug @ 1938ft Perforate as follows: 19348' - 19349' 19296' - 19297' 19244' - 19245' 1919' - 19191' (up 2' collar) Stabilized pressure after perf: 55psi Pump down volume: 166bbl" POOH 22:5 23:.17.42 FRAC WLF FRAC FRT Shut in well with 49psi. Bleed off. Break lubricator. All shots fired. Drop ball. MU night cap. LD tools and lub. Secure crown and wing valves. Handover from WL to frac. Pressure test lines, equalize and open well. 23:25.58 FRAC FRT Gather valve team and open well. Pump stg 4 Total 24. 6. Update : 1.37 FRAC FRT Pump stg 4 Stage 4 Summary Interval 19192-19194 Open Pressure 4,85 psi 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 6

bore Report 9 8/21/216 6. Update Max Treating Pressure 9,371 psi Max Slurry 55 bpm Average Treating Pressure 8,994 psi Average Slurry 48 bpm Breakdown Pressure 8,864 psi Breakdown 18 bpm Breakdown Volume 19,362 gal Avg HHP 1,63 hp Final ISIP 5,612 psi Frac Gradient.91 psi/ft Pad Volume 18,12 gal Main Body Volume 21,218 gal Flush Volume 26,418 gal 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped 352,62 lbs Proppant in Formation 352,62 lbs Avg Proppant Concentration 2.34 lb/gal Max Proppant Concentration 3.8 lb/gal Load to Recover 4,791 bbls Load to Recover w/o Acid 4,779 bbls 15% HCL Spearhead 5 gal Slickwater Fluid Pumped 4,593 bbls 1# Linear Fluid Pumped 2 bbls 2# Linear Fluid Pumped bbls Pump down volume 166 bbls pump down rate 12 bpm Max pump down pressure 6,96 psi Fluid Temp 72.?F Total Pump Time 1:57 hr:min Pumps Lost During Job Treatment Start Time 23:24 Treatment End Time 1:21 Diverter Slurry bbls 1:22.17 FRAC FWL Handover from frac to WL, PU lubricator. Remove nightcap, PU tools, stab lubricator, set up to pressure test lubricator. Go over 9 Q's, walk lines. Clear area. 1:32.7 Pressure test lubricator, 5 low and 8 high. Bleed down pressure to 55. gather valve team and open well. 1:36.82 WHP- 52 psi, RIH w/ WL stg 5 guns. "Stage #5 Plug and Perf RIH with (4) 1' Keane guns: 2.75"" OD HSC at 6SPF with 6* phased perforating guns and Downhole Technology Boss Hog composite frac plug. Tie into liner top @1148. Bring on pumps at 67'. Pump down as follows: 3bpm @ 52psi @67 6bpm @ 55psi @661 1bpm @ 59psi @662 12bpm w/ 62psi @68 12bpm w/ 623psi @676 12bpm w/ 624psi @672 12bpm w/ 6275psi @68 Set plug @ 19172' Perforate as follows: 1914' - 19141' 1988' - 1989' 1936' - 1937' 18984' - 18985' Stabilized pressure after perf: 5113psi Pump down volume: 158bbl" 2:25.63 POOH 3:3.13 Shut in well with 49psi. Bleed off. "Break lubricator. All shots fired. Drop ball. MU night cap. LD tools and lub. Secure crown and wing valves. 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 7

bore Report 9 8/21/216 6. Update Handover from WL to frac." 3:11.15 FRAC FRT Pressure test lines, equalize and open well. 3:2 FRAC FRT Gather valve team and open well. Pump stg 5 Summary Start Date/Time Responsible Company Code Failure MD (ft) Ops Code Type* Equipment Type Net time (hr) Gross time (hr) Severity Status 8/21/216 8: KEANE FRAC LP Perforation WLT EN Elect W/L 3.5 3.5 1 OPEN Surface Equipment : WOE KEANE WIRELINE WAITING ON USB TO CONNECT WIRELINE LAPTOP TO SHOOTING PANEL Title: WOE Total 3.5 3.5 8/22/216 5:27:51 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 8

Report 11 8/23/216 Company Type bore WBS No/API No PERMIAN Exploration 3252289 / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 11. Objective Install Completion Original Spud Date 6/25/216 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Phone/FAX No. Status Supervisor Chris Harper Measured Depth(ft) Engineer ELIZABETH TOMCZAK TVD(ft) Other Supervisor Eric Huls/ Wes Garver 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,83.4 / 2,777.4 Hole size(in) THF Datum Operating (hr). Last Casing MD Zero (hr). Next Casing MD Reduced (hr). Current Fluid Density(ppg) Repair (hr). LOT/FIT EMW(ppg) Special (hr). Lithology Auxiliary/Secondary Work(hr). Formation NX Auxiliary Floor Not Available(hr). Formation top MD Actual cost to date/afe 1,39,193/4,413,1. Daily (hr/%) 7.87/32.78 Actual divided by AFE.24 Days Ahd(-) Bhnd(+)(5/5) Daily Cost 242,536 Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 2 5 1 Safety Comments: DAY/ NIGHT Personnel - 44/ 34 SSE % - /1 Man Hours 51 / 48 Driving Hours 9/72 Total Hours 6/ 48 JSA s 8/8 Pauses 1/1 Stop Cards /7 HEROS / Incident/Near Miss / Drills / Audits/Inspections / Orientations / Tours / Stop cards: /7 Unsafe cards: line of fire, housekeeping, over pressure iron, tight location Safe cards: good communication, keep an eye on souroundings. 8/24/216 5:4:48 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 1

bore Report 11 8/23/216 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 16 1 24 Hour Summary Frac stg 8-1 Update Since Report Time Frac stg 8-1 24 Hour Forecast Continue frac ops. Operations Summary 8/24/216 5:4:48 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 2

bore Report 11 8/23/216 : 3.25 FRAC RIF 1 up frac iron, wait on densometer to arrive. 3:15 1.5 FRAC RIF 1 Densometer on location, install restraints. 4:45.83 FRAC FRP 1 Fire up trucks, prime up trucks and set up to pressure test. 5:35 6: 6:3 6:5.42.5.33 2.25 FRAC FRP 1 Pressure test to 95 psi. Test good, equalize pressure and open well. FRAC FRT STOP****Open well. WHP- 444 psi. Pump stg 8. FRAC FRT Crew Change Safety Meeting with Day Crew: Discuss muster locations, hospital locations and primary drivers. Review job assignments, safety/hazards, communication and staying focused. FRAC FRT Continue with Stage 8. 9:5 9:31.43.7 FRAC FWL FRAC FWL Stage 8 Summary Interval 1836-18362 Open Pressure 4,911 psi Max Treating Pressure 1,391 psi Max Slurry 54 bpm Average Treating Pressure 8,511 psi Average Slurry 38 bpm Breakdown Pressure 8,33 psi Breakdown 15 bpm Breakdown Volume 18,942 gal Avg HHP 7,927 hp Final ISIP 5,668 psi Frac Gradient.96 psi/ft Pad Volume 25,41 gal Main Body Volume 316,34 gal Flush Volume 29,148 gal 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped lbs 1 Mesh Sand Pumped 35, lbs Proppant in Formation 35, lbs Avg Proppant Concentration 1.55 lb/gal Max Proppant Concentration 3.29 lb/gal Load to Recover 7,532 bbls Load to Recover w/o Acid 7,52 bbls 15% HCL Spearhead 5 gal Slickwater Fluid Pumped 7,39 bbls 1# Linear Fluid Pumped 6 bbls 2# Linear Fluid Pumped 2 bbls Pump down volume 131 bbls pump down rate 13 bpm Max pump down pressure 6,277 psi Fluid Temp 72.?F Total Pump Time 4:26 hr:min Pumps Lost During Job Treatment Start Time 17:8 Treatment End Time 9:5 Diverter Slurry bbls Handover from frac to wireline. Pick up lubricator. Remove night cap. PU tools. Stab lubricator. Fill lubricator. 9:35.5 FRAC FWL Pressure test lubricator to 1 psi low and 75 psi high. 9:38.77 Open well with 52 psi. Stage #9 Plug and Perf RIH with (4) 1' Keane guns: 2.75" OD HSC at 6SPF with 6* phased perforating guns and a 3.65" Downhole Technology Boss Hog composite frac plug. Tie into liner top @ 1148'. Bring on pumps at 1155'. Pump down as follows: 3 bpm @ 522 psi @ 1155' 8/24/216 5:4:48 Report Version: 4.1.16R5 Generated from data in EDM/Opens/PROFILE 3