CAMBRIDGE SOUTH WEST PARK & RIDE

Similar documents
CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Initial ideas for bus and cycle links

CAMBOURNE TO CAMBRIDGE Better Bus Journeys: Phase One

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

ENFIELD TOWN THE REVISED DESIGN

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

M6 Junction 10 Public Consultation

Cambridge South East Transport Study LLF 6 June 2018

Report to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

MARKHOUSE ROAD IMPROVEMENTS

Chelmsford City Growth Package

CUERDEN TRANSPORT PROPOSALS

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

The Consultation has now ended.

Technical note. 1. Introduction

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

GETTING WHERE WE WANT TO BE

A1307 HAVERHILL TO CAMBRIDGE

Tackling Peak-time Congestion in Cambridge

MILTON ROAD LLF PROJECT UPDATE

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

4. Guided Bus Explained

WHANGAREI IMPROVEMENTS

Community engagement guide May 2018

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

LET US KNOW WHAT YOU THINK

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

TRANSPORT AND MOVEMENT

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

A1307 HAVERHILL TO CAMBRIDGE CORRIDOR

Western Orbital Study Options Report Cambridge City Deal Partnership. September 2015

National Transport Awards Cambridge Park & Ride

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

M25 junction 28 improvement scheme. Have your say

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

9. Parking Supporting Statement

M6 J7 Rushall Canal: Essential Repair Work Briefing

Cambourne to Cambridge Public Transport Route. 14 November 2018

SH1 Western Belfast Bypass Transportation Assessment

North Coast Corridor:

Park & Ride Implications for TRICS Users. TRICS UGM, June 2009

A1307 HAVERHILL TO CAMBRIDGE

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Bristol City Council has produced a draft Bristol Transport Strategy document.

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

WESTERN ORBITAL BUS LINK CONSULTATION REPORT FINAL V1

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England

Cambridge Access and Capacity Study

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Design Workshops Summary of all Feedback January 2017

Greater Cambridge City Deal Executive Board & Joint Assembly

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Your views are important. Please fill in a form before you leave. Or alternatively

North West Non-Technical Summary of the Transport Assessment September 2011

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Keeping you connected

Part 3: Active travel and public transport planning in new housing developments

Tunnel Reconstruction South 5 th Street Association October 16, 2018

KING STREET TRANSIT PILOT

Greater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road

Appendix 11 Barton Greenway Review

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Mornington Crescent Junction (Cobden Junction)

Public Consultation Report December M6 Junction 10 Improvements

Welcome. If you have any questions or comments on the project, please contact:

Terwillegar Drive Expressway Draft Concept Plan

395 Express Lanes Extension

Nixon, Green, and Dhu Varren Roads. Intersection Improvement Study

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Broom Hill/Blackberry Hill Walking and Cycling Improvements

Sevenways Roundabout, and the need for a Road Safety Scheme:

ABERDEEN: CITY OF THE FUTURE

Lea Bridge Road A street for everyone Tell us

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

London Cycle Network Annual Report 2000

Frome Street Bicycle Route

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Nottingham Cycle City Frequently Asked Questions

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Transcription:

CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre

CREATING MORE PARK & RIDE SPACES The existing Park & Ride site on Trumpington Road is the busiest in the city due to its closeness to the M11, the city centre and the Cambridge Biomedical Campus. The site is often full by midday with motorists having to find alternative ways to complete their journeys. To address this issue in the short term, we will be adding 274 car spaces and 5 bus spaces, which will increase car parking from 1,340 to 1,614 spaces. Works are scheduled to start shortly and these extra spaces will be available by summer 2019. The small increase in the number of spaces at the Trumpington site will address the current challenge, but future development will place greater demand on our already congested roads. With new jobs and services at the Cambridge Biomedical Campus, such as the Royal Papworth Hospital and AstraZeneca, more and more people will want to travel to access opportunities. We want to cater for this future demand sustainably, by significantly increasing the supply of Park & Ride car parking spaces close to Junction 11 of the M11 to provide people with an alternative to driving into the Biomedical Campus and the city centre. The impact of growth without transport improvements 30,000 JOBS AT THE CAMBRIDGE BIOMEDICAL CAMPUS BY 2031 33,500 NEW HOMES IN GREATER CAMBRIDGE BY 2031 SOME OF YOUR JOURNEY MAY TAKE UP TO 7 TIMES LONGER 2

The Greater Cambridge Partnership has made a commitment to manage the impact of future development by maintaining traffic to the level recorded in 2011. We will only achieve this by providing high-quality public transport and active travel facilities, which offer alternatives to driving, to help us grow sustainably whilst improving the quality of life for residents. Our economic success is increasing the pressure on our transport network The aim is a reduction in peak-time traffic levels in the city by 10-15% by 2031 * *Based on 2011 traffic levels Two proposed options for more Park & Ride spaces 3

WHAT ARE THE OPTIONS? We are seeking your feedback on two options for increasing Park & Ride spaces: Option 1: Increase the number of spaces at Trumpington P&R site from 1,614 to 2,560 (creating an additional 946 spaces) by creating a multistorey car park. Option 2: Maintain the P&R site at Trumpington and provide a new P&R site with 2,260 spaces to the west of Junction 11 of the M11, with dedicated access from the M11. Option 1 - Multi-storey Option 1 could provide additional space at the existing Park & Ride site at Trumpington. Option 1 would: Provide an additional 946 spaces, increasing the number to 2560 Provide the spaces by building two additional storeys over part of the site Be visible by some local residents and Trumpington Meadows Primary School. Cladding of the structure could reduce the impact Be located at the existing Park & Ride site and would not require any more land Need to close part of the site during the construction, reducing the number of spaces by 700 900 for up to 18 months Provide additional parking capacity for a future CAM network stop Support Local Plan growth but would not provide enough spaces to support the Greater Cambridge Partnership s aims to reduce peak-time congestion. Cost approximately 9m and could be constructed by the end of 2023. Artist s impression We would also like to hear your thoughts on proposals to improve bus journeys from the existing Park & Ride site and if selected, from a new site into Cambridge City Centre. 4

Option 2 - New Site Option 2 could provide a new Park & Ride site north west of M11 Junction 11. Option 2 would: Provide an additional 2260 spaces increasing the number of spaces in the area to 3874 Be at ground level and may have some visual impact, but there are no houses in the immediate vicinity. Landscaping would be provided to reduce the visual impact Cause some disruption on the local highway network associated with the various access options, see pages 6-8 Larger images available at events and online Access options shown on pages 6-8 Be located in the Green Belt Potentially form part of a future CAM network Support Local Plan growth and support the Greater Cambridge Partnership s aims to reduce peak-time congestion. Cost approximately 11m and could be constructed by the end of 2023. Why this location? Four potential site options around Junction 11 as well as sites further afield were considered. These options were assessed on their expected impact on traffic flows, journey delays, ability to attract new Park & Ride users and deliverability. The proposed new site performed the best as it would offer private vehicles the chance to leave the road network before Junction 11 as well as allowing for direct access for northbound A10 and M11 traffic. What is the Cambridge Autonomous Metro (CAM) Network? A recent study looking into options for Mass Rapid Transit, commissioned by the Combined Authority and the GCP, found that a new Metro system is a viable option for Greater Cambridge - providing the capacity and the flexibility to help meet the area s future transport needs. CAM is a high-quality tram-like system, with vehicles that are not restricted to rails; it is a flexible form of public transport that can run both over or underground. This new solution is currently under development, but it does mean that any public transport facilities currently used by buses could later be used as part of the wider future CAM network. Wetland Meadow Existing vegetation Entrance to Trumpington Meadows Country Park Proposed hard surfacing Proposed vegetation More detail on the CAM concept can be found at: www.greatercambridge.org.uk/ futureinvestmentstrategy 5

PRIVATE VEHICLE ACCESS TO OPTIONS 1 AND 2 Both Options 1 and 2 could include changes to the road network to allow dedicated access for private vehicles to get to the sites. Have your say on the proposed options. If Option 1 is chosen, changes to the road at Junction 11 will be needed to accommodate the increased number of vehicles wishing to access the Trumpington Park & Ride site. This would consist of: New dedicated P&R access lanes on the exit slip roads of the M11 and the A10 The southbound M11 P&R exit slip road will bypass J11 and tie into the existing P&R lane on the A1309 Widening of the A10 roundabout bridges over the M11 at J11. Elements of this Option are also included in Option 2 proposals Please note access option costs are in addition to the chosen site costs shown on pages 4 and 5 These changes would cause some disruption to the local highways network, including the M11, M11 slip roads and A10 during construction. Approximate construction cost: 13.5m 6

If Option 2 is chosen, there are three possible options for how cars could enter and exit the site: All new site private vehicle access options could also include Option 1 elements: A southbound M11 P&R exit slip road bypassing J11 and tying into the existing P&R lane to Trumpington P&R An additional dedicated left-turn lane on the A10 for a new site. Private Vehicle Access Option A Private Vehicle Access Option B Private Vehicle Access Option C Two signalised junctions on the A10 A new left turn filter lane onto the A10 for traffic approaching the site from the M11 northbound. One signalised junction on the A10 A new dedicated northbound slip road exiting the M11 at J11, passing under the A10 and directly into the site. Dedicated slip roads to access/exit the P&R site so that vehicles do not need to turn right across the A10 A junction at the entrance to the site on the A10 for left in and left out turns only. Medium construction impact High construction impact High construction impact Access Option A helps traffic enter and exit the site but is less effective than B or C Access Option B helps traffic to enter and exit the new site the best Access Option C helps traffic to enter and exit the new site well Approximate construction cost: 4m Approximate construction cost: 12m Approximate construction cost: 11m 7

PUBLIC TRANSPORT ACCESS OPTION 2 We are seeking your feedback on two potential options for how buses could enter and exit a new Park & Ride, if Option 2 is chosen. Public Transport Access Option A Buses to use a dedicated bus-only road, leaving from the north of the site, crossing the motorway using an existing farm bridge north of Junction 11 Buses then run alongside the M11 southbound exit slip road using a dedicated bus only lane Dedicated bus only lane continues alongside the A1309 to the existing Trumpington P&R site Buses could both access and exit the site here. The fastest bus journey from the Park & RIde to Downing Street John Lewis stop would take just over 17 minutes. The construction of this access option would require some lane restrictions or temporary traffic signals on the A1309 and the junction of the A10/M11. Some lane restrictions on the M11 will probably be needed, and the bridge works will require some overnight closures of the M11. Approximate construction cost: 4.5m 8

Public Transport Access Option B Buses to pass through Junction 11 over a new dedicated public transport bridge Buses then run alongside the A10 on a dedicated lane to the existing Trumpington P&R Buses could both access and exit the site here. The fastest bus journey from the Park & RIde to Downing Street John Lewis stop would take just over 18 minutes. The construction of this access option would require some lane restrictions or temporary traffic signals on the A1309 and the junction of the A10/M11. Some lane restrictions on the M11 will probably be needed, and the bridge works will require some overnight closures of the M11. As the work is more complex, there is likely to be some reduction in traffic capacity at Junction 11. Approximate construction cost: 11.5m 9

IMPROVING BUS JOURNEYS We know that increasing Park & Ride capacity is only part of the solution to address congestion both now and in the future. We also need to provide fast, frequent and reliable public transport for Park & Ride users to complete their onward journey. Currently buses travelling from the Trumpington Park & Ride site are affected by congestion on Hauxton Road, Trumpington Road and Trumpington High Street, making journey times unreliable. This unreliability means that buses are timetabled to account for possible delays, making journeys from the Park & Ride longer than necessary even if there is little traffic. To address this, we are considering a package of measures to improve bus journey times between the Trumpington Park & Ride site and the city centre. These measures could include new bus lanes and priority for buses at traffic signals. Changes to parking arrangements could also improve bus journey times, so that buses do not need to weave between parked cars. Costs will depend on the mix of measures selected. Let us know your thoughts on how this route could be improved for bus travel. 10

What about cycling? The Greater Cambridge Partnership is also looking at cycling provision from Melbourn in to the city centre along Trumpington Road and High Street. Proposals for changing the road space to ensure more room for cycling and bus provision are being developed alongside each other. This new route from Melbourn known as a Greenway will be consulted on early next year. GCP aims to create a network of safe, attractive and cost-effective routes for cyclists and pedestrians can use all year round. On both maps delays are compared to the bus timetable which is not the fastest possible journey time Information about other transport projects which aim to improve public transport, cycling and walking across the area including A1307 improvements, the City Access project, Greenways and more can be found at www.greatercambridge.org.uk/transport 11

HAVE YOUR SAY Have your say by 21 December 2018 There are a number of ways to respond to the consultation: Join us to find out more at a public exhibition: LOCATION DATE TIME ADDRESS Trumpington Park & Ride Tuesday 20 November 2018 7:30-9:00 43 Hauxton Road, Cambridge, CB2 9FT Fill out the questionnaire at www.greatercambridge.org.uk/parkandride Hauxton Primary School Wednesday 21 November 2018 18:00-20:00 Jopling Way, Hauxton, Cambridge, CB22 5HY Complete the paper questionnaire and return by freepost or drop it in to a local event consultations@greatercambridge.org.uk 01223 699906 Trumpington Village Hall Addenbrooke s Treatment Centre Harston Village Hall Thursday 29 November 2018 Wednesday 5 December 2018 Thursday 6 December 2018 17:30-20:00 12:00-14:00 18:00-20:00 75 High Street, Trumpington, Cambridge CB2 9HZ Addenbrooke s Treatment Centre, Keith Day Road, Cambridge, CB2 0SL 20 High Street, Harston, Cambridge, CB22 7PX Greater Cambridge Partnership, SH1317, Shire Hall, Cambridge CB3 0AP Check out our website for further event details: www.greatercambridge.org.uk @greatercambs #GCPP&RConsult facebook.com/greatercam More information including frequently asked questions is available online at www.greatercambridge.gov.uk/parkandride EARLY 2019 Analysis of consultation responses SUMMER 2019 Final option recommendation to GCP Executive Board 2020 Detailed design 2021 Seek relevant powers to construct 2022/23 FOR COMPLETION 2023 Construction If you would like a copy of this leaflet in large print, Braille, audio tape or in another language please call 01223 699906. Please note, timescales are indicative, subject to change and dependent on approvals.