PRESSURE ADJUSTMENT Main pressure adjustment

Similar documents
Operating Instructions Models and Hydrostatic Test Pumps

Bobtail DOT 407 / 412 Vacuum

Installation and commissioning instructions 255 series and 256 series

Linde Hydraulics Corporation, P.O. Box 82, Canfield, Ohio 44406

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE

Vickers. Flow Controls. Flow Controls FN, F(C)G, FRG. Released 6/94

Document How to Set Single Stage Press Pressures

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

MADILL 24.7" 365 TILT SET-UP PROCEDURE WITH REXROTH VALVE ON MACHINE

Advanced Fluid Handling Cart Owner s Manual

Service Call: Procedure for Bleeding the Hydraulic Leveling System. Tools Required: S-Wrench 1/2, 9/16, 5/8, 11/16, & 3/4 Drain Pan

Lesson 6: Flow Control Valves

MANUAL BE SERIES Test Benches

Priority (Swing) Motors Data and Specifications

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Pressure reducing valve, pilot operated

KJ4000 Operating Instructions & Parts Manual NSN

Introduction. Part one: Identify the Hydraulic Trainer Components

2.5 & 5.0 GALLON PRESSURE TANKS

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No

Pressure reducing valve, pilot operated, Model 3DR

Model GP PRESSURE REDUCING VALVE Installation & Operation Manual

Proper Pump Installation Practices

Leak-Free Load-Control Valve SAE ½ psi flange

Warning: NEVER ALTER TEST EQUIPMENT

LNG Regulator Test Kit

Model: 43T. Bermad Pressure Relief Valve

Simplified Digital Hydraulic Testers Operating Manual. Oil Solutions. DHC DHT HP

Operating Instructions Model and Hydrostatic Test Pump

ELECTRONIC PLC SERIES Test Benches

Load Controls Screw In Cartridge Valves Pressures to 350 bar (5000 psi) Flows to 190 l/min (50 USgpm)

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

Code AWC20HP Air Compressor

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

DBML-60/80 Squeeze Tool

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

8-GAL PNEUMATIC OIL DISPENSER

Pilot operated pressure relief valve sandwich plate,type ZDB/Z2DB6 Huade América 1

OWNER S TECHNICAL MANUAL

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

RP series Rotor Pumps

Pressure reducing valve, direct operated

Pressure Limiting Valve SPVF Operating Instructions

Accessories. Valves. Adjustable Pressure Relief Valves

Pressure reducing valve, direct operated, type DR 5 DP Huade América 1

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

Spare parts list ( ) Spare parts list Puzzi 8/1 C *CUL

Maximum 0.85 MPa pressure setting Long-life, high flow perfect for balancer applications

PXRF- Tracer Helium Flow Control System

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

Inverse Prop. Pressure-Relief Cart., Size 2 4

Digital directional & flow control valves D-DF(R)G

200 PSI FAST-FILL AIR SOURCE KIT

200 PSI HIGH-FLOW AIR SOURCE KIT

III. Identify the initial installation requirements for standpipe systems

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

Model Air Caddy Orig TABLE OF CONTENTS

Pressure reducing valve, direct operated, sandwich plate, type ZDR6D...40B/(New Series)

OPERATING INSTRUCTIONS FOR HTWP21 SERIES AIR DRIVEN TORQUE PUMPS

Operating Procedure TITON SUBSEA BOLT TENSIONER

CB 350. Spare parts list. Hydraulic concrete buster. CB 350 s/n DEQ Construction Tools GmbH No

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Instruction sheet for Hydraulic Cylinder

HPB25 Hydraulic Paving Breaker

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Torque Specifications

HYDRAULIC CYLINDER TEST

Accessories. Valves. Adjustable Pressure Relief Valves

SpectraPure PUMPED RO SYSTEMS (PSP) User s Manual for PSP-1500 Systems

The X-11 Molding Chamber

Adjustable. Unloader Valve. O&M Manual. Part #

Contents. Catalog HY /US Load and Motor Control Valves SERIES CAVITY DESCRIPTION FLOW PRESSURE PAGE NO. LPM/GPM BAR/PSI

Proportional Pressure-Relief Cartridge Valve, Size 2...4

BS Series Basket Strainer

JLG Models 1200SJP 1350SJP Service and Maintenance Manual P/N PDF download

BUTTERFLY VALVES. Toll Free (877) - ICFLUID -2-

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Hydrostatic Pressure Testing

ABRASIVE REGULATOR II

Models: C62/63/64-A/D

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

Bulletin 2533-M3/USA Service Bulletin. Series PR25MA, PR25P, PR25S, PR32P, PR32S. Effective: July 1, Pilot Operated Pressure Reducing Valves

Electrically Operated Pressure-Relief Cartridge, Size 10

Operating Instructions Models and Hydrostatic Test Pumps

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

INSTRUCTION MANUAL & PARTS

Nexus. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike SG-3R40 SG-3R45 SG-3R75 SG-3R75-A SG-3R75-B SG-3D55 SG-3C41

TOOL ARMS with AUTOMATIC DOWN FORCE for LEVER-PERMIT AIR DRIVERS OWNER S MANUAL. This manual contains;

Sandwich Valves. 1 Change in flow, temperature or fluid (SSU) rating will affect valve

ABRASIVE REGULATOR II

120 PSI FAST-FILL AIR SOURCE KIT 25% Duty Compressor on 1.5 Gallon Air Tank

TRADITIONAL HIGH VIBRATION HOSE SYSTEM THE STANDARD FOR MANY AUTOMOTIVE APPLICATIONS

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

Electro-hydraulic control valve - Calibrate - Remote valve calibration

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

SC6H OIL-LESS AIR COMPRESSOR

Monoblock Directional Control Valve RMB 202

FOR TM TURRET COMBAT ENGINEER VEHICLE, M728 ( ) TECHNICAL MANUAL

Transcription:

8001-38 PRESSURE ADJUSTMENT Main pressure adjustment Adjustment preparation work Pressure is adjusted with control valves. The following preparations are required for adjusting with control valves. 1. Engine hood opening and closing. Release the engine hood lock lever. 3. Remove the bolts (4), then remove the cover (3). BIO1003-006 2. Open the engine hood. BIO1003-004 1 BIO1003-005

Main relief pressure adjustment Work mode Lever operation SP mode Arm-in relief Oil temperature 45 to 55 C 113 to 131 F Measuring port P1 port Measurement pressure Pressure per rotation of adjusting screw Boosted pressure: 36.8 MPa 368 bar 5337 Psi Standard: 34.3 MPa 343 bar 4975 Psi Boost pressure: 28.4 MPa / rotation 284 bar / rotation 4119 Psi / rotation Standard: 21 MPa / rotation 210 bar / rotation 3046 Psi / rotation 1. Before adjusting, remove the pilot hose (10) for the boosted pressure signal connected to the main relief valve (7), then plug the hose side. The procedures for boosted pressure and standard pressure are different. 2. Boosted pressure A Loosen the standard pressure lock nut (14) (27 mm) and tighten the adjusting screw (13) (27 mm, 1.06 in). Fasten with a spanner (27 mm, 1.06 in) so that the boosted pressure adjusting screw (12) does not turn. B After tightening until the adjusting screw (13) stops turning, tighten the lock nut (14). C Start the engine and run it at maximum rotation. D Move the arm lever to the in side, set the relief state, and hold. E Loosen the boosted pressure lock nut (11) (32 mm, 1.26 in) and adjust the set pressure with the adjusting screw (12) (27 mm, 1.06 in). When lower than the set pressure, tighten. When higher than the set pressure, first lower below the set pressure, then adjust on the tightening side. F After adjustment, fasten the adjusting screw (12) with a spanner (27 mm, 1.06 in), then tighten the lock nut (11). G After locking, check the boosted pressure side pressure. Repeat A) to F) until the set pressure is correctly adjusted. 8001-39 3. Standard pressure H Loosen the standard pressure lock nut (14) (27 mm, 1.06 in). I Loosen the adjusting screw (13), lower below the set pressure, then adjust on the tightening side. J After adjustment, tighten the lock nut (14) while fastening the adjusting screw (13) with a spanner. K After locking, check the pressure. Repeat H), I), and J) until the set pressure is correctly adjusted. L Stop the engine. 11 12 10 13 14 7 RI01001-003

8001-40 Overload relief pressure adjustment 15 Control valve Work mode SP mode 16 Overload relief Oil temperature 45 to 55 C 113 to 131 F Measuring port P1 / P2 port Measurement pressure Pressure per rotation of adjusting screw Boom down: 29.4 MPa 294 bar 4264 Psi Others: 38.7 MPa 387 bar 5613 Psi Boom down: 21.1 MPa / rotation 211 bar / rotation 3060 Psi / rotation Others: 38.7 MPa / rotation 387bar / rotation 5613 Psi / rotation 1. Since the overload relief pressure is set higher than the main relief pressure, it is necessary to provisionally set the main relief pressure higher than the overload relief pressure. (Except for boom down) 17 Boom-up 18 Arm-in 19 Bucket-open 20 Wrench 17 mm 21 Adjusting screw 6 mm 22 Lock nut 17 mm 23 Hexagon wrench 6 mm 15 17 18 16 19 2. Main Relief Pressure Provisional Setting Using the main pressure adjustment procedure for reference, temporarily set the boosted pressure and standard pressure to at least 38.7 MPa. 20 NOTE: For boom down, since the overload set pressure is lower than the main relief set pressure, there is no need to temporarily set the main relief pressure. 3. Pressure adjustment NOTE: For the position of each overload relief, see the "Control Valve Relief Locations". Example: Arm-in overload relief adjustment A Loosen the lock nut (22) and adjust by the turning the adjusting screw (21). When lower than the set pressure, tighten. When higher than the set pressure, first loosen to a pressure lower than the set pressure, then adjust on the tightening side. B After adjustment, lock the lock nut (22). C After adjusting the overload relief pressure, adjust the boosted pressure and standard pressure to their normal values referencing the main pressure adjustment procedure. 22 21 23 RST-09-01-001AM

Swing relief pressure adjustment Work mode SP mode Oil temperature 45 to 55 C 113 to 131 F Measuring port P1 port Measurement pressure Pressure per rotation of adjusting screw 29.4 MPa 294 bar 4264 Psi 4.8 MPa 48 bar 696 psi 1. Using the swing pressure measurement procedure for reference, lock the swing, and check the swing pressure. Pilot pressure adjustment Lever operation Neutral Measuring port P3 Set pressure 3.9 MPa 39 bar 565.6 Psi 8001-41 1) Pressure measurement a) Install the pressure gauge. b) While holding the plug with a wrench (24 mm 0.94 in), adjust with a hexagon wrench (6 mm 0.24 in). 29 28 27 RST-09-01-001AP BIO1003-007 2. Loosen the lock nut and adjust by the turning the adjusting screw. When lower than the set pressure,tighten. When higher than the set pressure, first loosen to a pressure lower than the set pressure, the adjust on the tightening side. 3. After adjustment, lock the lock nut. BIO1003-008

8001-42 HYDRAULIC PUMP FLOW MEASUREMENT PROCEDURE Work preparations 1. Check that the main unit is in its work posture (armvertical). 5. Install the vacuum pump (4) on the hydraulic oil tank lid (3). 6. After setting the vacuum pump (4), switch on the power. (If the cable is too short, use an extension cable.) 4 RST-09-02-001B 2. Bleed out the pressure. (See the details on Bleeding Pressure in the Pressure Measurement and Adjustment Procedures.) NOTE: Check the swing stop. 3. Use a spanner (17 mm, 0.67 in) to remove the feed port cover (2). RST-09-02-001F 7. Use a hexagon wrench (8 mm, 0.31 in) to remove the split flange and hydraulic hose. (This explanation uses flow measurement at the P2 pump.) 2 6 7 8 RST-09-02-001C 4. Use the bolts removed in step 3 to install the hydraulic oil tank lid (3). 3 RST-09-02-001G RST-09-02-001D

8. Use the split flange to install the adaptor (flange type) on the tip of the hydraulic hose removed in step 7. 9. Install the adaptor at the position from which the hydraulic hose was removed. 10. When the parts are set as in the figure above, remove the plug. 11. Use the spanner to connect the adaptor installed on the pump in step 9. 12. If necessary, install an "elbow adaptor" on the (prepared) hydraulic hose connected to the flow meter IN side. 13. Install the hydraulic hose on the flow meter IN side, then fasten with the spanner. 8001-43 14. Install the (prepared) hydraulic hose on the flow meter OUT side, then fasten with the spanner. When connecting, always check the connection positions. Always have the metering valve fully open. 15. Install pressure gauges on P1 and P2. (See "Main Pressure Measurement".) 16. Remove the vacuum pump and re-install the hydraulic oil tank the same way it was. 17. Open the engine hood. (See "Main Pressure Adjustment".) 18. Remove the cover. 19. Remove the pilot hose for the boosted pressure signal, then plug the hose side. (See "Main Relief Pressure Adjustment".) 9 10 15 11 12 13 14 17 16 RST-09-02-001H 9 Elbow adaptor 14 Hydraulic hose (OUT) 10 Adapter 15 Hydraulic hose 11 Hydraulic hose (IN) 16 Split flange 12 Flow meter 17 Adapter (flange type) 13 Metering valve

8001-44 Flow measurement 1. When measuring the flow, position the workers as in the figure below. Worker 1: Work supervisor, pressure adjustment Worker 2: Operator Worker 3: Flow, pressure measurement, recording 3 1 RST-09-02-001I 2. At the signal from the work supervisor, the operator starts the engine. 2 3. Check the hydraulic oil temperature on the monitor (50 C, 122 F). Check that the engine rotation and pump current are normal. 4. The operator signals the arm-out relief operation to worker 1. 5. Worker 2 lowers the arm-out port relief. (Min: 24 MPa (240 bar, 3481 Psi) (P1 + P2) 6. Start of flow measurement. 7. The arm-out relief operation is carried out. 8. Data measured in units of 2.0 MPa (20 bar, 290Psi) (P1 + P2). The measurement is carried out from 24.0 to 76.0 MPa (240 to 760 bar, 3481 to 11023 Psi) and ends when the maximum pressure is reached. 9. Remove the flow meters. Because from 40 MPa (400 bar, 5802 Psi) the pressure exceeds the permitted value for the flow meter pressure gauge maximum pressure. 10. Reset the arm-in port relief valve to normal pressure. (For details on this adjustment, see "PRES- SURE ADJUSTMENT".) 11. Remove the pressure gauges etc. and put everything back to normal. RST-09-02-001J

250 L/min 66.04 gpm 200 L/min 52.83 gpm 150 L/min 39.63 gpm 100 L/min 26.42 gpm 50 L/min 13.20 gpm 0 Q (0) (100) (200) (300) (400) (500) (600) (700) 74.8 MPa 10849 Psi 748 bar 0 10 20 30 40 50 60 70 [MPa] 0 100 200 300 400 500 600 700 [bar] 77 L 20.34 gal [kgf/cm 2 ] Flow curve 8001-45 0 1450 2901 4351 5801 7252 8702 10153 [Psi] Discharge pressure P Discharge flow Q BCO1003-001

8001-46 DRAIN VOLUME MEASUREMENT PROCEDURE Preparations Measuring conditions Mode SP mode Oil temperature About 50 C About 122 F WARNING: The drain volume varies greatly with the oil temperature. Travel motor drain volume measurement 1. Ground the arm as in the figure below, then make the shoe crawler on one side float. 3. Always lay a rag (2) underneath before removing the drain hose (5). 4. Use a spanner to remove the drain hose (5). (Always install a cap on the drain hose.) RST-09-03-001A 2. Remove the bolts (4), then remove the cover (3). 3 5 2 RST-09-03-001C 5. Install the extension hose (6) for measurement on the side of the motor from which the drain hose was removed. 4 RST-09-03-001B 6 RST-09-03-001D