Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Similar documents
Neighborhood Pedestrian Safety and Traffic Calming Study

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Hennepin County Pedestrian Plan Public Comment Report

NY Route 5 Comprehensive Pedestrian Safety Study: A Corridor Perspective CDTC Planning Committee. January 7, 2015

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Pedestrian Project List and Prioritization

North Avenue Corridor Study

Edgewater Drive & Vassar Street Area Traffic Study

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Military Road Safety Improvements

Walk Friendly Communities Engineering Strategies. Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015

Pedestrian Safety Guide for Transit Agencies

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Retrofitting Urban Arterials into Complete Streets

5. RUNNINGWAY GUIDELINES

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Tonight is for you. Learn everything you can. Share all your ideas.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

City of Moorhead Committee of the Whole Meeting

Complete Streets. Designing Streets for Everyone. Sarnia

Welcome to the Quebec Alternatives Analysis Public Meeting

C Line Rapid Bus Preliminary Station Design

Route 7 Corridor Study

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

Governance and Priorities Committee Report For the July 2, 2015 Meeting

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Designing for Pedestrian Safety in Washington, DC

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Improving intersections for people that walk in Minneapolis

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

CTDOT Pedestrian and Bicycle Safety Initiatives

Zlatko Krstulich, P.Eng. City of O9awa

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Road Diets A Proven Safety Countermeasure

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Appendix A: Crosswalk Policy

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

Major Bike Routes 102 Avenue Workshop April 21, 2015

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

Frequently Asked Questions

Citywide Sidewalk and Crosswalk Programs

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Pennsylvania Avenue (CR 484) Design Alternatives Study

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Glenn Avenue Corridor Traffic Operational Evaluation

122 Avenue: 107 Street to Fort Road

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Road Diets FDOT Process

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Vision Zero & ITE. April 11, Toole Design Group. Jason DeGray, P.E., PTOE. Vision Zero & ITE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Pedestrian Road Safety Audit

Maywood Town Hall Meeting. May 4, 2016

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

PEABODY SQUARE RECONSTRUCTION PROJECT

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

PROJECT FACT SHEET March 21, 2018

Ottawa Beach Road Study

Polk Streetscape Project

Designing for Pedestrian Safety

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Cycle Track Design Best Practices Cycle Track Sections

ADA Training Standard Plans

Pedestrian & Bicycle Safety Innovations & Applications

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

10.0 CURB EXTENSIONS GUIDELINE

North Avenue Corridor Study

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Transcription:

Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018

Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations Key Recommendations: Corridor Signal Timing Physical Intersection Changes: Welch Avenue Stanton Avenue Wrap up/discussion

Study Limits

Corridor Study Work Plan - Purpose Are there Safety/Operations Concerns? Do Current Physical Features/ Conditions Contribute? If Yes, Are there Options to Address: Adding Time to Travel Negative Supports More Global Efforts: Long Range Transportation Plan Transit Redesign Complete Streets Policy Development/ Application

Study Summary Phase 1 Discovery Strategies/ Screening Phase 2 Recommendations NO Design Deficiencies NO Sight Distance Issues Pedestrian Signal Compliance - Issue Throughout Corridor Welch Avenue: Elevated Severity Veh-Ped Crashes Stanton Avenue: Elevated Crash Rate (Veh-Veh) Ped Volume Unmarked Crosswalk Sheldon Avenue: Elevated Crash Rate (Veh-Veh) Education Geometric Changes Timing/Operations Changes Effectiveness Safety Compliance Operations Access Support Cost Small Steps: Update Signal Timing Welch LPI Stanton Xwalk Larger Steps: Welch Median Changes Median Barrier at Stanton Engagement - Outreach Survey Working Group Administration Briefings Public Meeting

Composite Ped Compliance and Mid-Block Compliance Peak Pedestrian Hour

Composite Ped Compliance and Mid-Block Compliance Peak Vehicle Hour

Countermeasures to Address Concerns Vehicle-Ped Conflicts Crash Rate/ Severity Pedestrian Crossing Compliance Mid-Block Crossings Themes: Sensitive to Time Complement Travel Pattern Reduce Conflict Points: Spatial Changes Temporal Changes Strategies: Change Signal Operations: Improve Efficiency Separate Pedestrians - Vehicles Construction Education Replace Equipment

Traffic Operations Recommendations Update Corridor Signal Timing: Reflect Current Traffic Provide Recommendations for Monitoring and Updating Implement Leading Pedestrian Intervals (LPI): Peds get WALK Before Vehicles get Green Pedestrians Establish Position ahead of Turning Traffic) Length - Allow pedestrian to Cross ONE Lane of Traffic Start with Welch Avenue See Benefit, Implement at Others (3) How Long Is Your LPI?, ITE Journal, December 2017

Welch Avenue Welch Avenue Remove Raised Median Eliminate ~ 90 Feet of Median East and West Sides Relocate Median Width between Inside Through Lane and Left Turn Lane Improve Compliance ~ 18 Percent Lincoln Way

Stanton Avenue Lincoln Way at Stanton Avenue Recommendation Barrier Needed to Reduce Pedestrian Activity Barrier is Intrusive Barrier is Expensive Improve the Current Condition: Add Painted Crosswalk Visibility Make ADA Compliant Reduce Curb Radii (Secondary) Lincoln Way

Welch and Stanton Avenues Recommendation All Ideas Can be Transferred to Other Locations in the Corridor Consider in Future if: Effective Accepted

Traffic Recommendations Update Signal Timing Update Intersection and Corridor Signal Timing: Reflect Current Traffic Provide Recommendations for Monitoring and Updating Benefits: 20-23% VEHICLE DELAY 10-23% PEDESTRIAN DELAY 18% VEHICLE STOPS Up to 15% CORRIDOR TRAVEL TIME No Change SEGMENT SPEED 59% VEHICLE-PED CRASHES 64% SEVERE CRASHES

All Recommendations Update Intersection and Corridor Signal Timing: Welch Avenue Left Turn Median Removal Stanton Marked Crosswalk Benefits: 20-23% VEHICLE DELAY 10-23% PEDESTRIAN DELAY 18% VEHICLE STOPS 18% PEDESTRIAN COMPLIANCE Up to 15% CORRIDOR TRAVEL TIME No Change SEGMENT SPEED 59% VEHICLE-PED CRASHES 64% SEVERE CRASHES

Preliminary Cost Estimates Location D e scription Low Cost Hi gh Cost Welch Avenue Remove concrete median Reconstruct concrete median nose Repave Repaint crosswalk Restripe turn lane $8,500 $10,000 Stanton Avenue Cross Walk Remove concrete median Repave Patch median curb Repaint crosswalk Curb ramps Curbline modifications $12,000 $15,000 Stanton Avenue Median Closure/ Barrier Remove concrete median Remove base material Add soil Patch median curb landscaping Black picket-style fence in median $100,000 $125,000 Corridor Retiming Implement signal cycle length, phasing plan and offset recommendations from study. Minimal Staff time only. Plans from study readily implementable

Wrap Up Final Questions/Discussion Follow-up?