MCCAW REACH RESTORATION

Similar documents
Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Sub-watershed Summaries

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Snake River Salmon Recovery Board Lead Entity 2016 SRFB Grant Round. Project Tour June 1-3, 2016

South Fork Chehalis Watershed Culvert Assessment

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

STEELHEAD SURVEYS IN OMAK CREEK

COA-F17-F-1343 YEAR END REPORT

Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round. Project Tour May 31 st and June 1 st

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

The Blue Heron Slough Conservation Bank

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Snake River Salmon Recovery Board Lead Entity 2018 SRFB Grant Round. Project Tour June 5 th 7 th

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

Tuolumne River Gravel Introduction

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

LIFE HISTORY DIVERSITY AND RESILIENCE

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Riparian Planting Projects Completed within Asotin Creek Watershed. Final Report

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design

September 27, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky. Update on Geographic Review

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

The Salmonid Species. The Salmonid Species. Definitions of Salmonid Clans. The Salmonid Species

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

2012 Bring Back the Natives Awarded Projects

Advisory Visit. Bradshaw Brook, Lancashire. August 2010

Interim Guidance Fish Presence Absence

East Kitsap Peninsula WRIA 15 Salmon Habitat Restoration Strategy Summary

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

The Restoration of Jimmycomelately Creek

The Calawah River System

Deschutes WRIA 13 Salmon Habitat Recovery Committee SRFB / PSAR Letter of Intent Form

Coho Salmon 1. COMMON NAMES: Silver salmon, Coho, blue back, silversides, and jack salmon.

HARRY AND LAURA NOHR CHAPTER OF TROUT UNLIMITED

Stevens Creek Corridor

October 25, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky, Program Development Manager. Update on Geographic Review

Report prepared for: Prepared by: January 2002 BEAK Ref

Newaukum Watershed Culvert Assessment

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered

Okanagan Sockeye Reintroduction

Ned Currence, Nooksack Indian Tribe

Dry Creek Project. The Dry Creek Habitat Enhancement Project provides a. Slowing velocity, creating refuge are key to habitat project

BULL TROUT OPERATIONAL PLAN

Identifying Areas with Potential to Contain High Value Fish Habitat (HVFH) June 2007

HABITAT ADVISORY VISIT TO THE RIVER ITCHEN, CHERITON BISHOP, HAMPSHIRE.

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

TREATING RIVERS RIGHT & EXAMPLES OF BEST USE OF WOOD IN RESTORATION

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

River Medway Upper Medway Fly Fishers

Environmental Review and Permitting for Wild Trout

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

Climate Change Adaptation and Stream Restoration. Jack Williams;

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

ENTIAT WATERSHED ANNUAL REPORT ENTIAT RIVER APPRECIATION A COMMUNITY CLEAN UP EVENT. Vol. II: 2012 INSIDE

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Salmon Biology Station

Salmon Recovery Planning in Washington

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Little Kern Golden Trout Status:

Delaware Basin Stream Management Program

Don Pedro Project Relicensing

Western native Trout Status report

Attachment 1. Agenda Item Summary BACKGROUND

Conserving the Forests, Lakes and Streams of Northeast Michigan

Know Your River - River Ogmore Salmon and Sea Trout Catchment Summary

August 11 Snorkel SCC side channel network (SBA, SCC3) feet 707

Klickitat County Shoreline Master Program Update. Open House March 15, 2017

Trout Buffer Variance

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO.

Proposed Shuswap River Boating Regulations Open House

THE GREAT SALMON RECOVERY HOAX. Having faithfully attended the Salmon Recovery Forum meetings for over a

Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

Anadromous Fish Committee Columbia Basin Fish and Wildlife Authority Project Implementation Review Conference

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

Drafted by JWN Approved by Steering Committee ( ) Technical description of basins is subject to change

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

Yakima/Klickitat Fisheries Project

Follow this and additional works at:

California Steelhead: Management, Monitoring and Recovery Efforts

Nechako white sturgeon are an Endangered Species

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

California Steelhead: Management, Monitoring and Recovery Efforts

Habitat Advisory visit to the River Fergus system Co.Clare, Eire. Undertaken on behalf of Ennis and District Anglers Association, by Vaughan Lewis,

P.O. Box 65 Hancock, Michigan USA fax

Transcription:

Final Report MCCAW REACH FISH RESTORATION PHASE B Jack McCaw Inland Empire Action Coalition http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District Snake River Salmon Recovery Board Washington State Conservation Commission Walla Walla County Conservation District WWCCD 325 North 13th Street Walla Walla, WA 99362

MCCAW REACH FISH RESTORATION PHASE B 2015-2018 Summary The McCaw Reach Fish Restoration Phase B project restored fish habitat to a section of the Touchet River east of Waitsburg, WA. It is the third phase of two other completed projects in this reach of the Touchet River. It provides Mid-Columbia steelhead rearing habitat, bull trout habitat, as well as non-listed Chinook passage and holding habitat. This project improved overall river channel complexity by increasing bar development, pool establishment, and overall stream length. Conservation Goals Added habitat for three species of fish: Steelhead, Bull Trout, and Chinook Salmon Restoring floodplain connectivity and function, as well as increasing stream length and sinuosity.

The Conservation Problem In 1996 a flood event scoured rivers, removed woody debris and instream structures from the Touchet River and worsened a series of erosion processes that continue to this day on the river downstream of Waitsburg, Washington. After the 1996 flood event, the Dozier and McCaw landowners expressed concerns over loss of land, river migration, encroachment and flooding. They contacted WDFW and eventually the Walla Walla County Conservation District for assistance. Westernmost oxbow bank erosion. Looking downstream spring of 2016. When construction began in 2018, the site was characterized by an over-straightened channel with minimal roughness and complexity. Severe erosion of the south bank was causing the river to cut into the adjacent agricultural field. The river in this reach was a single shallow channel that was over-widened with few pools, few cover or resting areas, and with a minimal potential to recruit or hold large wood. The result was poor salmonid habitat and significant loss of productive farmland. Westernmost oxbow bank erosion. Looking upstream spring of 2016.

About The Project Location This project is within the Snake River Region, located on the main stem of the Touchet River. The project addresses a major spawning area and priority area for restoration, as identified in the Snake River Salmon Recovery Plan. The Phase B project begins at River Mile 40.4 and continues upstream to River Mile 41.5. Scope of Work The on-site engineer directed installation of all components. The existing channel was reduced in complexity and roughness, had degraded riparian vegetation and was seriously incised in some areas. The project placed large wood features in the main channel and side channels to encourage the activation of side channels, improve overall channel complexity, increase bar deposition and stream length, and develop pools. The Walla Walla County Conservation District was responsible for permitting, construction management, change orders, re-vegetation, and bill processing. Project partners Partner funding was through Recreation and Conservation Office and Washington Conservation Commission. The Regional Technical Team Design Review Team was instrumental in contributing to the design approach of the project. The landowner donated consultation time, idled some farm ground for storing and staging, and contributed materials toward the project. Washington Conservation Corps assisted in harvesting and planting willow whips. Discussion Engineer, machine operator, and workers discuss limitations of anchoring LWD structures into bedrock.

Habitat Factors Addressed Large Woody Debris Installation of 200 log/rootwad stems over the length of the project provide habitat for Steelhead, Bull Trout, and Chinook Salmon. Channel Confinement Connects side channels and floodplain; some of the side channel will be active 12 months of the year and some will be active only during high flows. Temperature Helped reduce water temperature by developing pools, offering localized shade from the woody debris, and accessing the floodplain with activation of the side-channels. Previously damaged/destroyed riparian buffers are undergoing replanting in 2018/2019. These new and existing riparian plantings will continue to grow and shade the river. Reshaping the high-water channel. Methods Engineered Log Jams (ELJ) & Large Woody Debris (LWD) One Box ELJ and two Bank ELJs were built in the Phase B project. These structures are different in form but similar in function as they all are intended to mimic a log jam. These structures are intended to collect and shed woody materials that are moving within the system. Some structures like the Box ELJ helps form channels and promote side channel flow, while others are more suited to provide pool habitat, high flow refuge, escapement cover, and promote local deposition. Channel Spanning Structure The Channel Spanning Structure extends the full width of the site s side channel and helps divert water away from the side channel during low flow periods, but allows water to enter during a high flow period. Multi-log LWD along the main channel. Bank Reshapement and Stabilization The sharply eroded bank (pictured previous page) now forms a less severe 45 degree angle and is reinforced with 10 log jam structures topped with gravel. Along this bank as well as the bank of the main channel, willow whip plantings may further retain sediment as well as grow and shade the river.

Completed Bank ELJ. Completed Multi-log LWD before replanting. Looking downstream: Pictured left is the Channel Spanning Structure, to the right is the main channel and Multi-log LWD. Gravel delivery and bank reshapement.

Structures 1 Multi-Log LWD 49+ logs 60 tons anchor rock 1 Channel Spanning 150 53+ logs 90 tons anchor rock Project Cost $289,500 Project partners Funding through the Washington RCO-Salmon Recovery Funding Board, and Washington State Conservation Commission 2 Bank LWD 14 logs 8.5 tons anchor rock 2 Bank ELJ 24 logs 1 Box ELJ 14 logs 30 tons anchor rock 10 Barb LWD 50 logs 87 tons anchor rock 6 Tri-structures 28 logs 20 tons anchor rock Funding and Partnerships: Snake River Salmon Recovery Board, Washington State Conservation Commission, and Landowner Jack McCaw Support From: Confederated Tribes of the Umatilla Indian Reservation(CTUIR) Washington Department of Fish and Wilflife(WDFW) http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District WWCCD 325 North 13th Street Walla Walla, WA 99362