RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Similar documents
Metropolitan Council Transportation Committee

W Seattle Bridge / Duwamish Corridor

Welcome to the Quebec Alternatives Analysis Public Meeting

Seattle Bicycle Master Plan

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

North Coast Corridor:

Hennepin/First Transportation Study

Seattle Transit Master Plan

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

Technical Working Group November 15, 2017

City of Seattle Edward B. Murray, Mayor

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Bellevue Downtown Association Downtown Bike Series

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Community Task Force July 25, 2017

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Aurora Corridor to E Line

South King County High-Capacity Transit Corridor Study

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Bus Rapid Transit Plans

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Better Market Street Project Update. Urban Forestry Council September 17, 2014

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Arterial Transitway Corridors Study. Ave

Community Task Force November 15, 2017

Major Bike Routes 102 Avenue Workshop April 21, 2015

Sixth Line Development - Transit Facilities Plan

ACTION TRANSMITTAL No

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

42nd Ave N Reconstruction

North Avenue Corridor Study

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

5. RUNNINGWAY GUIDELINES

Greater Cleveland Regional Transit Authority

Appendix A-2: Screen 1 Alternatives Report

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Preliminary Transportation Analysis

Project Description Form 8EE

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Castro Valley Municipal Advisory Council March 19, 2018

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Citywide Sidewalk and Crosswalk Programs

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

North Shore Transportation Improvement Strategy

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Highway Transitway Corridor Study

Giles Run Connector Road

San Jose Transportation Policy

Interim Transit Ridership Forecast Results Technical Memorandum

TABLE OF CONTENTS. Executive Summary

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017


City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Welcome. If you have any questions or comments on the project, please contact:

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Foothill Expressway Improvements Between El Monte and San Antonio

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Advisory Group Meeting #5. Potential Near-Term Mobility Strategies January 26, Ruth Fisher Board Room, Union Station. 6:00-8:00 pm.

Thank you for attending

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

Complete Streets in Constrained Corridors: Chicago s Central Loop BRT

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

TRAFFIC IMPACT ANALYSIS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Terwillegar Drive Expressway Draft Concept Plan

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

Environment and Public Works Committee Presentation

Route 79/Davol Street Corridor Study

Polk Streetscape Project

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

102 Avenue Corridor Review

Transportation Master Plan Advisory Task Force

BIKE PLAN CONTENTS GATEWAY

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Public Event 1 Community Workshops

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Durham Region Long Term Transit Strategy

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

North Avenue Corridor Study

Transcription:

RapidRide Roosevelt Seattle Bicycle Advisory Board 1

Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products Committed to 5 core values to create a city that is: Safe Interconnected Affordable Vibrant Innovative For all 2

Presentation overview 1. RapidRide Roosevelt purpose and need 2. Project background and status 3. Bicycle facilities evaluation 4. Next steps 3

Your feedback requested Provide feedback on the criteria and methodology used to evaluate bicycle facilities on Eastlake Ave E 4

Project purpose The purpose of the RapidRide Roosevelt project is to improve transit travel times, reliability, and capacity to increase high-frequency, all-day transit service and enhance transit connections between Downtown Seattle and the Belltown, South Lake Union, Eastlake, University District, and Roosevelt neighborhoods, in order to: Address current and future mobility needs for residents, workers, and students Address capacity constraints in the transportation network along this north-south corridor Provide equitable transportation access to major institutions, employers, and neighborhoods Improve pedestrian and bicycle connections and access to RapidRide stops and improve safety along the corridor. 5

Project needs The Roosevelt corridor has been identified as a high-priority corridor for meeting the following transportation and community needs: Provide transit service to support housing and employment growth Provide neighborhood connections to future Link light rail stations Improve transit travel time and reliability throughout the corridor Reduce overcrowding of existing bus capacity Improve pedestrian and bicycle safety and connections to transit 6

Project overview Project highlights: 26 new RapidRide stations 30 intersections with upgraded traffic signals and TSP 4 transit queue jumps 1.9 miles of new transit lanes 3.4 miles of new OCS infrastructure 2.9 miles of new paving 5.2 miles of new protected bicycle lanes 200+ new ADA-compliant curb ramps and other pedestrian improvements 7

Zooming in: Fairview; Eastlake Improved transit stations along corridor Transit-only lane for buses and the streetcar on Fairview Ave to Aloha St Widened corridor Protected bike lanes on Eastlake Ave E to the University Bridge 8

Project history public involvement Phase 1: Mode Analysis and Existing Conditions (November 2014 - June 2015) Phase 2: Characteristics of BRT and Multimodal Components (June 2015 - March 2016) Phase 3: Recommended Corridor Concept (May 2016 Present) Completed conceptual engineering and submitted a Locally Preferred Alternative for Council approval in summer 2017 Began preliminary engineering and prepared submittal for FTA Small Starts grant Completed NEPA scoping in January 2018 9

Bicycle facility analysis During the public scoping period, SDOT received several comments about PBLs on Eastlake, including support for and against and concern about parking loss We decided to complete a more detailed evaluation of bicycle facility options in the Eastlake neighborhood as part of the RapidRide Roosevelt preliminary engineering effort Our analysis evaluates bicycle facility options in the Eastlake neighborhood as part of the SDOT RapidRide Roosevelt project related to the purpose and needs of the project 10

Bicycle facility analysis study area 11

Bicycle facility analysis existing conditions Safety data From 2012-2017, 40 reported bicycle collisions in study area 39 of those incidents were on Eastlake Ave E Most were front-end angle collisions between cars and bicycles 12

Bicycle facility analysis daily volumes Over 120 bicycles/hour during peak hour 13

Bicycle facility analysis options development Attributes considered: Must provide a continuous connection between the University Bridge and Fairview Ave N bridge bicycle facilities Should attempt to connect to the existing bicycle lanes on Eastlake Ave E south of Fairview Ave Should be composed of the AAA bicycle facility types outlined in the BMP: PBLs Off-street/multi-use trails Neighborhood greenways Should attempt to balance the needs of other modes, including maintaining on-street parking where possible. 14

Bicycle facility analysis options considered Option 1: No Build Option 6: Multi-Use Trail on Fairview Ave E Option 2: Protected Bicycle Lanes on Eastlake Ave E Option 3: Two-Way Protected Bicycle Lanes on Eastlake Ave E Option 4: Northbound PBL on Eastlake Ave E and Southbound Greenway on Yale Ave E Option 7: Greenway on Fairview Ave E (following the Cheshiahud Lake Union Loop) Option 8: Greenway on Minor Ave E and Fairview Ave E Option 9: Greenway on Franklin Ave E Option 5: Northbound PBL on Eastlake Ave E and Southbound PBL on Yale Ave E 15

Bicycle facility analysis Evaluation process 16

Bicycle facility analysis Initial screening criteria Meets project purpose and need Provides a level bicycle route Meets SDOT s bicycle facility design standards Able to be constructed within existing right-of-way 17

Bicycle facility analysis Initial screening results Criterion Option 1 Option 2 Option 3 Option 4 Option 5 Option 6 Option 7 Option 8 Option 9 Meets the project purpose and need Provides a level bicycle route Meets SDOT s bicycle facility design standards Able to be constructed within available existing right-ofway Result Fail Pass Pass Pass Pass Fail Fail Fail Pass Not applicable Pass Pass Pass Pass Pass Fail Fail Fail Not applicable Pass Pass Pass Pass Pass Fail Fail Pass Pass Pass Pass Pass Pass Fail Pass Pass Pass Advanced for comparison Advanced Advanced Advanced Advanced Not advanced Not advanced Not advanced Not advanced 18

Bicycle facility analysis Option 2: PBL on Eastlake Ave E Adds PBLs on each side of Eastlake Ave E within the study area Matches the LPA and one of the Seattle BMP s recommendations for bicycle facilities in the study area to complete the citywide bicycle network On-street parking would be removed from both sides of Eastlake Ave E between Harvard Ave E and E Blaine St 19

Bicycle facility analysis Option 3: Two-way PBL on Eastlake Ave E Adds a two-way PBL facility on the west side of Eastlake Ave E within the study area On-street parking would be removed from both sides of Eastlake Ave E between Harvard Ave E and E Blaine St 20

Bicycle facility analysis Option 4: NB PBL on Eastlake; NGW on Yale Adds a NB PBL on Eastlake Ave E and a SB greenway on Yale Ave E between E Roanoke St and E Howe St Adds PBLs on both sides of Eastlake Ave E north of E Roanoke St and south of E Howe St On-street parking would be removed from both sides of Eastlake Ave E from Harvard Ave E to E Roanoke St and from E Howe St to E Blaine St On-street parking would be removed from the east side of Eastlake Ave E from E Roanoke St to E Howe St 21

Bicycle facility analysis Option 5: NB PBL on Eastlake; SB PBL on Yale Adds a NB PBL on Eastlake Ave E and a SB PBL on Yale Ave E between E Roanoke St and E Howe St Adds PBLs on both sides of Eastlake Ave E north of E Roanoke St and south of E Howe St On-street parking would be removed from both sides of Eastlake Ave E from Harvard Ave E to E Roanoke St and from E Howe St to E Blaine St On-street parking would be removed from the west side of Yale Ave E/Yale Place E and the east side of Eastlake Ave E from E Roanoke St to E Howe St 22

Bicycle facility analysis Detailed assessment Degree to which each option improves bicycle safety and bicycle connections to transit Degree to which each option is consistent with City of Seattle policy guidance Bicycle route conditions Impacts to other transportation modes and elements Degree to which each option provides neighborhood access 23

Bicycle facility analysis Detailed assessment results Criterion Option 2 PBLs on Eastlake Ave E Option 3 Two-Way PBL on Eastlake Ave E Option 4 NB PBL on Eastlake; NGW on Yale Option 5 NB PBL on Eastlake; SB PBL on Yale Bicycle safety and connection to transit Route safety High Medium Low Medium Bicycle connection to transit High High High High City of Seattle policy guidance Consistency with Bicycle Master Plan High High Medium Medium 24

Bicycle facility analysis Detailed assessment results Criterion Option 2 PBLs on Eastlake Ave E Option 3 Two-Way PBL on Eastlake Ave E Option 4 NB PBL on Eastlake; NGW on Yale Option 5 NB PBL on Eastlake; SB PBL on Yale Route conditions Route distance 1.42 miles NB/SB 1.42 miles NB/SB 1.42 miles NB 1.51 miles SB 1.42 miles NB 1.51 miles SB Elevation gain +49 feet NB +36 feet SB +49 feet NB +36 feet SB +49 feet NB +33 feet SB +49 feet NB +33 feet SB Maximum uphill slope 5% max uphill 5% max uphill 6% max uphill 6% max uphill Route legibility and directness Number of arterial crossings required 1 turn NB 1 turn SB 1 turn NB 1 turn SB 1 turn NB 4 turns SB 1 turn NB 4 turns SB 1 crossing NB 1 crossing NB 1 crossing NB 1 crossing NB 25

Bicycle facility analysis Detailed assessment results Criterion Option 2 PBLs on Eastlake Ave E Impacts to other transportation modes and elements Option 3 Two-Way PBL on Eastlake Ave E Option 4 NB PBL on Eastlake; NGW on Yale Option 5 NB PBL on Eastlake; SB PBL on Yale Transit performance Minimizes interactions over full corridor Minimizes interactions over full corridor Minimizes interactions over partial corridor Minimizes interactions over partial corridor Auto traffic performance Minimizes interactions over full corridor Minimizes interactions over full corridor Minimizes interactions over partial corridor Minimizes interactions over partial corridor On-street parking 325 spaces removed on Eastlake Ave E 325 spaces removed on Eastlake Ave E 250 spaces removed on Eastlake Ave E 375 total spaces removed (250 on Eastlake) Planted medians Does not require removal of medians Requires removal of all medians Does not require removal of medians Does not require removal of medians 26

Bicycle facility analysis Detailed assessment results Criterion Option 2 PBLs on Eastlake Ave E Option 3 Two-Way PBL on Eastlake Ave E Option 4 NB PBL on Eastlake; NGW on Yale Option 5 NB PBL on Eastlake; SB PBL on Yale Neighborhood Access Access to businesses Direct bicycle access in both directions Direct bicycle access in both directions Direct bicycle access in NB direction Direct bicycle access in NB direction Access to schools Direct access to TOPS in both directions Direct access to TOPS in both directions Direct access to TOPS in both directions Direct access to TOPS in both directions TOTAL SCORES High 11 9 5 5 Medium 2 3 8 8 Low 1 2 1 1 27

Next steps Fall 2018: Continued coordination with Levy Oversight Committee Fall 2018: Outreach in Eastlake community on bicycle facility option development and curbspace management in the corridor 2019: Draft Environmental Assessment 28

Discussion As a bicycle advocate, did we identify the right criteria to evaluate bicycle facilities in the Eastlake corridor? Do you have other comments on the results of the analysis? 29

Questions? Garth Merrill RapidRide@seattle.gov www.seattle.gov/transporation/rapidrideroosevelt 30