GOLDEN SAFETY RULES AFT DR

Similar documents
Safety at Work. Rules for Staying Alive

We also ask our subcontractors and partners to. At EHS Support we re passionate about safety. The. ensure the safey of themselves, their coworkers and

Our commitment to safety

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

A MESSAGE FROM THE MD

Contractor OHS Induction. AOHS-05-GUI September 2016

ISS Safety Rules. Make safety second nature

Contractor handbook. Purpose

Safety is a priority at Vault Pipelines.

SASOL LIFE SAVING RULES (LSRs)

Application 15.1 This Part applies to every workplace where a worker works in a confined space.

OGP Supplementary Life-Saving Rules

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

We live by the Life Saving Rules so that everyone goes home safe, every day.

LIFE SAVING RULES EXPLANATION GUIDE EDITION #1.0

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Safe work method statements

Policy Redesign Project. Plant Safety Policy. Table of Contents

Safety Essentials. Mandatory rules for our high risk activities

Contractor/Visitor Safety Orientation UNBC

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

FATAL AND SEVERE RISK PROGRAM

LADDERS FIXED AND PORTABLE

2.0 Management Systems and Documentation

Work Activity (e.g. Road Work): Work Location:.

TLILIC2001 Licence to Operate a Forklift Truck

HAZARD MANAGEMENT PROCEDURE

B S Glass Ltd Safety procedures- outsourced Workplaces

Based on market capitalization (in U.S. dollars) at December 31, 2015.

Confined Space Entry Considerations April 2016

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

SafeLandUSA - Syllabus

Temporary load-bearing support for structural alterations or repairs

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Safe Work Method Statement (SWMS)

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

GOLDEN TOTAL S RULES. total.com

Lenzing Life Saving Rules

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Minimum Safety Requirements for Contractors Working on Railway Property

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

SAFE WORK METHOD STATEMENT SWMS No Version

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Prevention of Falls and Working at Heights

Contractor Code of Conduct

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

Level 3 Award in Emergency Rescue and Recovery Of Casualties from Confined Spaces

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Confined Space in Construction

Safe Work Method Statement

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

Responsibilities / Accountability

Hazard Assessment Policy

UETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE

PRO Lifting Operations

Buggy Policy Document Date: 10 November 2017

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

List all key terms and acronyms used in the procedure, and their definitions.

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

SOP. Working in Confined Spaces

FAQs: Confined Spaces in Residential Construction

Procedure: Permit Activities-Work in Confined Spaces and Hot Works

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

WORK METHOD STATEMENT STRUCTURAL STEEL

FALL PROTECTION / ELEVATED WORK

Lifting Operation & Lifting Equipment Procedure

Potential risk of injury to staff

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

To comply with the OHS Act, the responsible manager must carry out and document the following:

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Permit To Work. A permit to work system is designed to ensure that all necessary actions are taken before,during,and after most of task on plant.

(iii) The controlling contractor must apprise the host employer of the information exchanged with the entry entities pursuant to this subparagraph.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D

Welcome to the CHALLENGER SAFETY Induction

Working Near, On or Above Water

Safe Work Method Statement

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Suitability of Work Equipment

Code of Practice and Instructions to Contractors Working for Viridor

Occupational Health Safety and Welfare. Our Policy

Appendix 4C - Sample SWMS Trenching

Level 2 Award in Working in High Risk Confined Spaces

Confined Space Management

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Electrical Machines & Drives Group Safety Policy 2018/2019

Electrical safety code of practice Working near overhead and underground electric lines

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Transcription:

GOLDEN SAFETY RULES

The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted the Golden Safety Rules, the occurrence of incidents from high risk activities has substantially reduced. Golden Safety Rules are underpinned by Our Safety Culture framework, which defines how we behave in relation to health and safety. Following our Golden Safety Rules helps us to achieve a Perfect HSE day, every day. Please take the time to familiarise yourself with the Golden Safety Rules. And if you or your workmates have any queries about how these apply to you or your work, please stop and discuss any concerns with your supervisor. Peter Coleman Chief Executive Officer

Using this booklet The Golden Safety Rules summarise the mandatory requirements for safety in the workplace. This includes management aspects of work such as planning, competency and documentation requirements. As the Golden Safety Rules do not cover all operational risks it s important that you make yourself aware of any other safety requirements before undertaking, and during work. Foundations Change Management Confined Space Entry Driving Safety Electrical Safety Ground Disturbance Lifting Operations Permit to Work Process and Mechanical Isolations Working at Heights

Golden Safety Rule Foundations Work must not be performed without implementing these fundamental requirements, which underpin the Golden Safety Rules.

Foundations Everyone has an obligation to stop work that is unsafe. People must be trained, competent and fit for the activity. Work must not be conducted without a pre-job risk assessment appropriate to that level of risk. Safety equipment must not be removed, overridden or disabled without authorisation. Safety discussions must take place prior to work commencing. Personal Protective Equipment (PPE) must be worn as per the risk assessment and site requirements. Equipment must be fit for purpose and in good working order, or removed from service. Rescue and recovery plans and equipment must be in place before an activity begins. Potential dropped objects must be identified and controlled at the worksite. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Change Management Permanent or temporary changes to an organisation, technical design or work process that have a HSE impact must only proceed if:

Change Management Activities that alter or operate outside of an approved organisation, technical design or work process must be identified as a change. Impacts of the change must be identified and risks assessed. A plan must be in place that specifies the timescale for the change and control measures to be implemented. The change must be authorised, communicated and managed to completion. An assessment of readiness must be made prior to change implementation. A change must be reassessed if there is an unexpected change to the risks or the approved plan. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Confined Space Entry Before entry into a confined space, all Foundations requirements must be met and:

Confined Space Entry Options to eliminate the need for a confined space entry must be evaluated. Equipment must be approved for use in confined spaces. Sources of energy affecting the confined space must be isolated. Initial atmospheric testing must be completed and verified. Re-testing must be conducted throughout the activity as per the permit conditions. A standby person must be in place at all times to raise the alarm. They are not to enter the confined space. Prior to entry, the work party must confirm the rescue plan, valid permit and safety controls are in place. Unauthorised access must be prevented. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Driving Safety Before starting a journey, all Foundations requirements must be met and:

Driving Safety Drivers must be fit for work and unaffected by fatigue, drugs or alcohol. Drivers must be licenced for the class of vehicle and comply with speed limit and local road rules. The suitability and safety of the vehicle must be assessed prior to any journey being undertaken. Loads must be secured and not exceed manufacturer s design specifications or legal limits for the vehicle. Drivers must not operate mobile phones while driving regardless of whether they are hands free or not. Seatbelts must be installed and worn by all occupants. The number of passengers must not exceed the specifications for the vehicle. The prescribed journey management plan must be followed when applicable. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Electrical Safety Before starting electrical work, all Foundations requirements must be met and:

Electrical Safety Isolation schemes must be reviewed and approved by an authorised person prior to implementation. All isolations must be clearly identified, proven, tagged and/ or locked to prevent inadvertent operation. Portable electrical equipment must be inspected and confirmed in good condition before use. Testing or fault finding on or near exposed live conductors is not permitted without authorisation. Intrusive work on live conductors or near live exposed conductors is not permitted. Work on or near batteries is not permitted without authorisation. A test for de-energised must be completed prior to starting an activity and after any breaks or change in conditions. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Ground Disturbance Before starting ground disturbance work, all Foundations requirements must be met and:

Ground Disturbance The requirement for a confined space entry permit must be assessed. Prior to commencing ground disturbance activities all underground services and hazards must be identified, located and if necessary, isolated. Traffic and pedestrian movement must be planned and controlled. The ground disturbance area must be clearly identified and access restricted to authorised personnel only. A spotter must be present in the immediate area for all ground disturbance activities. People must not enter an excavation unless it has been safely sloped, benched, shored or shielded. Ground movement and stormwater drainage conditions must be continuously monitored. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Lifting Operations Before starting lifting operations, all Foundations requirements must be met and:

Lifting Operations A lift plan, specific to the operation, must be developed by a competent person. A competent person must: Check that all safety devices are operational Inspect all the lifting equipment and lift points Rig the load and secure load prior to lift. Operators of powered lifting equipment must be competent for the specific equipment and location. The maximum weight and type of the load must be less than the working load limit (WLL) or rated capacity of the lifting equipment. Clear communication must be established and maintained between everyone involved in the lift. People must not be positioned under a suspended load or between a suspended load and fixed objects. Safety controls must be in place to identify the lift area and travel path of the item being lifted, and people must not enter without authorisation. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Permit to Work Before starting work, all Foundations requirements must be met and:

Permit to Work The work must be approved by an authorised person for the site or facility. The permit must be valid and have a clearly defined scope of work. Isolations must be in place and verified before commencing work. Safety controls identified within the permit must be in place, verified and complied with for the duration of the work. The conditions and status of the permit must be communicated to everyone involved, prior to work starting and upon handover. There must be no conflicting activities. Work parties must be aware of simultaneous activities occurring within the area. When circumstances or conditions change, work must be stopped, made safe and reassessed. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Process and Mechanical Isolations Before starting work requiring an isolation, all Foundations requirements must be met and:

Process and Mechanical Isolations The planned sequence of isolation and de-isolation must be risk assessed and approved by an authorised person. The method of removal and reintroduction of stored energy and/or hazardous materials must be risk assessed and approved by an authorised person. All isolation/de-isolation steps must be completed by an authorised person. All isolation points must be clearly identified, proven, tagged and controlled to prevent inadvertent operation. Prior to breaking containment, the isolation either side of the break must be verified, and a test for hazardous materials/ stored energy performed. Re-testing must be performed in line with permit conditions. Isolation schemes must be revalidated if conditions change. For further information, refer to Safe Work Control Procedure.

Golden Safety Rule Working at Heights Before starting work at heights, all Foundations requirements must be met and:

Working at Heights Options to eliminate the need for working at heights must be evaluated. All items including tools and equipment must be secured to prevent dropped objects. A fixed or mobile platform with a guard or hand rail must be used where practicable and verified by a competent person. Fall prevention system must limit free fall to two metres or less. A fall prevention system must be used as determined by the pre-job risk assessment. Anchor points must be inspected and assessed as suitable before use. When using a fall prevention system, people must be hooked to an anchor point at all times. For further information, refer to Safe Work Control Procedure.

Foundations Change Management Confined Space Entry Driving Safety Electrical Safety Ground Disturbance Lifting Operations Permit to Work Process and Mechanical Isolations Working at Heights For more information refer to the Woodside Management System (WMS) or the HSEQ intranet. Dec 2017 WEL 50 rev11