FOLSOM-HOWARD STREETSCAPE OVERVIEW

Similar documents
ABOUT THIS OPEN HOUSE

Welcome! San Jose Avenue Open House August 25, 2015

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

FINAL REPORT DECEMBER 2011

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Freeway ramp intersection study

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

STONY PLAIN ROAD STREETSCAPE

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Tonight is for you. Learn everything you can. Share all your ideas.

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

EXECUTIVE SUMMARY. Vision

Welcome to the Quebec Alternatives Analysis Public Meeting

Bicycle Master Plan Goals, Strategies, and Policies

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

San Jose Transportation Policy

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

122 Avenue: 107 Street to Fort Road

Vision Zero Priority Projects (March 2017)

Polk Streetscape Project

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Transportation Assessment

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

PEDESTRIAN ACTION PLAN

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Options. Agenda. Program

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Broadway Complete Streets Project

Upper Market Street Bike Lane Project

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

Mission Bay Loop (MBL) Public Meeting

Lincoln Neighborhood Corridor Plan The LiNC

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FALL 2014 WORKSHOPS TAKEAWAYS

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

RICHARDS STREET BIKE LANE

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Governance and Priorities Committee Report For the July 2, 2015 Meeting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Tunnel Reconstruction South 5 th Street Association October 16, 2018

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Geary Corridor Bus Rapid Transit

CURBSIDE ACTIVITY DESIGN

Better Market Street Project. Project Update January 15, 2015

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Why invest in the 1 Street S.W. Corridor?

Active Transportation Facility Glossary

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Complete Streets. Designing Streets for Everyone. Sarnia

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Omaha s Complete Streets Policy

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Ann Arbor Downtown Street Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Ocean Park Boulevard Green Street Project Community Workshop

Lawrence Avenue Streetscape Concepts August 30, 2011

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Community Task Force March 14, 2018

Road Diets FDOT Process

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Bicycle Network. Vision Zero San Francisco The City and County of San

Monroe Street Reconstruction

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

San Francisco Planning Department IPIC Report 2016

San Mateo County Bicycle and Pedestrian Advisory Committee

CONNECTING PEOPLE TO PLACES

Station 1: Street & Sidewalk Upgrades

NEWMARKET UPHAM S CORNER

COMPLETE STREETS PLANNER S PORTFOLIO

Southside Pilot Proposal

Transcription:

FOLSOM-HOWARD STREETSCAPE OVERVIEW SoMa residents should have the same kinds of amenities that other neighborhoods have. The Folsom- Howard Streetscape Project will make SoMa more livable by making it safer and more pleasant to walk, bike, shop and live along Folsom and Howard Streets. N 11th St Howard Folsom 8th St 7th St 6th St 5th St Howard Mission 3rd St Folsom Project boundaries 2nd St Howard Safety is the number one priority of this project. All San Franciscans deserve to be able to get around safely. Folsom and Howard are a part of the city s High Injury Network of streets and this project will improve safety on the corridor helping the city meet its Vision Zero goal of eliminating traffic fatalities. Project Goals: Folsom St. Improve traffic safety for all people who use Folsom and Howard streets Prepare for future growth in the neighborhood Make biking and walking in SoMa a more comfortable experience Make changes to improve transit services Howard St.

PROJECT HISTORY San Francisco s Transit First policy was adopted by the Board of Supervisors in 1973 and prioritized walking, public transit, and cycling on the city s streets. In recent years, San Francisco has implemented additional efforts to make San Francisco streets more livable including Vision Zero, the Better Streets Plan, Green Connections, and the Bicycle Plan. In 2011 Eastern Neighborhoods Transportation Implementation Planning Study (EN TRIPS) began to examine transportation infrastructure projects for the expected population growth in the eastern area of the city. The Draft Central SoMa Plan is evaluating in greater detail land use and transportation improvement concepts from EN TRIPS. A draft environmental impact report was released in December 2016 and it is expected the plan will be adopted by the Board of Supervisors by the end of 2017. The will turn these plans into final designs, seek approval from the SFMTA Board of Directors, and constructing the project. History of Planning on Folsom and Howard Draft of Central SoMa Plan released by Planning The SFMTA makes traffic Department, which safety improvements on creates a vision for a Folsom, including removing sustainable and more one travel lane for a buffered livable neighborhood and wider bike lane 2011 2013 2014 2015 City publishes Eastern Neighborhoods Transportation Implementation Planning Study Report, which recommended initial streetscape design plans for Folsom and Howard streets EIR begins for Central SoMa Plan, investigating the Plan s effects on the community The SFMTA makes traffic safety improvements on Howard, including adding a buffer to the existing bike lane Performance of She, Who Can See by Kularts. Photo by Wilfred Galila. Electroviolinist CryWolffs! performing at SOMA Pilipinas. Kularts. Photo Credit: Dawan Photo by tobakhopper, the crowd : folsom street fair, san francisco (2013) September 29, 2013 via Flickr, Creative Commons Attribution

NEAR-TERM IMPROVEMENTS Permanent streetscape changes to improve safety on Folsom and Howard streets will take years to implement. Meanwhile, hundreds of thousands of people will continue to use these two streets. The Mayor has directed the SFMTA to improve safety on San Francisco streets as quickly as possible. That is why the we are developing ways to improve safety now, with improvements like parking-protected bikeways and improved loading on the two streets to reduce conflicts between users. These near-term changes could be implemented in 2017, and the SFMTA will continue to reach out to neighbors, business and community groups about these inexpensive and proven techniques that improve safety. 19 P O L 19 P O L K K South of Market Near-Term painted parking protected bikeways will be pursued on Folsom (12th-4th) and Howard (11th to 6th) The full will include landscaping and curb changes A new buffered bike lane will be added on southbound Folsom between 11th and 13th 12th St 13th St 10th 1th St Folsom Mission Howard h St Western SoMa 6th S East SoMa Mission Howard Central Corridor Folsom 2nd St Harrison H Floating parking separates the bikeway from moving traffic, as shown on 7th Street. Boarding islands like the one shown above will reduce conflicts between the 12-Folsom and bicycle riders on Folsom Street. The SFMTA has just installed a painted parking protected bikeway on 7th & 8th streets be sure to check it out! The design below (7th street) is very similar to what is being developed for Folsom and Howard for 2017.

WHAT WE VE HEARD WHAT ARE YOUR TOP PRIORITIES FOR FOLSOM AND HOWARD? Physically Protected Bikeway 0 Number of Responses 150 300 450 WHAT MAKES A STREET A GREAT PLACE? Number of Responses 0 125 250 Slower Traffic HOW DO YOU TRAVEL TO/FROM FOLSOM AND HOWARD? Wider Sidewalks Landscaping Landscaping Bikeway in Both Directions Wider Sidewalks Separation between Sidewalks and Moving Cars 88% Walk 53% Bike 26% Taxi/Uber/Lyft Streetscape Elements Streetscape Elements Shorter Crossing Distances Transit-Only Lanes Maximize Parking Spaces Maximize Vehicle Capacity Simpler Intersections with Fewer Turning Movements Efficient Curb Access for Parking and Loading Wider Streets 46% Muni 36% Drive 2% BART Maximize Loading Space Folsom Street Priorities Howard Street Priorities Folsom Street Less Important Howard Street Less Important 2% 28% 13% 19% 17% 21% WHICH OF THESE BEST DESCRIBES YOUR INTEREST IN THIS PROJECT? I travel along these streets I live in SoMa I work in SoMa I live on Folsom or Howard I come here for recreation I own a business on Folsom or Howard The open house held in December introduced the streetscape project, reviewed how the street currently works (or doesn t), and invited the community to share their preferences for how Folsom and Howard should be shaped through this project. The information you provided at the open houses and in the following months is reflected in the design alternatives.

WE CAN T FIT EVERYTHING - HELP US PICK The Everything Street 15 Sidewalk 7 Bike lane 5 Buffer 8 Parking 12 Transit Only Lane 10 Drive Lane 10 Drive Lane 8 Median 10 Drive Lane The Everything Street: 145 feet wide Actual Street Width 82.6 ft. 10 Drive Lane 12 Transit Only Lane 8 Parking 5 Buffer 7 Bike lane 15 Sidewalk There is a limited amount of space for all users of Folsom and Howard streets. The new designs will try to balance everyone s needs. The next few boards show four possibilities for Folsom and Howard which have incorporated the community s feedback about transportation and amenities. Please use post-its or complete a questionnaire to let us know your thoughts. We ll use public input to shape a final staff alternative. We will not be selecting one of these alternatives in its entirety, but rather we will use your feedback along with further technical analysis and results from ongoing outreach to businesses, schools, and other stakeholders, to combine the most successful elements into a final design recommendation.

WIDE SIDEWALKS ALTERNATIVE This alternative prioritizes widening the sidewalks as much as possible, with all sidewalks along both Folsom and Howard at 15 feet wide. This affords the most space for greening and public space. The alternative would provide one-way bike lanes on both streets, which, similar to all other alternatives, would be separated from moving traffic by parking. Vehicular traffic would be one-way with two lanes on each street and parking on both sides during the offpeak. However, on Folsom one side of parking would be a tow-away lane for transit during rush hour. On Howard, one side of parking would be a tow-away lane for vehicle travel during rush hour. USE SCORE DETAILS Pedestrians 60 Total width of sidewalk is 60 feet Bicycle 16 Protected one-way bike lane on both streets. Total width of bike lanes is 16 feet Vehicles +15% Peak period-only bus lane on Folsom; otherwise bus is in mixed flow. Transit travel speed would increase by 15% during peak Parking 25% Parking at all times on one side of each street; plus other side during off-peak on both streets. Reduce parking by 25% Loading +/ Loading would either be relocated or added for existing uses Greening and Public Space +++ Wider sidewalks would increase space for landscaping Peak Hour Tow-Away Lane + Yes HOWARD STREET - LOOKING WESTBOUND Peak: Bus Lane Off Peak: Parking Lane Peak: Drive Lane Off Peak: Parking Lane Bike Lane: 8 Bike Lane: 8 HOWARD STREET Two travel lanes on both streets in off-peak (three during peak on Howard) Transit Intersection FOLSOM STREET - LOOKING WESTBOUND FOLSOM STREET Reduced pedestrian crossing distance plus bike and pedestrian head-start phases added This lane provides an additional travel lane on Howard and a bus lane on Folsom during peak hours

BICYCLE CONNECTIVITY ALTERNATIVE This is the only alternative that would provide two-way FOLSOM STREET - LOOKING WESTBOUND HOWARD STREET - LOOKING WESTBOUND bike lanes on both streets, which, similar to all other alternatives, would be parking protected. Only 3 of the sidewalks would be widened in this alternative. As in the Wide Sidewalks Alternative, vehicular traffic would be one-way with two lanes on each street and parking on both sides during the off-peak. However, on Folsom one side of parking would be a tow-away lane for transit Bike Lane: 14 during rush hour. On Howard, one side of parking would Bike Lane: 12 be a tow-away lane for vehicle travel during rush hour. USE SCORE DETAILS Pedestrians 54 Total width of sidewalk is 54 feet Bicycle 24 Two-way protected bike lanes on both streets. Total width of bike lanes is 24 feet Vehicles HOWARD STREET Two travel lanes on both streets in off-peak (three during peak on Howard) Transit +15% Peak period-only bus lane on Folsom; otherwise bus is in mixed flow. Transit travel speed would increase by 15% Parking 25% Parking at all times on one side of each street; plus other side during off-peak on both streets. Reduce parking by 25% Loading +/ Loading spaces for local businesses would either be relocated or added Greening and Public Space ++ Increased space for greening and public space Intersection ++ Pedestrian crossing distances would be reduced with head start phases and dedicated phases for walking and biking at some intersections. Peak Hour Tow-Away Lane Yes This lane provides an additional travel lane on Howard and a bus lane on Folsom during peak hours FOLSOM STREET

TRANSIT-FOCUSED ALTERNATIVE This alternative would provide an all-day red transitonly lane on Folsom. One-way protected bike lanes FOLSOM STREET - LOOKING WESTBOUND HOWARD STREET - LOOKING WESTBOUND would be provided on both streets. Vehicular traffic would be one-way with two lanes on each street Widened to 14 during the off-peak. Parking would be maintained Peak: Drive Lane Off Peak: Parking Lane on both sides of Folsom at all times and sidewalks could be widened by 2-3 feet. One side of parking Bike Lane: 5 on Howard would be a peak-period tow-away vehicle travel lane while sidewalks could be widened to Widened to 14 Bike Lane: 6 15 feet. USE SCORE DETAILS Pedestrians 58 Total sidewalk width is 58 feet Bicycle 14 One way protected bike lane on each street. Total width of bike lanes is 14 feet Vehicles Streets remain one-way, each with two general traffic lanes (Howard would have three during peak periods) Transit +30% Buses on Folsom operate in a dedicated bus-only lane at all times. Transit travel speed would increase by 30% Parking 30% Folsom would have parking on both sides. Howard would have one parking lane plus a peak-period tow-away lane. Parking reduced by 30% Loading + Greening and Public Space ++ Loading spaces for local businesses would either be relocated or added, with loadin at all times on Folsom HOWARD STREET FOLSOM STREET Increased space for greening and public space Yes A peak hour tow-away lane on Howard only would provide an additional lane of vehicle travel BUS Pedestrian crossing distances would be reduced; ped and bike head start phases would be included BUS Peak Hour Tow-Away Lane + BUS BUS Intersection

TWO-WAY TRAFFIC ALTERNATIVE This alternative would provide two-way traffic on FOLSOM STREET - LOOKING WESTBOUND HOWARD STREET - LOOKING WESTBOUND both streets. A bike lane in each direction, parking on both sides, and one vehicle travel lane in each direction would be provided on Folsom. Transit would operate in one mixed-flow vehicle travel lane and sidewalks on Folsom would remain 10 feet if parking is provided on both sides. Howard would consist of two vehicle travel lanes in each direction, parking on one side of the street, and sidewalks Bike Lane: 7 Bike Lane: 7 widened to 15 feet. USE SCORE DETAILS Pedestrians 50 to 60 Total sidewalk with is between 50 and 60 feet depending on amount of parking reduction Bicycle 14 Protected bike lane in each direction on Folsom; no Howard bike lanes. Total width of bike lanes is 14 Vehicles Both streets converted for two-way traffic. No left turns from Folsom Transit would operate in one mixed used lane at all times. Transit travel speed would decrease by 65% Transit 65% Parking -30% to -45% No parking on one side of Howard. Folsom parking reduced between 30% and 45%if a side of parking is removed Loading Loading would be concentrated to one side of Howard and both sides of Folsom Greening and Public Space Intersection Peak Hour Tow-Away Lane ++ No HOWARD STREET FOLSOM STREET Increased space for greening and public space While ped crossing distances would reduce, new turning movements would introduce new conflicts between drivers, pedestrians, and cyclists Parking would be permitted on both sides of Folsom at all times

ALTERNATIVES SUMMARY The alternatives shared today prioritize people. All of them include parking protected bike lanes, widened sidewalks and opportunities for greening or public space, though they vary in how much space is allocated to each. Most options improve transit operations. All options will see a decrease in parking. The table below provides a summary of how each alternative will affect different users; more detail is provided on the individual boards for each alternative. USE WIDE SIDEWALKS BICYCLE CONNECTIVITY TRANSIT- FOCUSED TWO-WAY TRAFFIC RELATION TO DECEMBER OPEN HOUSE FEEDBACK Pedestrians 60 54 58 50 to 60 Wider sidewalks were cited as a priority for Howard and Folsom and an element that makes a street a great place. All alternatives widen sidewalks on at least one side of the street on Folsom and Howard with the Wide Sidewalks and Two-Way Traffic (possibly) alternatives providing the most space for pedestrians. Bicycle 16 24 14 14 Vehicles Transit +15% +15% +30% 65% Physically separated bikeways were the top priority for people who responded in December and every alternative includes them. Bikeways in both directions were also a priority and is included in the Bicycle Connectivity Alternative. Maximizing vehicle capacity or the number of travel lanes was viewed as less important for the two streets. With community priorities focused on wider sidewalks, physically separated bike lanes, and landscaping, vehicle travel lane reductions are included for each alternative. Transit-only lanes were viewed as more important on Folsom than on Howard. The Wide Sidewalks and Bicycle Connectivity alternatives have a peak-period transit lane like the Transit-Focused Alternative has a 24-hour red transit lane. Parking 25% 25% 30% -35% to -45% Maximizing the number of parking spaces was viewed as less important on Folsom and Howard. Parking removal is proposed for every alternative to provide increased space for sidewalks, bikeways, transit improvements, and landscaping. The Two-Way Traffic Alternative would potentially remove parking on one side of both streets. Loading +/ +/ + Greening and Public Space +++ ++ ++ ++ Intersection + ++ + People who responded to the questionnaire indicated that maximizing space for curbside loading activities was less important on Folsom and Howard. Many of the existing yellow, white, green, and blue zones are not consistent with the adjacent land use. This project will reassess curbside loading and reassign loading zones where they are needed. The Two-Way Traffic Alternative would potentially remove loading on one side of both streets. Landscaping and streetscape elements were cited as priorities for Folsom and Howard and elements that make a street a great place by the public in December. All project alternatives increase the space for these improvements and will be developed and finalized with the public s input by Public Works. Slower traffic, wider sidewalks, shorter crossing distances, and simpler intersections with fewer turning movements were all indicated as elements that make a street a great place. All alternatives would provide shorter pedestrian crossing distances at intersections, wider sidewalks, and bike or pedestrian head starts. The Two-Way Traffic Alternative would introduce new turning movements which would increase the number of potential conflict points between vehicles and people who walk and bike. Peak Hour Tow-Away Lane Yes Yes Yes No A peak hour tow-away lane would provide additional capacity for vehicles on Howard and transit on Folsom. Since the Transit- Focused Alternative would include a 24-hour red transit lane on Folsom, no tow-away lane would be required. Tow-away lanes on Folsom or Howard are not proposed for the Two-Way Traffic Alternative.

SOMA PROJECT COORDINATION Several SoMa streets are being transformed to support the Central SoMa Plan and the city s traffic safety goals. Project improvements may include reconfiguring the street, repaving, upgrades to sidewalks and crosswalks, new protected bike lanes, bus stop improvements, and more. The projects below are in various stages of planning, conceptual design and even construction. A list of project managers and their contact info is located at the sign-in desk. St SoMa Neighborhood Project Map Harrison South of Market Bryant 13th 12th St Utah Market St F Proposed Projects Existing Bike Network 11 10th St 11th St Folsom 15th St Protected Bike Lane Design Completed Central SoMa Plan Area R Howard Hyd Mission 9th St R Division 1 ode Island 7/8 R Western SoMa Bryant Jon Townsend Tay 6th St Ma Sto Mission Howard F/H Gra Kear Folsom Bryant Mon 2nd St Harrison Harrison Brannan Brannan Showplace Square/Potrero Hill 7/8 Berry 6th St F/H T 6 East SoMa Bluxome Railyard Central SoMa Plan Area 5 R R Central Corridor 4th St C B King T AT&T Park 2 BMS H Market Transit Center District TFS Rincon Hill Beale Main Spear N EEP 2 6 5 7/8 11 B C BMS EEP F/H H T TFS F R 2nd Street Improvement Project 6th Street Improvement Project 5th Street Streetscape Project 7th/8th Streets Safety Project 11th Street Streetscape Project Brannan Safety Project Central Subway Project Better Market Street Project Embarcadero Enhancement Project Folsom/Howard Streetscape Project Harrison Street Project Townsend Bicycle Strategy Project Transbay Folsom Streetscape Project Folsom 11th St. to 13th St. Southbound Bike Gap Closure Vision Zero Ramp Intersection Study

PROJECT TIMELINE 2016 #1 Community Outreach January February 2017 Design Project team further developed designs incorporating community comments from #1 WE ARE HERE #2 - Show proposed draft design alternatives - Gather feedback on street designs March April May Outreach around near term safety improvements #3 Show refined design that incorporates feedback from open house 2 and additional outreach and analysis Project Approval Final design presented at a Public Hearing and approved at the SFMTA Board of Directors meeting. Opportunity for public testimony. Dates TBD but will be shared through project email list. June July August September October November December Design Project team will further develop designs incorporating community feedback and technical analysis. Construction Near term safety improvements installed 2018 Detailed Design Tenatively scheduled for 2018-2019 2020 Construction Tenatively scheduled for 2020-2023 2023

STREETSCAPE ELEMENTS Green Infrastructure: Stormwater Planters Permeable Paving Bike Infrastructure: Corral Racks / BikeShare / Bike Racks Street Trees Midblock Crosswalks Corner Bulb outs to provide pedestrian refugee Raised Crosswalk at Alleys April 27th & 29th 2017

STREETSCAPE ELEMENTS Cultural Identity Urban Design and Art Roadway + Pedestrian Lighting Greening Alley Improvements Parklets Site Furnishings: Benches / Café Seating April 27th & 29th 2017

PARKWAY CONCEPT PARKWAY CONCEPT: ONE-WAY BIKE DRIVE PARKING BUFFER BIKE SIDEWALK PARKING BIKE SIDEWALK PROPOSED: 15 -WIDE SIDEWALK WITH STREET LEVEL 1-WAY BIKE Note: Existing trees and lights to remain will be located within the widened sidewalk a minimum of 8 (Folsom Street) and a maximum of 10 (Howard Street) from the face of building. PARKWAY CONCEPT: TWO-WAY BIKE PROPOSED ALTERNATE:12 -WIDE SIDEWALK WITH 10 -WIDE BUFFER AND STREET LEVEL 1-WAY BIKE DRIVE PARKING BUFFER BIKE BIKE SIDEWALK PARKING BIKE SIDEWALK PROPOSED: 15 -WIDE SIDEWALK WITH STREET LEVEL 2-WAY BIKE Note: Existing trees and lights to remain will be located within the widened sidewalk a minimum of 8 (Folsom Street) and a maximum of 10 (Howard Street) from the face of building. PROPOSED ALTERNATE: 12 -WIDE SIDEWALK WITH 7-6 -WIDE BUFFER AND STREET LEVEL 2-WAY BIKE April 27th & 29th 2017