Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Similar documents
A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

S T A T I O N A R E A P L A N

Public Workshop #2. September 14, 2016

DOWNTOWN TENINO. Goal: Get more People in Downtown. A Pamphlet of Concepts for

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

NEWMARKET UPHAM S CORNER

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Reconnecting Communities ACTION PLAN FOR LOGAN CIRCLE

Mainstreet Master Plan Land Use

Tonight is for you. Learn everything you can. Share all your ideas.

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Derby Street. Project Updates. Salem, Massachusetts

STONY PLAIN ROAD STREETSCAPE

complete streets design and construction standards public primer City of Edmonton

6.4 RECOMMENDED IMPROVEMENTS

122 Avenue: 107 Street to Fort Road

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

The Wiggle Route in Context

Perryville Transit Oriented Development & Greenway Plan

5 CIRCULATION AND STREET DESIGN

Downtown Davidson Pedestrian and Bicycle Safety Plan

A Plan for The Beautiful Way NOVEMBER 16, 2009

Plant City Walk-Bike Plan

FONTAINE AVENUE STUDY Final Report

Chapter 5 Future Transportation

UDC Street Cross Sections

Functional, Preliminary Design and Detailed Design

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Why invest in the 1 Street S.W. Corridor?

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Enhancing Downtown

STREETSCAPE CONCEPT PLAN

PEDESTRIAN ACTION PLAN

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Comments The Plan for Port Whitby

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Elm Street Business District: Streetscape and Signage Plan

TRANSPORTATION & MOBILITY

Fulton Market Streetscape

COMPLETE STREETS PLANNER S PORTFOLIO

City of Birmingham Draft Multi-modal Transportation Plan

MAKE YOUR PLACE IN CHANNELSIDE

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Miami Health District

summary of issues and opportunities

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

NJDOT Complete Streets Checklist

Omaha s Complete Streets Policy

Chapter 4: Funding and Implementation

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Executive Summary Route 30 Corridor Master Plan

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

City of Davis East Covell Corridor Plan

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Table #6 VISION CHARACTERISTICS

Complete Streets Successes, Opportunities, and Challenges

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

Lawrence Avenue Streetscape Concepts August 30, 2011

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

CLOSED. Highlights of the Final Concept Design:

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811


Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

York Boulevard Streetscape Master Plan

MARTIN LUTHER KING JR. WAY

Community Workshop #1 Summary October 2017

Illustrated Principles of Good Planning

East Burke Transportation, Safety and Capacity Improvements

Speed Limits Study and Proposal. Public Input Session: 8/14/13

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Meade Street Bridge Design Alternative Study

Bonners Ferry US 95 South Hill Report

Lincoln Neighborhood Corridor Plan The LiNC

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

San Jose Transportation Policy

Cross Street Corridor Non-Motorized Enhancement Project Project Description

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Transcription:

Town of Ashland Downtown Planning Initiative 2 nd Community Workshop Presented by: March 29, 2018

Agenda Tonight Review project & goals Recap 1st workshop (September 18, 2017) Present design alternatives with discussion Next steps

Project Boundaries Phase 1 Pleasant St Corner Spot Town Hall Library LEGEND Roadway Residential Retail Commercial Restaurant Public Building Police & Fire Post Office

Project Goals Make downtown an attractive and welcoming place for residents and visitors Make downtown more inviting for business development Make downtown safe and accessible to all users (complete streets) Improve traffic flow Enhance historic character of corridor Explore relocating existing overhead utilities underground Identify and secure construction funding

What we learned from the 1 st workshop Attraction to downtown Corner Spot Farmers Market Shops/Restaurants Small Town Feel Greatest challenge with project Traffic RR Crossing Parking Lighting Pedestrian Accommodation Undergrounding Would like to see utilities buried Traffic There is a congestion problem along Main Street during rush hour Parking Perception there is not enough parking downtown What would you like to see happen downtown More Businesses (destination and commercial) Better Parking Management Safer and More Attractive Pedestrian Improvements Better Lighting Wider Sidewalks Bicycle Accommodation

Workshop Poll Results Sidewalk Character

Workshop Poll Results Crosswalk Treatments

Workshop Poll Results Outdoor Seating

Workshop Poll Results Wayfinding

Workshop Poll Results Street Plantings and Trees

Workshop Poll Results Public Art

Workshop Poll Results Site Furnishings

Workshop Poll Results Lighting

Alternative Development Developed two options Bike Lane & No Bike Lane Considerations Pedestrian Safety Level of Service (i.e. Traffic Flow) On-Street Parking Bike Lane Pedestrian/ADA Compliance Streetscape Cost

Main Street Alternative A (Water Street to Pleasant Street) 10.5 Sidewalk 30-50 Main New Traffic Signals 21 Main 10.5 Sidewalk 37 Main The Corner Spot 4 8

Main Street Alternative A (Pleasant Street to Front Street) 30-50 Main 98 Main Federated Church 8 Sidewalk 128 Main Santander Bank New Traffic Signals Glam Salon Nick s Pizza New Curb Extension 9 Sidewalk Ashland House Police Department Town Hall Cumulative Cumulative 14 18 19 27

Main Street Alternative A (Front Street to Homer Avenue) Santander Bank Town Land Municipal Lot 8-10 Sidewalk Pizza Mine New Traffic Signals New Traffic Signals 7-11 Sidewalk Stones Public House Main St. Wine & Spirits U.S. Post Office Cumulative Cumulative 9 23 8 35

Main Street Alternative A (View Toward Water Street)

Main Street Alternative B (Water Street to Pleasant Street) No Change in Sidewalk 30-50 Main New Traffic Signals 21 Main 37 Main No Change in Sidewalk The Corner Spot 4 7

Main Street Alternative B (Pleasant Street to Front Street) 30-50 Main 98 Main 8.5 Sidewalk (+2 ) Federated Church 128 Main Santander Bank New Traffic Signals Glam Salon Nick s Pizza Town Hall Ashland House Police Department Cumulative Cumulative 14 18 6 13

Main Street Alternative B (Front Street to Homer Avenue) Santander Bank Municipal Lot Town Land No Change in Sidewalk Pizza Mine New Traffic Signals New Traffic Signals Stones Public House No Change in Sidewalk Main St. Wine & Spirits U.S. Post Office Cumulative Cumulative 9 23 8 21

Main Street Alternative B (View Toward Water Street)

Main Street Alternative C (Pleasant Street to Front Street) 30-50 Main 98 Main No Change in Sidewalk Federated Church 128 Main Santander Bank New Traffic Signals Glam Salon Nick s Pizza Town Hall Ashland House New Curb Extension Police Department 14 20

Main Street Alternative C (View Toward Water Street)

Front Street Alternative A (Main Street to the Erica s Ristorante) Sunnyside Cafe Santander Bank 14.5 Sidewalk Agostinelli & Teller Insurance Anthony s Barber Stylist Ashland Public Library Erica s Ristorante New Traffic Signals Town Land Needham Bank 8 Sidewalk Municipal Lot 6 6

Front Street Alternative A (Erica s Ristorante to Project Limit) 8 Sidewalk Ashland Lumber Municipal Lot New Connection to Municipal Lot Farmers Market Cumulative Cumulative 13 19 12 18

Front Street Alternative A (View From Main Street)

Front Street Alternative B (Main Street to the Erica s Ristorante) Sunnyside Cafe Santander Bank 9 Sidewalk Agostinelli & Teller Insurance Anthony s Barber Stylist Ashland Public Library Erica s Ristorante New Traffic Signals Town Land Needham Bank 8.5 Sidewalk No Change in Sidewalk Municipal Lot 6 7

Front Street Alternative B (Erica s Ristorante to Project Limit) No Change in Sidewalk Ashland Lumber Municipal Lot New Connection to Municipal Lot Farmers Market Cumulative Cumulative 12 19 12 18

Front Street Alternative B (View from Main Street)

Next Steps Review comments/suggestions from workshop Complete traffic and parking analysis Provide recommendations related to undergrounding Develop preliminary design Present design to community Complete preliminary design

QUESTIONS?