BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Similar documents
Environment and Public Works Committee Presentation

Feasibility Study. Expo-Downtown Bicycle Connector

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

ARLINGTON COUNTY, VIRGINIA

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

122 Avenue: 107 Street to Fort Road

Omaha s Complete Streets Policy

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

1.0 EXECUTIVE SUMMARY

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Tonight is for you. Learn everything you can. Share all your ideas.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Living Streets Policy

Paoli Road Improvement Feasibility Study

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Chapter 5. Complete Streets and Walkable Communities.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Governance and Priorities Committee Report For the July 2, 2015 Meeting

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

/ ARLINGTON COUNTY, VIRGINIA

City of Fairfax, Virginia City Council Work Session

5. RUNNINGWAY GUIDELINES

Bicycle Master Plan Goals, Strategies, and Policies

ACTION TRANSMITTAL No

Complete Streets. Designing Streets for Everyone. Sarnia

Public Works and Infrastructure Committee. General Manager, Transportation Services

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

City of Ann Arbor Pedestrian Safety & Access Task Force

Major Bike Routes 102 Avenue Workshop April 21, 2015

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Active Transportation Facility Glossary

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Planning Guidance in the 2012 AASHTO Bike Guide

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Bay to Bay Boulevard Complete Streets Project

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Report. Typical Sections. City of Middleton, WI

Community Task Force July 25, 2017

Safe Routes to School Action Plan Aberdeen, Idaho

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Pedestrian Safety Guide for Transit Agencies

Chapter 2: Standards for Access, Non-Motorized, and Transit

New Castle County Bicycle Plan. Heather Dunigan ext

AGENDA ITEM G-2 Public Works

CTDOT Pedestrian and Bicycle Safety Initiatives

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Chapter 4: Funding and Implementation

Physical Implications of Complete Streets Policies

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Display Boards Including Five Refined Design Concepts

Item No. 14 Town of Atherton

City of Memphis On-Street Parking Modification Guidelines

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

Upper Market Street Bike Lane Project

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Richmond-Adelaide Cycle Tracks

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

FOLSOM-HOWARD STREETSCAPE OVERVIEW

5 Transit & Traffic. Overview

City of Seattle Edward B. Murray, Mayor

LANCASTER CITY BICYCLE NETWORK

MARTIN LUTHER KING JR. WAY

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Simulation Analysis of Intersection Treatments for Cycle Tracks

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Welcome. If you have any questions or comments on the project, please contact:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Monroe Street Reconstruction

Pennsylvania Avenue (CR 484) Design Alternatives Study

City of Scotts Valley CITY COUNCIL STAFF REPORT

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

RZC Appendix 8A Marymoor Subarea Street Requirements

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Transcription:

FORM GEN. 160 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date: To: Honorable City Council From: Gary Lee Moore, City Engineer Bureau of Engineering 7%mt /Electronically signed by 21866 on 02/01/2019 at 4:30:10 PM \ Seleta J. Reynolds, General Manage ^Department of Transportation Adel Hagekhalil, Director Bureau of Street Services.JgjL. SUBJECT: 4 BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE 17-0950 RECOMMENDATION That the Council, subject to the approval of the Mayor: 1. APPROVE Alternative No. 1 - Full Additional Scope, for the Reseda Boulevard Complete Street project as shown in Attachment A. 2. APPROVE the revised Reseda Boulevard Complete Street project budget as detailed in the approved Scope Alternative. 3. DIRECT the City Engineer to include additional complete streets elements for the Reseda Boulevard Complete Street project as described in the approved Scope Alternative. 4. DIRECT the City Administrative Officer (CAO) to report to Council recommended appropriations for the amended Reseda Boulevard Complete Street project budget. BACKGROUND The Street ReconstructionA/ision Zero Program, also referred to as the Complete Streets Program, is funded in part by the newly created State SB1 funds. Accordingly, local agencies, such as the City of Los Angeles, quickly identified eligible projects when funding became available. In response, the program developed a scope of six (6) projects that were excellent candidates for the inaugural first year of the Complete Streets Program; recognizing that standard project development procedures, including field analysis, parking analysis, traffic analysis, pre-design, and additional community engagement would have to be performed concurrently and could ultimately result in refined scopes.

Page 2 On March 28, 2018, the Mayor concurred with the actions of City Council adopting the amended Budget for the Street Reconstruction and Vision Zero Program for 2017-2018, Council File 17-0950. The Council action, as recommended in the February 16, 2018 CAO report, establishes the work plan for the Street Reconstruction/Vision Zero Program s implementation. The City will phase the work in over multiple years. Council action item No. 7 instructed the City Engineer to include sidewalk repair and green street stormwater compliance elements in the designs for the first six Complete Streets projects, and include in the design curb extensions for the Reseda Boulevard and Avalon Boulevard projects. The Council instructed the Departments to report back with the final project budgets, working with the Council offices of the districts that include each of those projects, to maximize the amount of work performed while keeping costs within set budgets. Additionally, Council action item No. 8 instructed the City Engineer (BOE), the Los Angeles Department of Transportation (DOT), and the Bureau of Street Services (BSS) not to implement any phase of each of these projects if the cost of that phase is significantly higher than the authorized budget and the Council has not already approved a new budget for the project. Currently, three (3) of the six (6) projects, Roscoe Boulevard, Temple Boulevard, and Venice Boulevard, are in the construction phase and an additional project, Main St., is currently in the bid and award phase. Pursuant to these instructions, BOE, DOT and BSS along with the program oversight body, composed of interested City stakeholders, have worked together to prepare this report, which summarizes the development of the Reseda Boulevard project, for your consideration. DISCUSSION The Los Angeles City Planning s Complete Street Design Guide is a complement to the Mobility Plan 2035 that provides a compilation of design concepts and best practices that promote the major tenets of complete streets - safety and accessibility. As outlined in the guide and in California s Complete Streets Act of 2008 (AB 1358), the goal of complete streets is to ensure that the safety, accessibility, and convenience of all transportation users - pedestrians, bicyclists, transit riders, and motorists - are accommodated. Since the initiation of the Complete Streets Program, the City has developed a more robust approach to community engagement, especially with respect to transportation projects. BOE and DOT s approach to engagement around the Reseda Boulevard project includes continual public engagement and education, coupled with project specific events. The City departments incorporate feedback from community engagement in the overall project design as the project progresses.

Page 3 For the Reseda Boulevard project, the project team worked with the Council offices and community leaders in conducting robust public engagement events, including a specific focus on the business community. The City engaged with every business along the project corridor, and businesses completed surveys about their understanding of the project. Other engagement activities included a council office open house, Neighborhood Council meetings, public comment audit, canvassing and tabling at various street fairs, street and phone surveys, mixers, residential canvassing, and events at California State University at Northridge (CSUN). Considering feedback from the Council offices, public and business engagement, and additional detailed transportation and engineering analysis of Reseda Boulevard project, the departments have vetted the following project elements for feasibility. Attachment A summarizes the cost of these elements: Vision Zero Elements Signal and Striping Modifications - protected left-turn phasing installations provide drivers turning left with the exclusive opportunity to turn while opposing traffic and pedestrians remain stopped, essentially eliminating conflicts among people driving and walking. The striping plan includes new bicycle lanes protected by parking and concrete elements. This configuration is consistent with the Mobility Plan designation of Reseda Boulevard as a bike enhanced network (BEN) street. Bus Boarding Islands - provide in-lane stops to improve transit efficiency and enhanced transit stops for bus riders. They also reduce the distance during which people crossing the street are exposed to moving traffic, eliminate conflicts with bicyclists, and encourage turning vehicles to make more careful turns. This is consistent with the Mobility Plan designation of Reseda Boulevard as a transit enhanced network (TEN) street. Relocated Bus Stops, Including New Bus Pads/Landings - bus stop relocations to the far side, where feasible, improve pedestrian safety and visibility when crossing the street. Curb Extensions - permanently widen an existing sidewalk using concrete at intersections or midway along a street. Curb extensions visually and physically narrow the street to create a shorter crossing for people walking, increase the visibility of people walking to drivers, increase driver yielding to people walking, and encourage turning vehicles to make slower, more careful turns. Pedestrian Islands - visually and physically narrow the street to create a shorter crossing distance for people walking. They also increase the visibility of pedestrians, slow vehicles approaching intersections, and encourage slower and more careful turns. Transit Shelters at Bus Stops - where the project proposes to relocate bus stops to the far side of an intersection for pedestrian safety, the project will also relocate the associated transit shelters.

Page 4 Security Lighting at Bus Stops - where the project proposes to relocate bus stops to the far side of an intersection for pedestrian safety, the project will also relocate the associated security lighting. Street Reconstruction Paving Added reconstruction and re-surfacing based on subsurface field analysis. Other Recommended Enhancements Trees in existing empty tree wells Trees in proposed new tree well locations Aesthetic treatments to public improvements Alternative No. 1 This alternative includes all recommended scope additions. The program oversight body recommends this alternative. This option best meets the complete street goals of the overall effort. Alternative No. 2 This alternative includes only changes to original project elements for Street Reconstruction and Vision Zero. This alternative does not include new transit shelters, security lighting, or additional trees/landscape. If Council desires to incorporate additional scope that meets complete street goals but stay within the original budget, the project team can analyze the feasibility of an additional alternative which reduces the length of the corridor. This will require additional analysis and evaluation, including community engagement updates to stakeholders. Reseda Boulevard Project Schedule of Phases Contingent upon Council approval and funding, the Program can complete final design by the end of calendar year 2019 and begin construction by the end of fiscal year 2019 20. We expect a construction duration of approximately 18 months. FISCAL IMPACT Approval of Alternative No. 1 of this report will increase the cost of the Reseda Complete Street Project by $7,424,000, compared to the approved budget. Approval of Alternative No. 2 of this report will increase the cost of the Reseda Complete Street Project by $4,164,000, compared to the approved budget. The adopted 2018-19 budget does not include funds for any increase. The Council will need to identify funds to support approval of either Alternative No. 1 or Alternative No. 2. At this time, it is

Page 5 unknown whether approval of either Alternative will have an impact on the General Fund. If you should have any questions, please contact Deputy City Engineer, Julie Sauter, of boe at (213) 847-2230, or Assistant Director, Keith Mozee, of BSS at (213) 847-3200, or Assistant General Manager, Daniel Mitchell, of DOT at (213) 972-8432, respectively. GLM\JS\GE:ge Attachment c: Liz Crosson, Mayor s Office Diego de la Garza, Mayor s Office Jennifer McDowell, Mayor s Office Matt Hale, Council Office 2 John Popoch, Council Office 3 Eric Bruins, Council Office 11 Patty Huber, City Administrative Office David Hirano, City Administrative Office Matias Farfan, Chief Legislative Office Paul Smith, Chief Legislative Office Daniel Mitchell, Department of Transportation Nader Asmar, Department of Transportation Julie Sauter, Bureau of Engineering Gene Edwards, Bureau of Engineering

ATTACHMENT A SCOPE ALTERNATIVES FOR RESEDA BOULEVARD Scope Elements Scope and Budget As Approved March 28, 2018 Alternative No. 1 Full Scope Alternative No. 2 Modified Scope Street Reconstruction / Resurfacing Signal Modifications Signals / Striping / Left Turn Phasing Bus Boarding Islands Relocated Bus Stops Bus Pads / Landings Vision Zero (subtotal) Sidewalks Green Infrastructure Curb Extensions Pedestrian Islands Transit Shelter at bus stops Security Lighting Fill Empty Tree Wells Construct New Tree Wells / Landscape Aesthetic Treatments Additional Trees / Landscape (subtotal) Construction Total Delivery Costs PROJECT BUDGET (subtotal) Escalation TOTAL PROJECT BUDGET * * $6,838,000 $7,203,000 $7,203,000 $3,207,000 $2,237,000 $2,237,000 $0 $2,186,000 $2,186,000 $0 $627,000 $627,000 $0 $386,000 $386,000 $0 $129,000 $129,000 $0 $231,000 $0 $0 $508,000 $0 $3,207,000 $6,304,000 $5,565,000 $2,741,000 $2,393,000 $2,393,000 $924,000 $900,000 $900,000 $0 $600,000 $0 $0 $504,000 $0 $0 $500,000 $0 $0 $1,604,000 $0 $13,710,000 $18,404,000 $16,061,000 $3,590,000 $5,400,000 $4,600,000 $17,300,000 $23,804,000 $20,661,000 $0 $920,000 $803,000 $17,300,000 $24,724,000 $21,464,000 * Amount shown is for modified resurfacing thicknesses, covering an increase in surface area across the entire corridor as compared to original scope.