District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

Similar documents
Ohio Department of Transportation STIP Project Listing (Appendix 6) as of 7/25/2018 Query: "Current STIP Detail 4"

Ohio Department of Transportation STIP Project Listing as of 7/27/2017 Query: "Current STIP Detail 4"

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

District Construction Projects

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

HIGHWAY CAPITAL IMPROVEMENT PLAN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

APPENDIX L: COST ESTIMATING TOOLS

Culpeper District. Albemarle County Monthly Report October, 2011

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

FDOT Treasure Coast Traffic Impact Report

Culpeper District. Albemarle County Monthly Report September, 2011

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

FDOT Treasure Coast Traffic Report

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

DISTRICT CONSTRUCTION PROGRAM

FDOT Treasure Coast Traffic Impact Report

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Highway Construction

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

CITY OF LANCASTER PROPOSED NEW PROJECTS

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

2040 Long Range Plan Projects Draft October 2011

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Report

S/TIP LIST OF PROJECTS

Taylor Road Resurfacing Project

CTH M HIGHWAY PROJECT CTH Q to STH 113

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

ADA Retrofits Triggered by Paving: What, When, and Why

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Legislative Update Williamsburg Residency

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Lake Waterford Community Association Meeting. November 15, 2016

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Gerald P. Oliveto, P.E. George Franz NJDOT

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

Design Criteria. Design Criteria

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2012 PRIORITY TRANSPORTATION PROJECTS

OTTAWA AVENUE NEIGHBORHOOD

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

The Year Ahead: Virginia Department of Transportation Northern Virginia District

SC 41/Joe Rouse Intersection Improvements

Driving Indiana s Economic Growth

CY2017 Summary of STP applications

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

Street Improvements in the area of New Street and Drury Lane

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Request for Authorization to Open Public Comment Period

July 31, HIGHWAY CAPITAL IMPROVEMENT PLAN

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

5 CIRCULATION AND STREET DESIGN

Project Name Project Description Authorized Amount

T W P L A I A A V O L H S Bike Network Plan Sylvania, Ohio. July 20, 2009

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

Derby Street. Project Updates. Salem, Massachusetts

PENNDOT HPMS DATA COLLECTION GUIDE

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Bluffdale/ UDOT South High-T Intersection Project Type Operations

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

0 CITY OF SANTA ANA 0

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

information, please contact the District 9 Offices at or

MIAMI & ERIE CANAL SHARED USE TRAIL

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

News Release Eastern Oregon Region 5

Single Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Roadway Design Manual

Non-Motorized Transportation 7-1

YAVAPAI COUNTY PUBLIC WORKS

Transcription:

77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00020**C 14.590 15.290 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00020**C 18.680 20.620 88084 LUC IR 475 6.48/7.53 Hill/D A district funded project to widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St; perform necessary 6.480 6.490 13,900,000.00 LUC IR 475 6.48/7.53 Hill/D A district funded project to widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St; perform necessary 7.530 7.540 88563 LUC IR 75 7.82 Smoothseal A district funded preventive maintenance project to smooth seal I-75 in Lucas from Cecelia to Michigan State Line; perform necessary See PID 23730 for Maj. Rehab SLUCIR00075**C 7.820 11.860 4,500,000.00 88567 HE US 24 0.00 Prev Maint A district allocation preventive maintenance project to smoothseal new US-24 from Defiance Line to US-6 in apoleon; perform necessary SHEUS00024**C 4.980 1,700,000.00 HE US 24 0.00 Prev Maint A district allocation preventive maintenance project to smoothseal new US-24 from Defiance Line to US-6 in apoleon; perform necessary SHEUS00024**C 10.640 15.630 90701 LUC South Ave Reconstruct A TMACOG funded project to reconstruct South Ave from Reynolds Rd to Byrne Rd; perform necessary related work; FIELD REVIEW Required. CLUCCR02233**C 2.230 03/10/19 4,763,637.00 91327 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 21.380 21.390 1,150,000.00 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 SFULSR00108**C 17.130 17.140 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 SLUCSR00064**C 7.860 7.870 Page 1

91327 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 SFULSR00109**C 9.380 9.390 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 26.040 26.050 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 23.600 23.610 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 SFULSR00108**C 17.120 17.130 US-20, SR108 and SR109 in Fulton and SR-64 in Lucas ; perform necessary (Added PIDs 95859 25.090 25.110 92126 92128 FUL US 20A 0.00 Resurf/Cu FUL US 20A 0.00 Resurf/Cu SE/WOO 590/635/18 Res A district allocation funded project to resurface US-20A in Fulton and replace 2 culverts; perform necessary UPDATE (11-4-13): added culverts from PID 95857. A district allocation funded project to resurface US-20A in Fulton and replace 2 culverts; perform necessary UPDATE (11-4-13): added culverts from PID 95857. SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SFULUS00020*AC SFULUS00020*AC SSESR00590**C 4.040 4.040 12.490 0.310 4,650,000.00 2,250,000.00 SE/WOO 590/635/18 Res SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SWOOSR00018**C 19.030 19.480 SE/WOO 590/635/18 Res SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SSESR00635**C 6.330 8.750 SE/WOO 590/635/18 Res SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SSESR00635**C 6.080 SE/WOO 590/635/18 Res SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SWOOSR00018**C 18.780 19.030 Page 2

92128 SE/WOO 590/635/18 Res SR-590 and SR-635 in Seneca and SR-18 in Wood COunty; perform necessary SSESR00590**C 0.310 0.480 92361 92371 93682 FUL SR 108 0.00 Resurf SE SR 18 2.93/23.06 Resu SE SR 18 2.93/23.06 Resu SE SR 18 2.93/23.06 Resu SE SR 18 2.93/23.06 Resu OTT SR 269 4.49 Culvert A 2-Lane district funded resurfacing project on SR-108 in Fulton from Henry line to CR-D; perform necessary UPDATE (10-7-13): extended end limit to 4.01 in Wauseon. UPDATE (7-23-15): reduced end limit to 3.02 segment of SR-18 in Seneca ; perform necssary related segment of SR-18 in Seneca ; perform necssary related segment of SR-18 in Seneca ; perform necssary related segment of SR-18 in Seneca ; perform necssary related A district allocation funded project to replace an existing 72"x44"x66' arch culvert located near SR-163; perform necessary SFULSR00108**C SSESR00018**C SSESR00018**C SSESR00018**C SSESR00018**C SOTTSR00269**C 2.940 10.580 6.200 9.830 4.490 3.020 6.200 12.090 9.830 10.580 4.500 1,000,000.00 3,200,000.00 200,000.00 94334 WIL SR 49 1.58 Resurf A 2-Lane district allocation funded project to resurface SR-49 in Williams ; perform necessary SWILSR00049**C 1.580 2.510 3,100,000.00 WIL SR 49 1.58 Resurf A 2-Lane district allocation funded project to resurface SR-49 in Williams ; perform necessary SWILSR00049**C 2.510 9.290 95339 LUC Toledo Lighthouse Ph A TMACOG funded phase 1 project to address exterior cleaning and stabilization of the masonry walls and structure of the the Toledo Harbor lighthouse; Also, new replacement windows and shutters will be included in Phase 1; perform necessary SLUCSR00065**C 6.590 6.600 03/15/19 580,500.00 95724 FUL SR 2 5.36 Resurf A district allocation funded project to resurface SR-2 from SR-66 to CR-19; perform necessary SFULSR00002**C 5.360 9.320 1,150,000.00 95755 OTT SR 2 10.34 Resurf A district allocation funded project to resurface SR-2 from abandoned RR to Camp Perry Western; perform necessary related work SOTTSR00002**C 10.430 14.870 2,000,000.00 95759 OTT SR 579 0.00 Resurf A district allocation funded project to resurface SR-579 from Wood line to SR-2; perform necessary SOTTSR00579**C 3.550 2,300,000.00 OTT SR 579 0.00 Resurf A district allocation funded project to resurface SR-579 from Wood line to SR-2; perform necessary SOTTSR00579**C 3.550 8.350 95772 SE SR 19 6.07 Resurf A district allocation funded project to resurface SR-19 from US-224 to SR228; perform necessary SSESR00019**C 6.070 9.070 1,600,000.00 SE SR 19 6.07 Resurf A district allocation funded project to resurface SR-19 from US-224 to SR228; perform necessary SSESR00019**C 9.070 9.570 SE SR 19 6.07 Resurf A district allocation funded project to resurface SR-19 from US-224 to SR228; perform necessary SSESR00019**C 9.570 15.180 95800 WOO SR 582 5.34 Resurf A district allocation funded project to resurface SR-582 from SR-25 to Sandusky Line; perform necessary related 6.790 1,500,000.00 Page 3

95800 WOO SR 582 5.34 Resurf A district allocation funded project to resurface SR-582 from SR-25 to Sandusky Line; perform necessary related 16.350 95819 LUC US 20 14.52 Urban Pav An urban paving project to resurface US-20 (Reynolds Rd) from Angola Rd to Glendale; perform necessary FIELD REVIEW REQUIRED. SLUCUS00020**C 14.520 15.760 03/15/19 1,850,000.00 95996 WIL SR 2 11.82 Bridge Pain Paint the structure steel of the WIL-2 bridge over the Tiffin River; perform necessary SWILSR00002**C 11.820 11.830 350,000.00 95997 WIL US 6 20.46/21.73 Bridg Replace exisitng 2 structures on US-6, perform necessary The first structure is over Tiffin Creek and the second over Brush Creek. UPDATE 10/29/15: scope changed from rehab (deck overlay, rehab abutments to semi-integral, repair appr SWILUS00006**C 20.460 20.470 2,200,000.00 WIL US 6 20.46/21.73 Bridg Replace exisitng 2 structures on US-6, perform necessary The first structure is over Tiffin Creek and the second over Brush Creek. UPDATE 10/29/15: scope changed from rehab (deck overlay, rehab abutments to semi-integral, repair appr SWILUS00006**C 21.730 21.740 96003 WOO SR 64 0.34 Bridge Replace wearing surface and approach slabs of WOO-64 bridge over I-75; perform necessary related work SWOOSR00064**C 0.340 0.350 600,000.00 96010 LUC SR 51 12.85 Bridge Re Redeck bridge over US23/SR51 SB; perform necessary related Work will include: parapets, vandal fence, light pedestals, and sidewalks. Consultant selected "Structure Point" SLUCSR00051**C 12.850 12.860 2,800,000.00 97011 FUL SR 2 14.90 Resurf in Resurface SR-2 in City of Wauseon; perform necessary related SFULSR00002**C 14.900 16.110 08/01/18 450,000.00 97425 SE 224 8.48 Culvert Replace one culvert on SE-224 @ SLM 8.48 (8'x3.5'58' Slab Top); perform necessary related work SSEUS00224**C 8.480 8.490 150,000.00 97957 WOO SR 281 12.64 Bridge Redeck SR-281 bridge in Wood over I-75; perform necessary SWOOSR00281**C 12.640 12.650 1,313,000.00 98929 WOO SR 25/64 in BG Pav Rehabilitation of Main St (SR-25) and Wooster St (SR-64) in downtown the City of Bowling Green; Perform necessary FIELD REVIEW REQUIRED. SWOOSR00025**C 9.550 961,650.00 WOO SR 25/64 in BG Pav Rehabilitation of Main St (SR-25) and Wooster St (SR-64) in downtown the City of Bowling Green; Perform necessary FIELD REVIEW REQUIRED. SWOOSR00064**C 2.080 2.250 98930 LUC Sylvania Ave Rehab in Rehabilitate the pavement of Sylvania Ave; perform necessary FIELD REVIEW REQUIRED. CLUCCR00005**C 13.410 15.280 2,552,000.00 98932 LUC Glendale Resurf Mill and resurface existing asphalt pavement including full depth pavement repairs; perform necessary FIELD REVIEW REQUIRED. CLUCCR00503**C 0.360 593,280.00 98953 LUC Woodruff Ave Resurf Mill and resurface existing asphalt pavement including full depth pavement repairss, minor walk upgrades, minor drainage improvements, and curb repairs as needed; perform necessary FIELD REVIEW REQUIRED. CLUCCR00546**C 0.060 1.290 1,200,000.00 99000 LUC Summit St Enh Summit St enhancement; perform necessary related work; FIELD REVIEW REQUIRED. SLUCSR00065**C 3.660 5.250 05/01/19 760,000.00 Page 4

99004 WOO. Baltimore CBD En Downtown orth Baltimore enhancement; perform necessary related work; FIELD REVIEW REQUIRED TWOOTR00134**C 0.900 1.530 05/01/19 540,100.00 99587 HE 281/18 0.00/0.00 Resu Resurface SR-281 and SR-18 in Henry ; perform necessary SHESR00281**C 9.910 2,100,000.00 HE 281/18 0.00/0.00 Resu Resurface SR-281 and SR-18 in Henry ; perform necessary SHESR00018**C 5.690 99588 Resurface SR-163 in Ottawa ; perform necessary 29.540 3 2,600,000.00 Resurface SR-163 in Ottawa ; perform necessary 39.500 41.430 Resurface SR-163 in Ottawa ; perform necessary 31.120 39.500 Resurface SR-163 in Ottawa ; perform necessary 3 31.120 99731 LUC IR 475 1.85 @20A Inter Build a new interchange in Lucas at I-475 and US-20A; perform necessary See PID 96484 for AER. 1.150 3.140 19,000,000.00 LUC IR 475 1.85 @20A Inter Build a new interchange in Lucas at I-475 and US-20A; perform necessary See PID 96484 for AER. SLUCUS00020*AC 10.200 11.000 99871 LUC US 24 18.56 arrow arrow Detroit Ave from an existing 4/5 lanes to 3 lanes with street parking; Signalized intersections changed to single lane roundabouts; perform neceesary related work; FIELD REVIEW REQUIRED. SLUCUS00024**C 18.560 19.230 3,134,000.00 100194 LUC US 24 20.07 Urban Pav An urban paving project on US24 in Toledo to perform reconstruction of the pavement. UPDATE (4-28-15): deleted piece from City limit (18.59) to Copland (19.23) which is funded by TMACOG, PID 99871. SLUCUS00024**C 20.070 20.610 04/15/19 500,000.00 100196 LUC SR 184 2.40 Urban Pav Resurface Alexis (SR-184) Rd from Talmadge to Secor in Toledo; perform necessary SLUCSR00184**C 2.400 3.510 1,212,500.00 101033 WOO Maple St.. Baltimor SRTS project in the Village of orth Baltimore consisting of sidewalk and crossing improvements along the orth side of Maple Street from Rhoades Avenue to Rudolph Road; upgrade signage and markings. Perform necessary 05/01/19 308,000.00 101072 D02 PM F2019 A pavement marking maintenance contract; perform necessary 16.420 2,300,000.00 101073 D02 RPM F2019 A raised pavement markers (RPM) maintenance program; perform necessary SWOOIR00475**C 4.010 250,000.00 101096 WOO Various Deck Sealing Deck sealing of various bridges in Wood ; perform necessary 847,294.80 101127 D02 SIG F2019 Freeway systematic sign replacement; perform necessary SLUCIR00075**C 11.860 500,000.00 101148 D02 TSG F2019 A district allocation funded project to maintain/upgrade existing traffic signals distric wide; perform necessary 18.360 250,000.00 101150 101159 101161 D02 BH F2019(A) D02 BH F2019(B) D02 BH F2019(C) Rehab various bridges; perform necessary Rehab various bridges; perform necessary related work Rehab various bridges; perform necessary 2,500,000.00 2,500,000.00 2,500,000.00 Page 5

101211 HE SR 108 17.66 Resurfa Resurfacing existing SR 108 in Henry from slm 17.66 to 22.72. SHESR00108**C 17.660 18.830 450,000.00 HE SR 108 17.66 Resurfa Resurfacing existing SR 108 in Henry from slm 17.66 to 22.72. SHESR00108**C 18.830 22.720 101213 necessary 1.710 3.080 1,000,000.00 necessary 3.080 7.360 necessary 7.360 9.720 necessary 10.280 10.850 necessary 10.280 necessary 9.720 necessary 11.180 11.370 necessary 10.850 11.180 101215 SA US 20 0.00 Resurfacin Resurfacing US 20 from slm 0.00 to 2.24; perform necessary SSAUS00020**C 2.240 430,000.00 101217 SE US 224 1.63 Resurfaci SSESR00101**C 1.640 5.620 2,000,000.00 SE US 224 1.63 Resurfaci SSEUS00224**C 19.880 29.540 SE US 224 1.63 Resurfaci SSEUS00224**C 19.830 19.880 SE US 224 1.63 Resurfaci SSEUS00224**C 29.540 29.580 101219 WIL US 127 0.00 Resurfaci Resurfacing US 127 from slm 0.00-1.94 and slm 18.96-19.08; perform necessary SWILUS00127**C 0.330 390,000.00 WIL US 127 0.00 Resurfaci Resurfacing US 127 from slm 0.00-1.94 and slm 18.96-19.08; perform necessary SWILUS00127**C 0.330 1.940 WIL US 127 0.00 Resurfaci Resurfacing US 127 from slm 0.00-1.94 and slm 18.96-19.08; perform necessary SWILUS00127**C 18.960 19.080 101221 101222 WOO SR 199 18.70 Resurf WOO SR 199 18.70 Resurf WOO SR 582 16.35 Resurf Resurfacing SR 199 from slm 18.70 to 28.97 Resurfacing SR 199 from slm 18.70 to 28.97 Resurfacing SR 582 from slm 16.35 to 18.36; perform necessary SWOOSR00199**C SWOOSR00199**C 18.700 27.990 16.350 27.970 28.970 18.360 550,000.00 90,000.00 101233 HE/WOO 281/65 9.91/19. Resurfacing SR 281 in Henry C. slm 9.91-17.95 and SR 65 in Wood C. slm 19.33-22.50; perform necessary SHESR00281**C 9.910 17.950 1,430,000.00 HE/WOO 281/65 9.91/19. Resurfacing SR 281 in Henry C. slm 9.91-17.95 and SR 65 in Wood C. slm 19.33-22.50; perform necessary SWOOSR00065**C 19.330 22.430 Page 6

101241 SE SR 4 0.00 Resurfacing Resurface SR 4 from slm 0.00 to 5.78; perform necessary SSESR00004**C 4.240 640,000.00 SE SR 4 0.00 Resurfacing Resurface SR 4 from slm 0.00 to 5.78; perform necessary SSESR00004**C 4.240 4.940 SE SR 4 0.00 Resurfacing Resurface SR 4 from slm 0.00 to 5.78; perform necessary SSESR00004**C 4.940 5.780 101243 FUL SR 120 9.48 Resurfaci Resurface SR 120 from slm 9.48-14.12; perform necessary SFULSR00120**C 9.480 14.120 470,000.00 101556 LUC SR2 18.62 Dehumidify Install a dehumidification system for the existing cable with new round wire wrap at sections previously opened, new elastomeric wrap over the entire length of the cables and acoustic monitoring system; perform necessary See PID 80551 for re 7,900,000.00 101863 WOO Maumee River MUP Maumee River Multi-use path Phase 3 & 4; perform neccasry See PID 99001 for Ph 2. SWOOSR00065**C 2 21.000 01/30/19 818,028.00 101895 LUC SR 64 0.26 Urban Pav Resurface SR-64 in the City of Waterville under the urban paving program; perform necessary Quantity splits may be required. SLUCSR00064**C 0.260 0.320 07/12/18 446,200.00 LUC SR 64 0.26 Urban Pav Resurface SR-64 in the City of Waterville under the urban paving program; perform necessary Quantity splits may be required. SLUCSR00064**C 0.420 1.380 07/12/18 102032 LUC SR 51 9.01 (Secor/Mon A safety funded proejct to upgrade signal timing, install back plates, add right turn lane on B secor to EB Monroe St, construct median islands for access management and resurface pavement; perform necessary SLUCSR00051**C 9.010 9.100 02/01/19 1,166,400.00 102033 LUC SR 51 10.35 Monroe/T A safety funded project to add dual left turn lanes from EB Monroe St to B Talmadge Rd; upgrade traffic signals; reconfigure raised median islands; consolidate driveway access points; perform necessary SLUCSR00051**C 10.350 10.360 05/15/19 1,115,000.00 102038 LUC Old State Line Rd Res Resurface Old State Line Road in Lucas ; perform necessary CLUCCR00034**C 1.970 08/31/18 692,000.00 102226 102275 OTT SR 2 27.35 Slope Rep SE CR Var RPM F2019 Repair slope failure; perform necessary A CEAO funded project to install raised pavement markers (RPM) on various county routes in Seneca county; perform necessary SOTTSR00002**C CSECR00001**C 27.350 27.360 0.650 08/20/18 375,000.00 50,000.00 102276 SE CR Var PM F2019 A CEAO funded project to paint pavement markings on various county routes in Seneca county; perform necessary related CSECR00003**C 4.070 08/30/18 50,000.00 102278 SE CR Var GR F2019 A CEAO funded project to install/repair guardrails on various routes in Seneca ; perform necessary CSECR00001**C 0.650 07/30/18 200,000.00 67 $135,578,590 Page 7