November 13 Charrette Feedback Meeting WELCOME

Similar documents
Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Table #6 VISION CHARACTERISTICS

Rock Spring Kick-Off Meeting 09/01/15 Walter Johnson High School Break Out Table Summaries. Rock Spring Break Out Table Comments. Table 1: Strengths:

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

TRANSPORTATION STANDARDS

Sixth Line Development - Transit Facilities Plan

Capital Crescent Trail Crossing at Little Falls Parkway

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Implementation challenge 2: Is there room for Complete Streets? Does street classification enable Complete Streets?

September The State of Bicycling in Montgomery County

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

4. Action Plan & Projects

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Major Bike Routes 102 Avenue Workshop April 21, 2015

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Carmel, Indiana Illinois Street and 126th Street Westfield Boulevard and 96th Street Arts and Design District RAB

Presentation Comments and Questions

Montgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Blair/Williamson Intersection Expressed Needs

Fitting Light Rail through Well-established Communities

TRANSPORTATION COMMISSION Agenda Staff Report

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

COMMUNITY CHOICES EVENTS High Schools. February 13-22, 2014

CHAPTER 1 INTRODUCTION

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Completing the Vision

The Naples Park Community Plan DRAFT- MARCH 2003

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

The Atlanta BeltLine. Quarterly Briefing December @atlantabeltline. Eastside Trail Southern Extension

Ann Arbor Downtown Street Plan

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

burlington MobIlITY Hubs study Aldershot GO Mobility Hub

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Summaries from the Concentric Circle Exercises 10 Neighborhood Forums held in April and May 2018 Various locations around Town

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

including infrastructure, transit and open space, Open Space changed approximately 50 to approximately 60

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

STONY PLAIN ROAD STREETSCAPE

PUBLIC REALM MASTER PLAN

Terwillegar Drive Expressway Draft Concept Plan

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

5 CIRCULATION AND STREET DESIGN

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

York Boulevard Streetscape Master Plan

Plant City Walk-Bike Plan

Chapter 5 Future Transportation

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

5 Circulation & Parking

Application of a Complete Street

McLean Main Street Public Forum Follow-up

Land Use and Transportation Town Hall September 17, 2018

Bridges and Arizona Crossings

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

East Pasadena Specific Plan Area Community Walking Tour

APPENDIX D COST SUMMARY TABLES

Virginia Hospital Center Expansion

Summary Community Workshop #4 Beacon Day School Saturday, July 11, :00 a.m. 12:00 p.m.

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Northside Livable Centers Study

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

San Jose Transportation Policy

CLOSED. Highlights of the Final Concept Design:

Approaches. Livable Neighborhood Design. Examples. Traditional neighborhood development. CE 594 University of Wisconsin- Milwaukee

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

Healthy Corridors. Ed McMahon Urban Land Institute Nashville, TN

Fields of St. Croix HOA Meeting. October 27, 2016

Basalt Creek Transportation Refinement Plan Recommendations

Tempe Streetcar Public Meeting

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Chapter 13 ORANGE COVE

I-290 Phase I Study Village of Forest Park November 9, of 25

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

STADIUM DISTRICT CENTER PLATFORM TACOMA LINK EXPANSION. Existing bus stop remains. Existing parallel parking removed for bus access.

The Wiggle Route in Context

Chapter 5. Complete Streets and Walkable Communities.

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

3.0 Future Conditions

College Green traffic management changes

STUDY ADVISORY COMMITTEE. October 8, 2015

DATE: June 22, General Release SUBMITTED BY: LAND DEVELOPMENT SERVICES. RE: City Centre Survey Results

Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan. Citizens Advisory Committee Meeting July 21, 2015

Transcription:

WELCOME 1

New Vision and Goals the Big Picture Maintain the Best Qualities of Westbard Preserving the smaller scale Low Density Mixed-Use Diversity Affordability 1

Westbard Framework Concept Presentation Follow up November 13, 2014

Scheme 1 WHAT WE HEARD PROS: Grid of streets at Equity One Reconfiguration of Ridgefield New Traffic Signal at River and CCT Neighborhood Greens Daylight Willett Branch CONS: New Road between River and Westbard at Crown R.O.W. Road through American Plant Food Green Space new Blvd on Kenwood Place property Connection through Episcopal School Retail focused only on Westbard and River

Scheme 2 WHAT WE HEARD PROS: Grid of streets at Equity One Reconfiguration of Ridgefield New Traffic Signal at River and CCT Neighborhood Greens Daylight Willett Branch Library relocated to Equity 1 property CONS: New Road between River and Westbard at Crown R.O.W. Some concern about E.S. School at Westland MS property Retail focused only on Westbard and River

Scheme 3 WHAT WE HEARD PROS: Grid of streets at Equity One Reconfiguration of Ridgefield New Traffic Signal at River and CCT Neighborhood Greens Daylight Willett Branch Library relocated to Equity 1 property New E.S. School at library site CONS: Some concern about E.S. School at Westland MS property Connection through Episcopal School Extension of Westbard along stream valley Retail focused only on Westbard and River New School

Concept 1

Concept 1 Westbard Avenue Buildings on Ridgefield and north side of Westbard up to 100 Daylight Willett Branch Maintain CCT road between River and Westbard with relocated access on Westbard Park Bethesda site allow up to 120 Tower

Concept 1 Westbard Avenue Buildings on Ridgefield and north side of Westbard up to 100 Giant Food Site up to 50 Library at Giant site New School at Library site Additions to Westland MS Modify Westbard Circle Retail at Westbard and Square

Concept 1 River Road Buildings on River Road up to 75 New Dorsey street to Little Falls Parkway New Green at Whole Foods Site Residential over Grocery Store at Whole Foods site/structured parking Wide pedestrian friendly sidewalks Retail along River Connection from Butler Road to Little Falls PKW Pedestrian Connections from River Road to Willett Branch trail Access Road to Westbard past Willett Branch along CC Trail with better pedestrian access

Concept 2

Concept 2 Westbard Avenue Buildings on Ridgefield and north side of Westbard up to 75 Giant Food Site up to 50 along Westbard Daylight Willett Branch Modify Westbard Circle Retail along Westbard and on Square Park Bethesda Site up to 75

Concept 2 Westbard Avenue Library remains at existing site Connection between River and Westbard at Westwood Tower Possible New School site at Ridgefield and River Road

Concept 2 River Road Buildings on River Road up to 50 New Green at Whole Foods Site Residential over Grocery Store at Whole Foods site/structured parking Wide pedestrian friendly sidewalks Connection from River to Westbard at Exist. Bridge Loop Clipper Lane to Landy Lane Connect Butler Road to Little Falls Road Pedestrian Connections from River Road to Willett Branch trail Access Road to Willett Branch along CC Trail with better pedestrian access

Concept 1 Concept 2

Discussion