Transportation Assessment

Similar documents
WELCOME TO OPEN HOUSE # 1 June 14, 2017

Transportation Master Plan Advisory Task Force

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Public Event 1 Community Workshops

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

York Region Population and Employment Growth

7 Yonge and Steeles Area Regional Transportation Study City of Markham and City of Vaughan

PG29.6 REPORT FOR ACTION. Downtown Mobility Strategy SUMMARY

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Hennepin County Bicycle and Pedestrian Planning

City of Waterloo Complete Streets Policy

PEDESTRIAN ACTION PLAN

122 Avenue: 107 Street to Fort Road

Ann Arbor Downtown Street Plan

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Bicycle Master Plan Goals, Strategies, and Policies

Major Bike Routes 102 Avenue Workshop April 21, 2015

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Appendix 1 Transit Network Analysis

DUNDAS WEST-BLOOR Mobility Hub Profile

Tonight is for you. Learn everything you can. Share all your ideas.

DON MILLS-EGLINTON Mobility Hub Profile

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

10.0 CURB EXTENSIONS GUIDELINE

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Welcome. Background. Goals. Vision

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

PEDESTRIAN ACTION PLAN

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

2.0 LANE WIDTHS GUIDELINE

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Chapter 5 Future Transportation

NEWMARKET CENTRE Mobility Hub Profile

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Workshop Feedback Report

Environment and Public Works Committee Presentation

NORTH YORK CENTRE Mobility Hub Profile

Complete Streets. Designing Streets for Everyone. Sarnia

Welcome! Public Open House on UBC s Transportation Plan

Leaside Traffic Calming Plan Update. Community Meeting 2 November 22, :00 PM

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Public Works and Infrastructure Committee. General Manager, Transportation Services

West Village Mobility & Integration

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Transportation Master Plan April 2017 i

DON MILLS-SHEPPARD Mobility Hub Profile

STONY PLAIN ROAD STREETSCAPE

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Welcome. If you have any questions or comments on the project, please contact:

Building sidewalks on local streets to reduce accessibility barriers

Complete Streets Policy Framework

San Jose Transportation Policy

Submission to Metrolinx on Eglinton LRT - East End. Response to December 2012 Public Meeting

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

APPENDIX B. TDM Existing Conditions

Frequently Asked Questions (FAQ)

TRANSPORTATION NEEDS ASSESSMENT

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Kitchener Integrated Transportation Master Plan

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

Appendix B Workshop Materials

Appendix A-K Public Information Centre 2 Materials

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

Terwillegar Drive Expressway Draft Concept Plan

Better Market Street Project. Project Update January 15, 2015

Active Transportation Infrastructure Investment A Business Case

Governance and Priorities Committee Report For the July 2, 2015 Meeting

City of Charlottesville Bicycle and Pedestrian Master Plan Update

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017

Highway 56 Traffic Study Rymal Road to Cemetery Road

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

ACTIVE TRANSPORTATION

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

CHAPTER 3: Vision Statement and Goals

Community Task Force July 25, 2017

SCARBOROUGH CENTRE TRANSPORTATION MASTER PLAN (SCTMP)

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

4 Ridership Growth Study

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Access BART: TOD and Improved Connections. October 29, 2008

Ajax: The Road to Complete Streets

Pedestrian Crosswalk Audit

PROPOSED BYLAW UPDATES AND FEES FOR SIDEWALK CAFÉS & MARKETING DISPLAYS

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Existing Pedestrian Conditions. PSAC February 8, 2011

CPC Parking Lot Riverside Drive. Transportation Rationale

CONNECTING PEOPLE TO PLACES

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Public Information Centre

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Complete Streets Successes, Opportunities, and Challenges

Transcription:

Transportation Assessment Midtown Open House February 10, 2018

Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis Key Issues/Challenges Focus Areas Next Steps + Workshop Key Next Steps What are we asking for feedback on today?

Midtown-in-Focus Overview

Midtown in Focus : Study Overview The Yonge-Eglinton area has experienced significant growth and change in the last decade. Midtown in Focus is a comprehensive planning study to ensure the ingredients of a livable community are aligned with future growth. The Study will result in: Updates to the Yonge-Eglinton Secondary Plan policies and maps Infrastructure assessments to identify improvements needed to support future growth A Proposals Report was brought forward and adopted by City Council in Fall 2017.

Midtown in Focus: Study Timeline

Midtown in Focus: Study Scope

Midtown in Focus: Vision & Objectives

Midtown in Focus: Growth Estimates

What is the Transportation Assessment? Supports the vision, goals, and policies of the Yonge-Eglinton Secondary Plan and is closely aligned with the Parks & Public Realm Plan Primarily about identifying local transportation needs within the Yonge-Eglinton Area to improve mobility in and through the area (e.g. it is not about solving crowding on the Yonge subway line) Will Identify a range of transportation infrastructure improvements to safely move people in and around the area and support a shift to active and sustainable travel modes in context of the anticipated growth and completion of the Eglinton Crosstown LRT Will assist in aligning transportation infrastructure capital planning with long-term growth, and inform the review of development applications in the area

Midtown Transportation Assessment: Local Area Planning Official Plan (policies + maps) City-Wide Rapid Transit Network Planning (Relief Line, Smart Track, GO RER, etc) Eglinton Crosstown LRT & Eglinton Connects Planned Operational Improvements (Line 1 Automatic Train Control) Vision Zero Road Safety Plan 10 Year Cycling Network Plan Complete Streets Guidelines And others Secondary Plan (policies + maps) Integrated land use planning framework and local transportation improvements Improving local transportation networks and connections with surrounding city networks Improving range of mobility choices Targeted walking and cycling improvements And more

City-Wide Rapid Transit Network Planning

Eglinton Connects

Eglinton Connects

Midtown Transportation Assessment

Transportation Assessment: Phases of Work

Phase 1 Summary: Background Review & Analysis Existing planning policies & guidelines: Provincial Growth Plan, Metrolinx Regional Transportation Plan, City of Toronto Official Plan, City-wide rapid transit planning, Eglinton Connects, Mobility Hub Guidelines, Complete Streets Guidelines, etc. Travel trends and characteristics: Analysis of TTS data, Census data, travel time analysis, trip distribution, mode share, etc 2017 Midtown Travel Survey: An online survey of area residents and workers to assist in developing a more current snapshot of movement trends and characteristics in Midtown Safety data: Historical collision data for the area Traffic data: Intersection traffic volumes and intersection capacity analysis, origin-destination trends for through traffic, etc Pedestrian and cycling data: Intersection pedestrian and cycling volumes, inventory of sidewalk widths, area walkshed analysis and mapping, inventory of existing cycling infrastructure, review of planned 10- Year Cycling Network Plan, etc Transit ridership data: TTC subway ridership and capacity data

Key Issues + Challenges

Key Issues + Challenges 1. Future population and employment growth will continue to increase demand for travel into, out of and within Midtown, putting more pressure on existing transportation and transit infrastructure New development in Midtown should help create a compact, transitsupportive community with a mix of land uses that support more sustainable transportation choices to help reduce auto dependency

Key Issues + Challenges 2. Midtown is a built up urban environment with limited street space Redesign key streets to move more people more efficiently and achieve mobility and placemaking objectives

Key Issues + Challenges 3. Significant auto traffic congestion occurs during rush hours, but is mostly through traffic generated from outside the local Midtown area Continue to reduce auto traffic generated within Midtown and better manage auto traffic congestion and curbside activity

Key Issues + Challenges 4. Many people in Midtown are choosing to drive for short, local trips Improve local walking and cycling infrastructure to encourage more people to walk and cycle for short trips

Key Issues + Challenges 5. Future growth will result in more people walking and cycling, but key streets and intersections are currently designed mainly for cars Pedestrian and cycling improvements are needed on several key streets and at major intersections to provide more space and improve safety

Key Issues + Challenges 6. The area generally has a fine grain street network for pedestrian and cycling connectivity, but there are some larger blocks More mid-block and street connections are needed to improve permeability within and through the area

Key Issues + Challenges 7. Increasingly more people will live or work within close distance to a rapid transit station Walking and cycling improvements are needed to improve access to and from neighbourhoods outside the immediate station areas. Additional mobility choices should be provided as part of stations and new developments: car-sharing, bike sharing, etc

Key Issues + Challenges 8. There are significant crowding issues during the rush hours on the Yonge subway line Operational improvements and city-wide rapid transit network planning initiatives are underway to address crowding and capacity issues

Key Issues + Challenges 9. There are gaps in the cycling network within Midtown and a lack of connections with the surrounding city-wide cycling network Build on the 10-year Cycling Network Plan to identify new or upgraded cycling routes and make a more complete cycling network in the area

Key Issues + Challenges 10. Transportation technology is rapidly evolving and people s travel behaviour will also change over time with flexible work hours and locations New technology like automated or electric vehicles, is appealing, but it isn t a silver bullet that will solve the city s transportation challenges. In some cases, it could cause more traffic congestion. It s important to plan for emerging technologies, but ensure that the vision and goals for Midtown are maintained

Midtown Secondary Plan: Proposed Policies & Maps

Proposed Policy Directions Move people and goods more efficiently Provide a mix of compact land uses to reduce the need to travel longer distances Prioritize transit and active transportation infrastructure to reduce auto-dependency Design streets as more complete to improve walking and cycling networks, connections to transit, and safety for the most vulnerable Provide more pedestrian amenities (benches, etc) and endof-trip cycling facilities (eg, benches, bike parking, trees, etc) Expand Toronto Bike Share program into Midtown Secure mid-block connections within large development sites A proposed Pedestrian Network Map and Cycling Network Map

Cycling Network Map

Pedestrian Network Map

Focus Areas

What are Focus Areas? Recognizes and builds on City transportation initiatives underway or recently completed Addresses key transportation issues and challenges facing Midtown Proposes a range of recommended transportation infrastructure opportunities Informs development of future Implementation Strategy Four types of Focus Areas: Midtown-Wide Key Streets or Corridors Areas of Growth Stable Neighbourhoods

Focus Areas 1. Midtown-Wide 2. Key Streets or Corridors A. Yonge Street B. Eglinton Avenue C. Redpath Avenue D. Mount Pleasant Road E. Davisville Avenue/ Chaplin Cres. F. Bayview Avenue G. Duplex Avenue 3. Areas of Growth A. Roehampton Common B. Soudan West Common C. Areas around rapid transit stations 4. Stable Neighbourhoods

Focus Areas: Midtown-Wide Potential Solutions Implement Toronto s Vision Zero Road Safety Plan Implement10-Year Cycling Network Plan and any New Cycling Connections Identified through Midtown In Focus Expand Toronto Bike Share into Midtown Secure Electric Vehicle Charging Infrastructure and Transportation Demand Management (TDM) Measures in New Developments Review Parking Standards for Developments Around Transit Stations Implement Curbside Management Strategies

Focus Areas: Streets

Focus Areas: Streets Planned/Approved Improvements Park Street Loop and Midtown Greenways in 2014 Midtown Public Realm Plan Eglinton Crosstown LRT & stations under construction Eglinton to be reconstructed as a complete street w/ wide sidewalks, cycling facilities, trees starting between Avenue Road to Mount Pleasant Road Eglinton Green Line in 2014 Parks, Open Space and Streetscape Master Plan

Focus Areas: Streets Potential Solutions Make operational and pedestrian improvements at intersections Optimize on-street parking restrictions to improve on-street efficiency Restrict left turns along key pedestrian corridors Reduce speed limits on streets to 30km/hr Implement streetscape improvements (curb to building face) Reduce on-street parking and reclaim space for pedestrian amenity Revisit pedestrian scramble intersection at Yonge and Eglinton and introduce at other busy intersections Provide continuous sidewalks uninterrupted across minor, unsignalized intersections Provide dedicated cycling lanes on key streets by reducing lane widths and/or vehicular lanes Redesign and reconstruct streets as complete streets

Potential Solutions Focus Areas: Streets

Focus Areas: Areas of Growth Planned/Approved Improvements Park Street Loop and Midtown Greenways in 2014 Midtown Public Realm Plan

Focus Areas: Areas of Growth Potential Solutions Secure mid-block connections as part of new development Secure shared public parking in first level underground garages of new development Change on-street parking restrictions Implement bike share stations at key locations Improve entrances to existing rapid transit stations Implement the Park Street Loop and Midtown Greenways as part of development Redesign Cowbell Lane as a shared street to improve pedestrian and cyclist safety Widen sidewalks on local streets to accommodate increased pedestrian traffic Narrow vehicular lanes on Broadway, Roehampton and Soudan

Focus Areas: Stable Neighbourhoods Potential Solutions Widen sidewalks to improve accessibility and as maintenance occurs on streets Provide dedicated space for cycling lanes on key local streets to provide enhanced access to destinations Implement innovative traffic calming measures

Potential Solutions Focus Areas: Stable Neighbourhoods

Next Steps + Workshop

Next Steps Identify, map, and catalogue the focus areas, taking into account the City's growth estimates Finalize transportation policies and maps in the Secondary Plan Inform future Implementation Strategy Report to City Council

Workshop Activity 1: Focus Areas (10 Minutes) Are there focus areas you think we ve missed? What are they and how do you think they will improve movement? Identify problem areas with a red dot and write down key issues on a sticky note. Activity 2: Streets Dotmocracy (15 Minutes) Identify the measure or measures you think should be implemented and prioritized for streets in Midtown with a GREEN dot. Use a YELLOW dot to identify solutions you think are not absolutely necessary, but would be nice to have Activity 3: Pedestrian and Cycling Network (15 Minutes) What do you think of the proposed Pedestrian and Cycling Network? Have we missed any important connections?