WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Similar documents
I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Thank you for attending

Frequently Asked Questions

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Proposed Action, Purpose and Need Technical Memorandum

Programmatic Categorical Exclusion Update Question & Answers

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Non-Motorized Overpass at SR 5/US1

CTDOT Pedestrian and Bicycle Safety Initiatives

MASTER BICYCLE AND PEDESTRIAN PLAN

Active Transportation Facility Glossary

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

Access Management Regulations and Standards

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Access Management Regulations and Standards

Off-Road Facilities Part 1: Shared Use Path Design

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Welcome! San Jose Avenue Open House August 25, 2015

Public Information Meeting #1. Pā ia Community Center 5:30 PM 8:00 PM

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Work Zone Pedestrian & Cyclist Accommodation in Washington, DC

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

Fairfax County Parkway Widening Fairfax County

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

Road Diets. Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

APPENDIX L: COST ESTIMATING TOOLS

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

6.4 RECOMMENDED IMPROVEMENTS

Potential Bicycle Facility on Bayou Street Mobile, Alabama

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Blair/Williamson Intersection Expressed Needs

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Safety Evaluation at Innovative Geometric Designs Gilbert Chlewicki, PE Advanced Transportation Solutions

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Route 29 Solutions Projects

Application of a Complete Street

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Public Information Meeting

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

Route 47 (North Main Street) Reconstruction

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CTH M HIGHWAY PROJECT CTH Q to STH 113

Building Great Neighbourhoods LANSDOWNE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Construction Specifications Manual

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

CTH M Reconstruction

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Cycle Track Design Best Practices Cycle Track Sections

Small Town & Rural Multimodal Networks

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Welcome! Urban Work Zone Design. Training Course 0-1

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

South Carolina Department of Transportation. Engineering Directive

Legislative Update Williamsburg Residency

Transportation Planning Division

Safety Impacts: Presentation Overview

2017 Temporary traffic control guidelines for pedestrians. v.2

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Tonight is for you. Learn everything you can. Share all your ideas.

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

Multimodal Through Corridors and Placemaking Corridors

Financial Project ID No(s).: and ETDM No(s).: and 14181

Souder, Miller & Associates 401 W. Broadway Farmington, NM

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Characteristics of. Entering & Exiting High Speed Considerations

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Devonport City Cycling Network Strategy

On Road Bikeways Part 1: Bicycle Lane Design

Living Streets Policy

Transcription:

WELCOME FM 2818 (Harvey Mitchell Parkway) Open House Tuesday, Nov. 14, 2017 Why am I here? Review the planned improvements Provide comments on the proposed project The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 16, 2014, and executed by FHWA and TxDOT.

Proposed Improvements The project limits are from 0.5 miles north of FM 60 (Raymond Stotzer Parkway) to FM 2154 (Wellborn Road), with a length of 3.2 miles Convert the existing four-lane rural highway to a six-lane urban street (three lanes north, three lanes south, separated by a median) Convert intersections at FM 2347, Luther Street, and Holleman Drive to a Super Street design Facilitate safer access to side streets turning from FM 2818 by means of signalized left-turn lanes using this Super Street design Improve safety by separating traffic directions with either a center concrete traffic barrier or grass median Upgrade pedestrian and bicycle facilities by providing an on-street bike lane in each direction and a 12 ft. shared-use path (dedicated and separated paths that protect pedestrians and bicyclists from vehicle traffic) on each side of the roadway with crossovers at major intersections Extend drainage structures and add storm drain system Increase clearance underneath the FM 60 bridge, which is an adjacent improvement under construction the FM 60 (Raymond Stotzer Parkway) overpass improvement project

Comparison of Travel Conflict Points The following represents a graphic representation of the number of travel conflict points (turn conflicts), comparing the existing intersection design vs. the proposed Super Street intersection design Images represent the intersections located at the FM 2347 (George Bush Drive), Holleman Drive and Luther Street The 32 conflict points from the existing intersection design are reduced to 14 conflict points with the proposed Super Street design Existing Intersection Design Proposed Intersection Design Crossing Merging Diverging Diagram Credit: Federal Highway Administration

Proposed Intersection Turning Movements The following represents the proposed turning movements that shows how vehicles, bicyclists and pedestrians would turn and cross with the proposed Super Street design Colored arrows represent the new turning movements under the proposed plan at the FM 2347 (George Bush Drive), Holleman Drive and Luther Street intersections Turning right directly from cross street Turning right onto cross street or continuing straight To continue on cross street turn right, utilize the turnaround and then turn right back onto cross street Bicyclists and pedestrian crossing movement To turn left from the cross street turn right and utilize the turnaround to head left To turn left onto cross street turn left at the turn lane to continue Diagrams credit: Wikipedia, Super Street Designs

FM 2818 Open House Online Engagement Station Submit your Feedback Take our quick online survey Add your comments directly to the online project map Access the survey here or on your phone or tablet by scanning with your Quick Response (QR) code reader: Once survey is completed: Please help us gain more feedback and share the link through email or social media!

How Can I Provide Input and Stay Informed? Visit the online engagement station and submit the online survey Turn in the comment form today, or you can mail or email the form afterward (comment deadline is on or before Nov. 27, 2017) Email questions and/or comments to: Neal.Riddle@txdot.gov Call: (979) 778-2165 with any questions Follow us on the TxDOT Bryan District Twitter site for closure and detour information: @TxDOTBryan Visit www.txdot.gov and Search: FM 2818; or, scan with your phone or tablet using the Quick Response (QR) code reader: