WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Similar documents
WHEATLEY Series 500 Swing Check Valve

WHEATLEY Series 822/820 Swing Check Valve

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

INSTALLATION, OPERATION and MAINTENANCE MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

VALVES & MEASUREMENT

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

TITAN FLOW CONTROL, INC.

WKM Model 320F Floating Ball Valve

Engineering Data Sheet

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

Horizontal Bladder Tanks

LRS(H)4 Pressure-Reducing Regulator User Manual

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Vertical Bladder Tanks

1.0 - OPENING AND CLOSING THE DOOR

Model MTB-ASME Vertical Bladder Tanks

Model MTB-ASME Horizontal Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Atmospheric relief valve type 1100 Installation and maintenance instructions

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

BUTTERFLY VALVES Series 800

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Gauge Hatch SECTION I SECTION II

PC3_ and PC4_ Pipeline Connectors

Pressure Dump Valve Service Kit for Series 2300 Units

Installation, operation & maintenance manual - original version

MEGR-1627 Instruction Manual

MUD 1. Vent check valves. Instruction and maintenance manual.

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

Type CT88 Backpressure Regulator

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Pressure Dump Valve Service Kit for Series 3000 Units

Installation Operation Maintenance

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

CA10S, CA14 and CA14S Air and Gas Traps

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Types 95L and 95H Pressure Regulators

TECHNICAL DATA CAUTION

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation Troubleshooting Maintenance Instructions Installation / Start-up

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Manual Actuated Boiler Blowdown Valves

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

Product Bulletin No.: D99-RRV2015-PIB-001

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

1800C and 1800C-HC Series Service Regulators

MEGR-1912 Instruction Manual

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

ARGUS MODEL C PIG VALVE

Installation, Operation, and Maintenance Manual

Model VR6 System. Installation, Operation & Maintenance

1200B2 Series Service Regulators. Instruction Manual

CRP Ltd INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SYRINGE SAMPLING SYSTEMS

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Float Operated Level Controllers

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I

DelVal Flow Controls Private limited

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

1805 Series Relief Valves

1700ESL Kamvalok Coupler

SEries 29 Hydrant valves installation, operation & maintenance manual

Bermad Pressure Reducing. Model: 42T

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

Materials : Carbon steel ASTM A216 WCB

Combination Air Valve

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

GREIG FILTERS, INC. OPERATION MANUAL

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Type ACE97 Pad-Depad Valve

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

WW-720. Pressure Reducing Control Valve

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Type FEQ Slam-Shut Valve

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

Transcription:

WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE (DPV) WHEATLEY

TABLE OF CONTENTS WHEATLEY SERIES 500 SWING CHECK VALVE 1.0 Description... 1 2.0 Installation & Operation... 3 2.1 Horizontal Installation... 3 2.1.1 Operation... 3 2.2 Vertical Installation... 4 2.2.1 Operation... 4 3.0 Maintenance... 4 3.1 Disassembly... 4 3.1.1 Inspection... 4 3.2 Reassembly... 4 4.0 Maintenance Schedule... 5 5.0 Recommended Spare parts... 5 Cameron s Valves & Measurement Group 07/08

1.0 Description The flanged swing check valve (Figs.1 & 2) features a hinged stainless steel clapper with an O-ring seal. The design allows the clapper to swing freely from the fully closed position to the fully opened position and back. Two NPT plugs secure the hinge pin in a hole drilled through the body. The bonnet is bolted to the body and sealed with an O-ring. The bonnet includes a pressure relief vent plug (NPT threads). The swing check valve is a full bore type that will pass a sphere with a nominal size not less than that specified in Table 1 of API 6D. An optional removable seat (Fig.2) is secured in the valve bore with a retaining ring. Due to the critical nature of pressurized piping systems it is recommended that the compatibility to the service of the metallic and non-metallic components be confirmed prior to installation. This valve is not recommended for slurry service. FIGURE 1: INTEGRAL SEAT SWING CHECK EYE BOLT STUD NUT STUD VENT BONNET BONNET O-RING PIN BODY FLOW CLAPPER CLAPPER O-RING DRAIN 1

FIGURE 2: REMOVABLE SEAT SWING CHECK STUD NUT EYE BOLT STUD VENT BONNET BONNET O-RING PIN BODY FLOW CLAPPER REMOVABLE SEAT SEAT FACE O-RING SEAT O-RING CAUTION RETAINING RING READ CAREFULLY BEFORE INSTALLING OR OPERATING THE VALVE Hazards are inherent with the construction, operation and maintenance of high pressure piping systems. The following information and precautions are provided to minimize these hazards: 1. The valve's nameplate indicates maximum operating pressure, as well as minimum and maximum operating temperatures. The valve may be safely operated within these limits. 2. The valve's end connections are provided in accordance with ASME flanged end requirements. 3. These check valves have been certified as fire tested to API 6FD requirements. The user is responsible for the application of other devices to limit damages due to external fire, if required by local safety regulations. 4. The valve has been factory pressure tested based on the nameplate maximum operating pressure. 5. Valves 4" FP 900 ASME and larger may be provided with integral lifting lugs, otherwise the valves may be lifted using slings. Fittings and other devices, which may be attached to the valve, are not intended to be used as lifting points. Always follow local safety regulations when lifting heavy valves. 6. WHEATLEY valves are designed, manufactured, and tested under a certified quality system. Only quality parts and materials are used in the assembly of WHEATLEY valves. Pressure containing components are suitable for the minimum temperature marked on the nameplate. Factory certification is available. 2

7. If the valve, in service, is exposed to hazards such as traffic, wind or earthquake loading contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 8. If the valve, in service, is exposed to hazards such as excessive piping system reaction forces and moments contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 9. If the valve, in service, is exposed to hazards such as corrosive or abrasive fluids or atmospheric conditions contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 10. The valve has been designed and manufactured so that under normal operation conditions hazards such as material fatigue, brittle fracture, creep rupture or buckling will not occur. Do not operate the valve beyond the pressures and temperatures marked on the nameplate. The factory requires a complete description of the hazard before making any recommendations. 11. The user is responsible for minimizing other hazards associated with the construction, operation and maintenance of high pressure piping systems, such as: b. Provisions for the release or blow off of pressure c. Prevention of physical access to system under pressure d. Prevention of physical access to surfaces at extreme temperature e. Provisions for inspection f. Provisions for draining and venting g. Provisions for filling h. Provision for equipment access I. Prevention of over-pressurization, over-heating and over-filling j. Provision for fault indication 12. The user is responsible for meeting applicable local safety regulations. 2.0 Installation & Operation NOTE: If system hydrostatic tests are to be performed at pressures exceeding the rated working pressure of the valve, the valve should be pressurized from the upstream side. This prevents the clapper from experiencing these pressures while the body cavity can accept up to 150% rated working pressure. Care must be taken not to damage the seal faces and that they are clean for assembly. The end-user must provide gaskets and mating flanges of equal ratings to that of the valve for proper installation. When bolting the flanges together, threads of bolts should be lubricated to obtain the maximum loading on the bolts. The bolts should be tightened using a criss-cross pattern for even loading. When ring type joints are supplied, the ring number is marked on the rim of the RTJ flange. After pressure tests, with all test pressure relieved, the body cavity should be completely drained via the attached piping system to prevent corrosion. The valve may then be placed in the required operating position. 2.1 Horizontal Installation: When installing the swing check valve in the horizontal position, install the valve with the arrow mark on the body pointing in the direction of flow and the bonnet side up. 2.1.1 Operation: Flow through the valve (in the direction of the arrow mark) forces the clapper to lift fully. The clapper seals the valve when the flow is reversed. Gravity causes the clapper to swing closed when no flow is present. 3

2.2 Vertical installation: When installing the swing check valve in vertical piping, only install the valve with the arrow mark on the body pointing in the upward direction. Flow upward through the valve will cause the clapper to swing open. This valve cannot be used with vertical downward flow. 2.2.1 Operation: If there is no flow through the piping, gravity will keep the clapper in the closed position. Flow through the piping in the upward direction will cause the clapper to swing open. When the flow is reversed, the flow and the weight of the clapper will automatically close the valve. 3.0 Maintenance CAUTION: Safety practices for pressurized equipment must be followed and address hazards inherent in pressurized systems. Extreme caution and safety procedures are to be exercised whenever valves, or fittings on a valve, are serviced or maintained. 3.1 Disassembly: No special tools are required to disassemble the valve. With all pressure removed from the associated piping system, the valves can be serviced in-line or offline. During in-line maintenance, the swing check valve should be isolated from and relieved of all pressure on both the upstream and downstream sides. Exercise extreme caution when opening the pressure relief plug on the bonnet, as this will release any pressure in the valve. Drain the valve fully via the drain plug on sizes 4" and above, or via piping system otherwise. Remove the bonnet by loosening and removing the nuts. Removing the NPT plugs on both sides of the body allows for removal of the hinge pin from the body. Once the pin is removed, the clapper can be removed from inside the body. If replacement of the optional removable seat is required, it is recommended that the valve be removed from the pipeline. The retaining ring can be snapped out from the groove with a flat head screwdriver before removing the seat from the seat pocket. Be careful not to damage the seat's sealing face and O-ring groove when removing the retaining ring. For offline maintenance, the valve shall be removed from the pipeline. 3.1.1 Inspection: Inspect the clapper, seat and O-ring seal for wear or possible damage. During the maintenance, replace the clapper O-ring (integral seat style) and seat O-rings (removable seat style) with new O-rings. Check the retaining ring (removable seat style) for any damage and change if necessary. Thoroughly clean the clapper/seat sealing surfaces. Inspect both the clapper and body/seat sealing surfaces for possible scoring marks or damage. The seating surfaces must be smooth. Inspect the bonnet O-ring seal for damage. Replace the O-ring if it is damaged. Generally the bonnet O-ring will last longer than the clapper O-ring. 3.2 Reassembly: For the removable seat model, make sure the 2 O-rings are installed in the 2 grooves on the seat. Insert the seat into the bore with sealing surface facing the clapper as shown in Fig. 2 and lock this seat ring into position with the retaining ring snapped fully into the groove. For all models, insert clapper with the machined sealing surface facing the inlet port. With the clapper arm positioned into the cavity provided in the body, insert the hinge pin through the clapper and body pinholes. Ensure that the clapper swings freely inside the body. Install and tighten the pin plugs on either side of the body. 4

The bonnet is installed on the body and secured to the body by installing and tightening the nuts to the recommended assembly torques in Table 3 below. Finally, tighten the pressure relief plug on the bonnet and drain plug to the body (the drain plug is optional on the 2" & 3" valve). The valve should be tested, as required, to the appropriate specifications. TABLE 3: RECOMMENDED TIGHTENING TORQUE FOR BONNET BOLTING STUD DIAMETER (in.) THREADS PER INCH (TPI) TORQUE (ft-lbf) 4.0 Maintenance Schedule 0.375 16 16-18 0.500 13 37-42 0.625 11 72-81 0.750 10 126-142 0.875 9 200-225 1.000 8 297-334 1.125 8 429-483 1.250 8 595-669 1.375 8 798-898 1.500 8 1043-1174 1.625 8 1334-1500 1.750 8 1673-1882 1.875 8 2066-2324 2.000 8 2515-2829 2.250 8 3600-4050 2.500 8 4958-5578 The frequency of the maintenance schedule depends on the nature of the service conditions. Please contact the factory regarding the maintenance schedule for particular service conditions. 5.0 Recommended Spare Parts Based on the quantity of valves purchased, the following spare parts are recommended for valve maintenance purposes. Valve serial numbers must be specified when ordering spare parts / kits to ensure supply of correct parts. RECOMMENDED SPARE PARTS LIST GUIDE: QTY. OF VALVES MINOR KIT MAJOR KIT COMPLETE VALVE 10 1 - - 25 1 - - 50 2 1-100 3 1 1 REPAIR KIT CONTENTS: INTEGRAL SEAT REMOVABLE SEAT PART NAME MINOR MAJOR MINOR MAJOR Bonnet O-Ring YES YES YES YES Clapper O-Ring YES YES YES YES Seat O-Rings (Face & Piston) N/A N/A YES YES Retaining Ring N/A N/A YES YES Clapper Pin NO YES NO YES Clapper NO YES NO YES Seat N/A N/A NO YES 5

Contact your Cameron s Valves & Measurement group representative for a Repair Manual WHEATLEY 3250 Briarpark Drive, Suite 300 Houston, Texas 77042 USA Toll Free 800 323 9160 For the most current contact and location information go to: www.c-a-m.com Cameron s Valves & Measurement Group 07/08