Dust & Water Test Report SMA SMA-J-C-XX-ST-SB1/SMA-P-C-XX-ST-CA1

Similar documents
CTK Co., Ltd. (Ho-dong) 113, Yejik-ro, Cheoin-gu, Yongin-shi Gyeonggi-do KOREA, REPUBLIC OF Tel: Fax:

CTK Co., Ltd. (Ho-dong) 113, Yejik-ro, Cheoin-gu, Yongin-shi Gyeonggi-do KOREA, REPUBLIC OF Tel: Fax:

1

IP65 Test Report Issue by Design Technology Department Report No: 1605IP0667BR 8 Rugged Tablet PC : Taurus FM08 Rugged Tablet PC

Vaisala Pressure, RH & Temp. Transmitter. The instrument was operational upon receipt. The instrument was adjusted and calibrated.

Engineering Report Crash Safety (Impulse) Shock Test. Crystal Group, Inc. for. Prepared by. Phillip M. Toftely, Test Engineer.

CALIBRATION CERTIFICATE # 500

IEC Test Report for mini-box.com Report No. NF September 29, Test Report

IP DEFINITIONS. Technical Notes. Definitions. IPXX Code

Model PDT Dewpoint Transmitter

TR Page 1 of 21 QD30revD

TEST REPORT 545 EAST ALGONQUIN RD., SUITE F ARLINGTON HEIGHTS, IL USA. Project No. G August 12, 2013 Page 1 of 9

Calibration Procedure

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373

PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

INGRESS PROTECTION RATIO IP

GENERAL APPLICATION NOTES

Product(s) approved by this certificate is/are accepted for installation on all vessels classed by DNV GL.

Intertek Testing Services Taiwan Ltd.

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

ENGINEERING TECHNICAL REPORT

6000 SERIES OF PNEUMATIC DEADWEIGHT TESTERS

User's Manual. Heavy Duty Dissolved Oxygen Meter. Model

TEST REPORT EN Degrees of protection provided by enclosures (IP Code)

Operating Instructions Part No

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

General Accreditation Guidance. User checks and maintenance of laboratory balances

It s not like other pressure gauges

METHOD 3A - DETERMINATION OF OXYGEN AND CARBON DIOXIDE CONCENTRATIONS IN EMISSIONS FROM STATIONARY SOURCES (INSTRUMENTAL ANALYZER PROCEDURE)

Standard Operating Procedure Measuring & Testing Equipment

TEST REPORT IEC / EN Degrees of protection provided by enclosures (Ip code)

CERTIFICATION TEST REPORT

Supplementary Certificate of Approval. No S433

FINAL VERSION VERSION FINALE

Calibration Procedure. PosiTest DFT Combo

FAS-W. Features. Applications. Automatic condensation hygrometer

CHECK READOUT LOOP CONTINUITY IN PROBE C

PosiTector UTG, UTG-STD & UTG-ME

Model 106 DPI "Micro-switch" Installation and Operating Instructions

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

PURA. Pure Gas Dewpoint Transmitter. Users Guide

Turbine Flowmeters for Gas Applications

Application Note AN-107

Turbine Flowmeters for Gas Applications

Product Specification Spring Finger

Technical Procedure for General Laboratory Equipment

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

ali-q TM Gravimetric Verification Procedure

Agilent Flowmeter ADM1000

PERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

TXDOT DESIGNATION: TEX-922-K

PRODUCT SPECIFICATION. SFP+ Cage and Cage Assembly 1 of 8 A

Method of Test for Flat & Elongated Particles

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

Brooks TMF-Zone 1 Models 5816-Ex/5864-Ex

Mass Flow Controllers

2014 PennDOT Gmm Verification Program

CTG Certification Protocol -- Version 3.0 SUMMARY

Quick Installation Guide Doc nr.: C Date:

Climatic Independent Level Sensor LAR

DeFelsko PosiTector CMM IS Probe

Session #: Selection of Explosion Protected Equipment for Hazardous Locations

Calibration Procedure

Supplementary Operator s Manual 42/24-14 EN Rev. 3

Heavy Duty Dissolved Oxygen Meter

May08 Rev B

Testing of Active Flow Control actuators at harsh environment

Further technical information is available on

EUROPEAN pr I-ETS TELECOMMUNICATION September 1995 STANDARD

Technical Bulletin, Communicating with Gas Chromatographs

PQI Model 301 & 300Test Block Procedure

Climatic Independent Level Sensor LAR

Operation and Maintenance Manual

HYBRID STEPPING MOTORS HY / HS / HN Series

SCOPE OF THIS GUIDE STARTING-UP. 1 Check mini CORI-FLOW functional properties

INTERNATIONAL OIML R 32 RECOMMENDATION. Rotary piston gas meters and turbine gas meters ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

Improve Process Reliability

Number: DI-MISC-81184A Approval Date:

Fresenius Medical Care North America Service Bulletin

CALIBRATION SERVICES HUMIDITY DEW POINT AIR VELOCITY MASS FLOW TEMPERATURE CO 2 PRESSURE. (+34)

PREPARED BY: Marshall K. Cheung, Ph.D., Laboratory Director. REVISED BY: Marshall K. Cheung, Ph.D., Laboratory Director

Model DPC3500 Continuous Low Range Dew Point Analyzer. Operations Manual

TXDOT DESIGNATION: TEX-922-K

Introduction IP codes are used in electrical product catalogs, etc., to indicate waterproofness and so on.

Turbine Flowmeters for Liquid Applications

DC/DC Converter. Test item description...:

Technical Procedure for Instrument Calibration and Maintenance

PQAO Training 2017 Karl Tupper, San Luis Obispo APCD

Omniflo. Turbine Flowmeters. Description. Features. Applications. Omniflo Turbine Flowmeters. Operation

CERTIFICATE OF ACCREDITATION ISO/IEC 17025:2005 ANSI/NCSL Z (R2002)

Instrumentation Catalogue

TEST REPORT. ACCORDING TO IES LM For. Samsung Electronics Co., LTD. 1,Samsung-Ro,Giheung-Gu,Yongin-City,Gyeonggi-Do 17113, Korea

2014 Programme of Training Courses in Measurement & Calibration

Instrument Installation and Performance Verification

OSAT Series. Intrinsically Safe Infrared Temperature Sensor Operator's Guide

Table of Contents. Version 5.1. Mounting Hardware 9-10 Aluminum 9 Plastic 9 Plastic & Aluminum 10

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified))

User-Calibration of Mettler AT200 Analytical Balance

TYPE APPROVAL CERTIFICATE

Transcription:

Project Number: Design Verification Test Report Requested by: Tori Meek Date: 11/3/2010 Product Rev: 0 Part #:SMA-J-C-XX-ST-SB1/SMA-P-C-XX-ST-CA1 Lot #: na Tech: Gary Lomax Eng: Eric Mings Qty to test: 40 Test Start: 10/12/2010 Test Completed: 10/26/2010 Dust & Water Test Report SMA SMA-J-C-XX-ST-SB1/SMA-P-C-XX-ST-CA1 Page 1 of 10

CERTIFICATION All instruments and measuring equipment were calibrated to National Institute for Standards and Technology (NIST) traceable standards according to IS0 10012-l and ANSI/NCSL 2540-1, as applicable. All contents contained herein are the property of Samtec. No portion of this report, in part or in full shall be reproduced without prior written approval of Samtec. SCOPE To perform the following tests: Design Verification Test,See test plan. APPLICABLE DOCUMENTS Standards: EIA Publication 364 TEST SAMPLES AND PREPARATION 1) All materials were manufactured in accordance with the applicable product specification. 2) All test samples were identified and encoded to maintain traceability throughout the test sequences. 3) Either an automated cleaning procedure or an ultrasonic cleaning procedure may be used. 4) Any additional preparation will be noted in the individual test sequences. Page 2 of 10

FLOWCHARTS IP67 Dust & Water TEST GROUP A1 GROUP A2 GROUP A3 GROUP A4 STEP (6) (6) (6) (6) MATED MATED UNMATED UNMATED 01 Dust Test Submersion Water Test Dust Test Submersion Water Test 02 Check for Dust Check for Water Check for Dust Check for Water Dust/Water Testing = Per CEI/IEC 60529 Code IP67 IP66 Dust & Water TEST GROUP B2 GROUP B4 STEP (6) (6) MATED UNMATED 01 Stream of Water Test Stream of Water Test 02 Check for Water Check for Water Dust/Water Testing = Per CEI/IEC 60529 Code IP66 * It is not necessary to perform the dust portion of this test if IP67 testing has been performed Page 3 of 10

IP68 Dust & Water FLOWCHARTS CONTINUED TEST GROUP C1 STEP 2 Mated Connectors For Each Depth Tested (27 Total Mated Connectors) 01 2M for 30 Minutes 02 Check for Water 03 3M for 30 Minutes 04 Check for Water 05 4M for 30 Minutes 06 Check for Water 07 5M for 30 Minutes 08 Check for Water 09 6M for 30 Minutes 10 Check for Water 11 7M for 30 Minutes 12 Check for Water 13 8M for 30 Minutes 14 Check for Water 15 9M for 30 Minutes 16 Check for Water 17 10M for 30 Minutes 18 Check for Water Dust/Water Testing = Per CEI/IEC 60529 Code IP68 For this test you have to use the pressure chamber New parts should be used for each depth tested Stop testing once parts fail * It is not necessary to perform the dust portion of this test if IP67 testing has been performed Page 4 of 10

ATTRIBUTE DEFINITIONS The following is a brief, simplified description of attributes. DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP Code) The extent of protection provided by an enclosure against access to hazardous parts, against ingress of solid foreign objects and/or against ingress of water and verified by standardized test methods The object is to give: 1) Protection of persons against access to hazardous parts inside the enclosure; 2) Protection of the equipment inside the enclosure against ingress of solid foreign objects; 3) Protection of the equipment inside the enclosure against harmful effects due to the ingress of water. WATER TESTING: 1) Reference document: CEI/IEC 60529 Code IP66, IP67, and IP68 2) Torque requirements for testing: a. DCN-1532-32: 2.5 Inch/Lb Min. b. Machine Screw Torque to Fixture: 15.0 Inch/Lb Min. DUST TESTING: 1) Reference document: CEI/IEC 60529 Code IP67 2) Torque requirements for testing: a. DCN-1532-32: 2.5 Inch/Lb Min. b. Machine Screw Torque to Fixture: 15.0 Inch/Lb Min. Page 5 of 10

RESULTS IP67 Dust &Water Dust test: Mated------------------------------------------------------------------ PASS Unmated -------------------------------------------------------------- PASS Submersion Water Test: Mated------------------------------------------------------------------ PASS Unmated -------------------------------------------------------------- PASS IP66 Dust &Water Stream of Water Test Mated------------------------------------------------------------------ PASS Unmated -------------------------------------------------------------- PASS IP68 Dust &Water Depth immersion Test: Mated------------------------------------------------------------------ 7 m Max. Page 6 of 10

DATA SUMMARIES IP67 Dust test Mated: after Dust Test Unmated: after Dust Test IP67 Submersion Water Test Mated: after Water Test Page 7 of 10

Unmated: after Water Test IP66 Stream of Water Test Mated: after Water Test Unmated: after Water Test Page 8 of 10

IP68 Depth immersion Test: after Water Test 1 (2M) Pass 2 (3M) Pass 3 (4M) Pass 4 (5M) Pass 5 (6M) Pass 6 (7M) Pass 7 (8M) Fail Page 9 of 10

Equipment #: Dust-01 Description: IP-X6 Dust Tester Manufacturer: Samtec Machine Model: Serial #: N/A Accuracy: Last Cal: No Calibration Required Equipment #: Water-02 Description: IP-68 Water Depth Chamber Manufacturer: Samtec Machine Model: Serial #: N/A Accuracy: Last Cal: No Calibration Required EQUIPMENT AND CALIBRATION SCHEDULES Equipment #: Water-01 Description: IP-67 1.0 Meter Water Column Chamber Manufacturer: Samtec Machine Model: Serial #: N/A Accuracy: Last Cal: No Calibration Required Equipment #: Water-03 Description: IP-66 Water Nozzle Spray Chamber Manufacturer: Samtec Machine Model: Serial #: N/A Accuracy: Last Cal: No Calibration Required Page 10 of 10