STATION #3 INITIAL ALTERNATIVES

Similar documents
Comprehensive Collection of Stakeholder Alternatives by Mode

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

I-290 Phase 1 Study Alternatives Tool Box.

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

5. RUNNINGWAY GUIDELINES

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Performance Criteria for 2035 Long Range Transportation Plan

Clackamas County Comprehensive Plan

State Highway 44/State Street High Capacity Corridor

TRANSPORTATION TRAINING TOPICS. April 6, 2010

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

Public Meeting #2 May 18, 2011 Comment Summary by Category

Freeway System Considerations

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Chapter 5 Future Transportation

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach

INDEX. Geometric Design Guide for Canadian Roads INDEX

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

Copenhagen Cycling Map. Red Lines Cycling facilities

Road Traffic Signs in Germany

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Long List of Level 1 Alternatives

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Regional Transportation Needs Within Southeastern Wisconsin

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Brainstormed Solutions - Passenger 1-1a Air / Exand: Expand capacity (runway lengths) at BG airport (LOW)

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Transportation, Parking & Roads

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Non-Motorized Transportation 7-1

section 4 Existing Conditions, Issues, and Options

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Public Information and Participation Comments

WELCOME TO OPEN HOUSE # 1 June 14, 2017

OVERVIEW OF CIRCULATION

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

DVRPC CMP Strategies by Subcorridor

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

TRANSPORTATION IMPROVEMENT STRATEGY

San Jose Transportation Policy

Appendix 3 Roadway and Bike/Ped Design Standards

Basalt Creek Transportation Refinement Plan Recommendations

Key objectives of the survey were to gain a better understanding of:

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

How To Encourage More Efficient Transportation in Brazilian Cities

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs

Idaho Driver Education and Training

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Corridor Advisory Group Meeting #21. October 15, 2015

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

2018 Transportation Survey October 17, Prepared by:

North Coast Corridor:

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Konstantin Glukhenkiy Economic Affairs Officer

Terwillegar Drive Expressway Draft Concept Plan

STUDY ADVISORY COMMITTEE. October 8, 2015

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Route 29 Solutions Projects

El Paso County 2040 Major Transportation Corridors Plan

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Improving Mobility Without Building More Lanes

Roadways. Roadways III.

NEWMARKET CENTRE Mobility Hub Profile

Driverless Vehicles Potential Influence on Bicyclist Facility Preferences

Alternatives Public Workshop

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Transportation Master Plan Advisory Task Force

Maywood Town Hall Meeting. May 4, 2016

Ajax: The Road to Complete Streets

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Cluster 5/Module 2 (C5/M2): Pedestrians and Transit Oriented Development (TOD)

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Pedestrian Safety at Interchanges

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Appendix J Transportation Master Plan Assessment

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

Commuter Connections Regional TDM Marketing Group Meeting

Transcription:

www.dot.il.gov www.eisenhowerexpressway.com STATIO #3

IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way is usually grade separated (elevated, below grade, or subway)» Station spacing is generally 1 mile apart UP RR 2 UP RR 2 BSF RR Midway *ot to scale ALTERATIVE SUGGESTIOS Suggested Blue Line Extension I- Study Area Suggested Green Line Extension

IHB RR Bus Rapid Transit (BRT) Medium-high capacity transit mode serving urban and suburban areas:» Rubber tired bus vehicles including diesel gasoline or alternative fuel powered» Operates on reserved lanes» Station spacing varies from 0.25-2 miles apart UP RR 2 UP RR 2 BSF RR Midway *ot to scale ALTERATIVE SUGGESTIOS I- Study Area Suggested Bus Rapid Transit

Commuter Rail High capacity transit mode typically operating between central city and suburbs:» Steel wheeled, high performance electric or diesel powered train sets» Right-of-way is grade separated (ground level, raised embankment, or below grade)» Station spacing is generally 2-5 miles apart C-RR C-RR 2 Berkley Station Station 2 Melrose Park Station Station BSF-RR Forest Station C-RR Midway *ot to scale I- Study Area ALTERATIVE SUGGESTIOS Suggested ew and Extension Transit Suggested Metra Service Improvements Improve Existing Station Suggested ew Station Close Existing Station

IHB RR Automated Guideway Transit (AGT) Transit mode including people movers, monorails, and personal rapid transit:» Automatically controlled, rubber tired or steel wheeled vehicles that are typically electrically powered» Right-of-way is grade separated, typically elevated on structure» Station spacing varies from less than 0.25 miles to greater than 1 mile UP RR 2 UP RR 2 BSF RR Midway *ot to scale ALTERATIVE SUGGESTIOS I- Study Area Suggested AGT/LRT Transit

Local and Express Bus Transit modes serving urban and suburban areas:» Rubber tired bus vehicles including diesel gasoline or alternative fuel powered» Operates on existing roadways, with express buses sometime operating on reserved lanes» Station spacing varies from 0.25-2 miles apart C-RR C-RR 2 2 BSF-RR C-RR Midway *ot to scale ALTERATIVE SUGGESTIOS Suggested Express Bus Alternative I- Study Area Suggested Local Bus Alternative

Expressway Improvements Improvements to expressway capacity, safety, operation, and facility condition:» Construct additional general purpose lanes» Interchange improvements, additions, and consolidations» Geometric and operational improvements (improve clearances, widen shoulders, improve drainage)» Pavement and bridge reconstruction C-RR C-RR 2 2 BSF-RR C-RR Midway *ot to scale ALTERATIVE SUGGESTIOS Suggested Interchange Improvements I- Study Area Suggested General Purpose Lane

Managed Lanes, HOV, and Tolling Managed lanes with tolling or carpool (High Occupancy Vehicles [HOV]) lanes:» Carpool vehicles have a minimum of two or three occupants» Tolling can include congestion based pricing and can be restricted to carpools» Express bus vehicles can use managed lanes C-RR C-RR 2 2 BSF-RR C-RR Midway *ot to scale ALTERATIVE SUGGESTIOS I- Study Area Suggested Single Mode Alternative

Arterial Improvements Improvements to arterial capacity, safety, operation, and facility condition:» Add lanes» Intersection and traffic signal improvements» Geometric and operational improvements (channelization, improve drainage, access management) C-RR C-RR 2 2 BSF-RR Circuit Court of County C-RR Midway *ot to scale I- Study Area ALTERATIVE SUGGESTIOS Suggested One Way Frontage Road Suggested Ped & Bike Impovements Suggested Grade Separation Suggested Intersection Improvement Suggested Widen Bridges Suggested Arterial Improvements

Traffic Management» Intelligent Transportation Systems (ITS) technology (real time traveler information, video camera surveillance, variable message signs, traffic signal priority for transit & emergency vehicles, variable speed limits)» Transportation System Management (TSM) or lower cost improvements (signal coordination, intersection improvements, parking removal)» Travel Demand Management (TDM) to reduce vehicle demand (carpooling, telecommuting, flexible work hours, telecommuting, transit promotion) C-RR C-RR 2 2 BSF-RR C-RR Midway *ot to scale ALTERATIVE SUGGESTIOS Suggested ITS Improvement I- Study Area Smart Corridors TSM Strategies

Bicycle and Pedestrian on-motorized improvements:» Sidewalk additions, improvements, widening» ADA handicap accessible sidewalk ramps» On-road bicycle or shared lanes» Off-road bicycle facilities» Improved non-motorized crossings» Bicycle parking, pedestrian signals C-RR C-RR 2 2 BSF-RR C-RR Midway *ot to scale ALTERATIVE SUGGESTIOS Improve Conditions for Pedestrian I- Study Area ew Multi-use Path or Bike Lanes Maintain crossing ew Trail Connection to Suggested Grade Separation ew on-motorized Crossing Suggested Underpass

Other» Park-and-ride facilities at transit stations» Freight railroad and truck intermodal terminals» Expressway caps/freeway decks» Elimination of transportation facilities C-RR C-RR P 2 P P 2 P Intermodal Facility P BSF-RR P C-RR Midway *ot to scale I- Study Area ALTERATIVE SUGGESTIOS P Suggested Park and Ride Facilities Suggested Eliminated Interchanges Suggested Access Ramp Suggested Expressway Caps

www.dot.il.gov www.eisenhowerexpressway.com STATIO #4 EVIROMETAL IVETORY MAP

EXPRESS YOUR OPIIO Comment Forms:» Written and online comment forms» Comments received by June 1, 2011 will become part of the Public Meeting record Project Website:» Visit www.eisenhowerexpressway.com for up-to-date project information Facebook:» Visit www.facebook.com/eisenhowerexpressway and Like The Ike!