Secondary System Albemarle County Construction Program Estimated Allocations

Similar documents
Secondary System Albemarle County Construction Program Estimated Allocations

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Culpeper District. Albemarle County Monthly Report October, 2011

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Culpeper District. Albemarle County Monthly Report September, 2011

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Safe Routes to School Engineering Study

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Route 29 Solutions Projects

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

APPENDIX D COST SUMMARY TABLES

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Short and Long Term Needs

Reams Road RCA Study. Board of County Commissioners Public Hearing

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 47 (North Main Street) Reconstruction

Route 15 Congestion Report Findings

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Designing with the Railroad

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

REIMAGINING YONGE STREET SHEPPARD AVENUE TO FINCH AVENUE

Fairfax County Parkway Widening Fairfax County

Chapter 5 Future Transportation

Welcome to the Sellwood Bridge Project Open House!

APPENDIX L: COST ESTIMATING TOOLS

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Project Description Form 6V

State Road (S.R.) 61 (U.S. 319) FPID s and

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Knox Street Complete Streets Project

EXECUTIVE SUMMARY Roaring Fork and Colorado River Valleys Regional Travel Patterns Study. Transportation Analysis Zone Map of the Region

Rio Intersection Traffic Restrictions Begin Monday

Henderson Ave. Complete Streets Project

Secondary Road Program

Route 58 Corridor Development Fund

Project Budget and Schedule Status

Regional Goals. The UnJAM process also developed regional mobility goals including:

City of Camas Six Year Street Priorities

Upcoming City of Bellevue Projects in Your Neighborhood

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CHAPTER 5 TRANSPORTATION GOAL

ENSLEY LEVEE CLEARING

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

Rio Mills Rd/Berkmar Dr Extended Connection

TRANSPORTATION COMMISSION Agenda Staff Report

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

City of Charlottesville Bicycle and Pedestrian Master Plan Update

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

New Mexico Transportation Funding Challenges

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

West End Connectivity Master Plan

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

draft 5.2 CITY OF LARKSPUR

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

City of Wilsonville 5 th Street to Kinsman Road Extension Project

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Villa Rica Trail Master Plan

Application of a Complete Street

SC 41/Joe Rouse Intersection Improvements

Please see the attached memo for additional project background and information.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Recommended Alternatives

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

ENFIELD TOWN THE REVISED DESIGN

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CHAPTER 5 TRANSPORTATION

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

CTH M HIGHWAY PROJECT CTH Q to STH 113

Project Update May 2018

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

VIII. Project Prioritization & Implementation

Transcription:

econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 econdary Unpaved Roads TeleFee $324,624 $324,624 $324,624 $324,624 $324,624 $324,624 $1,947,744 TP Converted from IM Federal TP - Bond Match $263,270 $275,027 $276,718 $278,420 $280,132 $281,854 $1,655,421 Formula TP MG Formula BR Formula Formula TP - Match tate Funds Federal TP $1,053,078 $1,100,107 $1,106,872 $1,113,678 $1,120,526 $1,127,417 $6,621,678 $1,640,972 $1,699,758 $1,708,214 $1,716,722 $1,725,282 $1,733,895 $10,224,843 Board Approval Date: Residency Administrator Date County Administrator Date Page 1 of 5

0631 2530 ECONDARY - TWO HEARING DEIGN 0001.00 0691 11129 TP,TPRVH ECONDARY - ONE HEARING DEIGN 0002.00 0656 12982 TP/REV,TPREVH ECONDARY - ONE HEARING DEIGN 0003.00 0743 77273 BRO ECONDARY - ONE HEARING DEIGN 0004.00 0708 77274 BRO ECONDARY - ONE HEARING DEIGN 0005.00 82123 BRO ECONDARY - ONE HEARING DEIGN 0006.00 Meadow Creek Parkway - Rio Road 0631002128 RTE 631-2 LANE ON 2 LANE ROW; 4 LANE ON RELOCATED RIO ROAD INTERECTION MELBOURNE ROAD 863 MILE NORTH OF NORFOLK OUTHERN RAILWAY 1.4 JARMAN GAP ROAD 0691002258 RTE 691 - WIDEN & IMPROVE ALIGNMENT 11 Mi. West Rte.240 03 Mi. West Rte.240 GEORGEWN ROAD 0656002254 RTE 656 - POT IMP., IDEWALK & AFETY FEATURE ROUTE 654 ROUTE 743 0743002282 RTE 743 - BRIDGE & APPROACHE OVER NORTH FORK RIVANNA 73 Mi. W of Rte. 641 11Mi. W. of Rte. 641 0.1 0708002283 RTE 708 - BRIDGE & APPROACHE OVER CX RAILROAD (9 MILE OUTH OF ROUTE 738) TRUCTURE #6084 0.2 002297 BRIDGE REPLACE DICKERON RD OVER NORTH FORK RIVANNA RIVE BRIDGE AND APPROACHE 10/14/2008 1/11/2011 2/8/2011 1/13/2009 5/14/2013 1/15/2015 $3,500,000 $10,925,180 $15,737,697 3I0_ $30,162,877 Rev. haring $9,340,924 $2,150,000 2118 $5,976,050 MINOR WIDENING $8,336,000 14005 $16,462,050 $500,000 13500 $1,500,000 AFETY/TRAFFIC OR/TM $1,002,277 3I012 $3,002,277 $600,000 $323,000 BRIDGE REPLACEMENT $2,792,368 15009 $3,715,368 $504,079 $252,040 BRIDGE REPLACEMENT $1,980,793 16009 $2,736,912 Dry Bridge Road; Complete schedule required. $693,109 $126,020 BRIDGE REPLACEMENT $4,250,332 2J009 2-lane Urban W/W & Bike Lanes Previous Funding W/ Rev. haring $7,756,607 $5,069,461 Revised schedule required. Page 2 of 5

82128 BRO ECONDARY - ONE HEARING DEIGN 0007.00 54429 NO PLAN,ECONDARY 0008.00 0722 72524 TATE FORCE/HIRED NO PLAN,ECONDARY 0009.00 0668 82246 TATE FORCE/HIRED NO PLAN,ECONDARY 0010 0765 88110 TATE FORCE/HIRED No Plan 0011.00 0625 63912 TATE FORCE/HIRED BUDGET ITEM 0999.00 4009-2374 Page 3 of 5 002296 BRIDGE REPLACEMENT DICKERON ROAD OVER JACOB RUN BRIDGE AND APPROACHE DICKERON ROAD 002P75 RTE 606 - RECONTRUCT & URFACE TREAT NON-HARDURFACED ROAD ROUTE 850 ROUTE 1030 2.0 OLD GREEN MTN RD 0722002P29 RTE 722 - RURAL RUTIC ROAD (URFACE TREAT NON-HARDURFACE) ROUTE 6 ROUTE 723 2.2 WALNUT LEVEL ROAD 0668002P99 ROUTE 668 - WALNUT LEVEL RD. FROM Rte 810 Rte 765 ROUTE 810 ROUTE 765 1.6 WALNUT LEVEL ROAD 0765002P05 Rte 765 - RURAL RUTIC ROAD (URFACE TREAT NON-HARD URFACE) Rte 668 End tate Maint. 1.0 HATN FERRY 0625002BI RTE 625 - ORATE HATN FERRY - BUDGET ITEM ORATING BUDGET 1204009 COUNTYWIDE TRAFFIC CALMING VARIOU LOCATION IN COUNTY 5/14/2014 12/11/2015 11/3/2009 8/6/2008 9/24/2008 $258,405 $126,020 BRIDGE REPLACEMENT $1,789,792 2J009 $2,174,217 Revised schedule required. $541,000 170 $305,360 RECONTRUCTION $3,518,236 16003 $4,364,596 $5,000 150 RECONTRUCTION $145,000 16003 $145,000 REURFACING $212,000 16007 $217,000 RECONTRUCTION - URFACE $105,000 TREATMENT $105,000 16016 220 RECONTRUCTION 16003 0 Updated Estimate Pending Roadway Estimate $3,789,205 $900,000 Transfer from Rio Mills Pending TRAFFIC CALMING MEAURE A DETERMINED BY REIDENCY AND DITRICT TRAFFIC ENGINEER

4008-2373 4007-2372 4006-2371 4005-2370 4004-2369 4003-2368 4002-2367 1204008 COUNTYWIDE RIGHT OF WAY ENGR. VARIOU LOCATION IN COUNTY 1204007 COUNTYWIDE TRAFFIC ERVICE VARIOU LOCATION IN COUNTY 1204006 COUNTYWIDE FERTILIZATION & EEDING VARIOU LOCATION IN COUNTY 1204005 COUNTYWIDE ENGINEERING & URVEY VARIOU LOCATION IN COUNTY 1204004 COUNTYWIDE - UBDIVIION PLAN REVIEW VARIOU LOCATION IN COUNTY 1204003 COUNTYWIDE RURAL ADDITION VARIOU LOCATION IN COUNTY 1204002 COUNTYWIDE PI & ENTRANCE VARIOU LOCATION IN COUNTY 0 0 0 0 FERTILIZATION AND EEDING IMPROVE LO TABILIZATION ON ECONDARY YTEM UE WHEN IMPARTICAL ON A PROJECT: ATRNEY FEE and ACQUIITION COT. 0 TRAFFIC ERVICE INCLUDE ECONDARY ED ZONE, ED TUDIE, OTHER NEW ECONDARY IGN MINOR URVEY & PRELIMINARY ENGINEERING FOR BUDGET ITEM AND INCIDENTAL TY WORK. 0 UBDIVIION PLAN REVIEW - INCLUDE MILENE INCTION & INCTION FOR FINAL ACCEPTANCE. 0 RURAL ADDITION - ECTION 33.1-72.1. ROLLOVER OF FUND CAN BE FOR FIVE YEAR. INTALLATION CHARGE FOR PI AT PRIVATE ENTRANCE AND OTHER MINOR DRAINAGE IMPROVEMENT. Page 4 of 5

1427 71722 COUNTIE, DEVELOR, ETC. TP MIN PLAN,FED- AID,ECONDARY 0029 75815 NOT APPLICABLE TUDIE ONLY (CORR, F, I, ETC) 142700274 RTE 1427 - RAIED MEDIAN XWALK, RETRI, LIGHTING, ETC. ROUTE 631 (RIO ROAD) ROUTE 866 (GREENBRIER DRIVE) 0029002134 RTE 29 - CORRIDOR AND ACCE MANAGEMENT TUDY GREENBRIER ROAD GREENE COUNTY LINE 1 1/31/2009 $5,400 AFETY/TRAFFIC OR/TM $294,000 3J012 $299,400 Bicycle/Pedestrian Improvement. $575,999 TUDIE ONLY 22114 $575,999 Only Page 5 of 5