CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Similar documents
CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Item No. 14 Town of Atherton

Upper Market Street Bike Lane Project

Roosevelt Estates Neighborhood Improvements

SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY

NJDOT Complete Streets Checklist

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

What Is a Complete Street?

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

St. Francis Drive through the City of Santa Fe Corridor Study

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

June 29, Dear Mr. Walter:

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Tonight is for you. Learn everything you can. Share all your ideas.

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

CURBSIDE ACTIVITY DESIGN

CITY OF ORINDA TRAFFIC SAFETY ADVISORY COMMITTEE MINUTES. July 16, 2018

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

May 4, Dear Mr. Thomas and Mr. Snyder,

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Station 1: Street & Sidewalk Upgrades

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Cycle Track Design Best Practices Cycle Track Sections

City of Seattle Edward B. Murray, Mayor

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

2. Executing a legal agreement with respect to (1) above.

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

REGULAR MEETING of the San Mateo County Bicycle and Pedestrian Advisory Committee (SMCBPAC) Thursday, October 20, 2016

F L E T C H E R A V E N U E

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Multi-Modal Traffic Analysis. Parisi and Associates

Compiled by the SFMTA Livable Streets Subdivision Staff

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

forwarddallas! Implementation Proposed Chapter 43 Code Amendment On-Street Parking

Display Boards Including Five Refined Design Concepts

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Completing the Street: Denning Drive

Service Development 1600 Franklin Street, Oakland CA 94612

Glebe Neighbourhood Cycling Plan

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Non-Motorized Transportation 7-1

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Forest Hills Improvement Initiative

122 Avenue: 107 Street to Fort Road

COMMUNITY MEETING AGENDA

Polk Streetscape Project

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

LANCASTER CITY BICYCLE NETWORK

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Wood and Cortland Neighborhood Greenways

Welcome to the Quebec Alternatives Analysis Public Meeting

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

@ FRIENDLY ACRES COMMUNITY MEETING

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Comments EXECUTIVE SUMMARY

Accommodating Pedestrians in the Work Zone

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M.

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Blair/Williamson Intersection Expressed Needs

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

TRAFFIC CALMING POLICY & PROCEDURES

Transcription:

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Wednesday, November 30, 2016, 7:00 PM 1. CALL TO ORDER The meeting was called to order at 7:00 P.M. by Chair del Rosario. 2. ROLL CALL Present: Staff Present: Javandel, Chomsky, del Rosario, Reeves, McCroskey Aleida Andrino-Chavez, Transportation Planner Jocelyn Walker, CIP Manager Jeff Bond, Community Development Director Mark Hurley, Public Works Director and City Engineer 3. APPROVAL OF MINUTES - Minutes for the Regular Meeting of October 27, 2016 Motion Javandel/Chomsky: Moved to approve the minutes of the October 27, 2016 meeting as submitted. 4. PUBLIC COMMENT The following PUBLIC COMMENTS were offered by Ken McCroskey and Valerie Risk: Pedestrian safety at the train tracks and freeway, and inclusion of the issue in the Commission's work plan. Safety of individuals crossing Portland Avenue at San Pablo as it is the route to Albany High School. Bond advised that information from death investigations relevant to policy decisions would be brought to the Commission. Chavez reported the City received a grant for improvements to San Pablo. Construction plans would be developed in 2017. She invited Ms. Risk to become a member of the Technical Advisory Committee for this project. 5. PRESENTATION A. Police Report. 6. DISCUSSION AND POSSIBLE ACTION ON MATTERS RELATED TO THE FOLLOWING ITEMS: A. Potential Location for Speed Humps on the 500 Block of Masonic Avenue Chavez presented survey results, physical characteristics, and the planning context for the 500 block of Masonic. Proposed locations of speed humps was 512 and 526 Masonic. An alternative location for the northern speed hump was 508 Masonic; however, the property owner opposed the location. Speed humps recommended in the Traffic

Management Plan for the 600 block would not be installed if the Commission approved the speed humps on the 500 block. Contact with the property owners at 512 and 526; and inquiries or complaints from the public regarding the 600 block. Rationale for two speed humps on one block; and placement of one hump on each of the two blocks. Support for two speed humps on the 500 block because of the proximity to the school and for consistency with other streets. Requested methods that could be used to interrupt the visual length of the two blocks. The following PUBLIC COMMENT was offered by Bryan Marten: A request for information from the traffic study. Motion Javandel/Reeves: Moved to approve the installation of speed humps at 512 and 526 Masonic. B. Buchanan Marin Bikeway Phase III and Marin Utility Undergrounding Bond reported that staff received bids of approximately $4.9 million for this project, but the budget was $2.5 million. Staff was refining the project specifications to reduce costs and would recommend it be broken into phases with a focus on improvements east of San Pablo Avenue for the upcoming Phase III. A review of the path bicyclists would travel both eastbound and westbound through the project. A list of the items in the bids that exceeded the costs in the engineer's estimate. Information whether an RFP for improvements west of San Pablo Avenue would be issued in the future. Possible modification of the drain grate at the northeast corner of the San Pablo/Marin intersection because it occupies approximately half the bike lane. Motion Javandel/McCroskey: Moved to recommend to the City Council to authorize rebid of the project with amended project phasing and specifications. C. Update on Complete Street Features Associated with University Village Mixed Use Project Bond advised that staff was refining the locations of bus stops on San Pablo Avenue. Caltrans was reviewing a proposed bus stop on San Pablo at the far side of the intersection with Monroe. The cycle track would weave around the bus stop landing at the proposed location and result in a mixing of bus passengers and bicyclists. The improvement for the bus stop and the functioning of other modes of travel was a good advancement of the project.

An entry point to the cycle track on the north side of the project is needed in the form of a curb ramp for southbound bicyclists. Signage to allow bidirectional cycling on the sidewalk. Consideration of building the bus stop as a bulb-out so that the cycle track could be a straight path. Consideration of routing the crossings so that the cycle track would continue across Monroe Avenue against the buildings. AC Transit would like to maintain flexibility to install a bus stop on the near side of the Monroe/San Pablo intersection as it is unknown how traffic in the new development would impact bus schedules. An explanation of the elevations of the sidewalk and cycle track and transitions between the two, and the use of vertical versus rolled curbs. A suggestion that the crosswalk at Monroe be moved a foot or two south or be made wider to eliminate the 90-degree angles for pedestrians. The crosswalk design between the cycle track and sidewalk should emulate the way pedestrians walk. People do not cut at 90 degree angles, rather than at diagonals,. This is particularly true for constrained spaces. An explanation of the movement of cyclists traveling west on Dartmouth to cross the intersection at San Pablo Avenue and the use of green striping adjacent to the crosswalk. The plans show the crossing of San Pablo at Dartmouth as a walking facility only, not a biking facility as previously requested by this Commission. Signage for southbound motorists indicating no left turn in the crosswalk onto Dartmouth. Visual differentiation of the cycle track and the sidewalk. A review of cyclist movements southbound at the senior center and possible pavement markings for cyclists. The following PUBLIC COMMENTS were offered by Preston Jordan: The project lacks a cycling crossing at the intersection of Dartmouth and San Pablo; there should be a connection between the multiuse path at Monroe and the cycle track; concerns about how the bike access to bike parking at Sprouts will work out; concerns about 6-inch vertical curbs located just north of Monroe and at the north end of the cycle track protruding between the cycle track and the sidewalk; and a preference for sloped or rolled curbs between the cycle track and the sidewalk. Request BKF round all 90-degree corners around the curb ramps. Concerns regarding Albany Strollers and Rollers' support for the project and future projects. Make the curb cut wider on the west side of the Dartmouth/San Pablo intersection to allow for cyclists crossing the intersection. Return with the location of the bike racks by Sprouts. Keep in mind that cyclists do not turn at 90 degree angles (for all the transitions from one type of facility to the other please angle all transitions to simulate normal riding patters). Present possible alternate designs to accommodate bicycles and pedestrians. Designation of the southwest corner of San Pablo and Monroe as a shared-use path. Bond understood frustrations with the project and the difficulties of working with Caltrans, developers, and the public. The following PUBLIC COMMENT was offered by Preston Jordan: Inclusion of a cycling crossing by adding bike stripes on San Pablo at Dartmouth like those shown in the original plans by BKF.

A suggestion to update the Commission regularly regarding large projects. Continuation of the cycle track on the property side northbound beyond Monroe. Place the cycle track flush with the sidewalk. Return with the location of bike racks at Sprouts. A better location for the mix of pedestrians and bicycles was probably further north on the Monroe side. Preference for a sloped or rolled curb over a vertical curb. D. Marin-Curtis Safe Routes to School Project Bond shared background information regarding the raised crosswalk at the intersection of Sonoma and Curtis. The project was completed without the raised crosswalk because of issues with grading the site. The project met safety objectives without the raised crosswalk. Financial constraints of constructing the raised crosswalk; markings on ramps of the speed table; alternative improvements to slow traffic through the crosswalk; and grade of sidewalks compared to Curtis. The following PUBLIC COMMENTS were offered by Preston Jordan: Update the Active Transportation Plan with the designation of Curtis as a relaxed bike route because it is easier to cross Marin at Curtis than Peralta, and create a crosswalk to the greenway on Masonic at Garfield. 7. ANNOUNCEMENTS AND COMMUNICATION A. Washington Avenue Traffic Calming Proposal from Neighborhood Residents Chavez announced a meeting was scheduled for December 15. The Commission requested the following clarification: Speed data for Washington. B. San Pablo Avenue and Buchanan Street Pedestrian Improvements Project Design Chavez indicated a meeting with Caltrans was scheduled for the following day. 8. FUTURE AGENDA ITEMS AND TENTATIVE DATES A suggestion to postpone election of Chair and Vice Chair to the February meeting. A suggestion to include agenda items regarding fatalities on the railroad and I-580 and procedures to follow up on projects after approval. Bond noted discussion of the Commission's work plan depended on the Council's strategic planning work session. A. 2017 Sidewalk and Pavement Projects B. Washington Avenue Traffic Calming C. Thousand Oaks Avenue Pedestrian Safety Improvements at Intersections East of San Pablo Avenue D. Location of Speed Humps on the 1000 Block of Key Route Boulevard The following PUBLIC COMMENT was offered by Preston Jordan:

Inclusion of standards for pavement markings and a review of diagonal ramp design as future agenda items. ADJOURNMENT Next regular meeting: January 26, 2017 The meeting adjourned in memory of Rolando Grasso and Luis Barba at approximately 9:35 P.M. The Commission agenda is available for public inspection at the Albany Community Center/Library, Senior Center and City Hall. The agenda, when available, can be found on our web page at www.albanyca.org. Agenda related writings or documents provided to a majority of the Traffic & Safety Commission regarding any item on this agenda will be made available for public inspection in the Community Development Department. Please note that if you provide your name and address when speaking before the Commission/Committee/Board it will become part of the official public record, which will be posted on the Internet. In compliance with the Americans with Disabilities Act (ADA), and State Law, if you need special assistance to participate in this meeting, please contact the City Administration Office 510-528-5710. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting (28 CFR 35.102.104 ADA Title II). Upon request, we will provide written agenda materials in appropriate alternate formats, of disability related modification or accommodation, including auxiliary aids or services to enable individuals with disabilities to participate in public meetings. Please deliver a written request, including your name, mailing address, phone number and brief description of the requested materials and preferred alternative format or auxiliary aid or service at least two (2) days before the meeting. Request should be sent to: City Clerk, 1000 San Pablo Avenue, Albany, CA 94706.