Request for Authorization to Open Public Comment Period

Similar documents
State Street Transit Signal Priority Study

North Shore Transportation Improvement Strategy

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

BICYCLE FACILITIES INVENTORY: SUMMARY REPORT

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Bicycle Master Plan Goals, Strategies, and Policies

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Sixth Line Development - Transit Facilities Plan

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

PROJECT FACT SHEET March 21, 2018

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

to the Public Information Centre for the Downtown Traffic Study

Figure 1: Vicinity Map of the Study Area

STREET AND HIGHWAY PLAN

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

TRANSPORTATION NEEDS ASSESSMENT

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

C C C

Chapter 3 BUS IMPROVEMENT CONCEPTS

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Highway 111 Corridor Study

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Project Status Update

Chapter 5 Future Transportation

122 Avenue: 107 Street to Fort Road

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

ROADS, RAILS, AND RUNNING SHOES: DEVELOPING MULTI-MODAL SIGNAL TIMING FOR A NEW LIGHT RAIL CORRIDOR IN AURORA, COLORADO

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Regional Transportation Needs Within Southeastern Wisconsin

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

PROJECT FACT SHEET May 25, 2018

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

Harrah s Station Square Casino

Basalt Creek Transportation Refinement Plan Recommendations

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

AGENDA ITEM G-2 Public Works

Transportation Impact Study for Abington Terrace

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Operational Comparison of Transit Signal Priority Strategies

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

NJDOT Complete Streets Checklist

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Public Works and Infrastructure Committee. General Manager, Transportation Services

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Welcome to the Quebec Alternatives Analysis Public Meeting

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

Bicycle and Pedestrian

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Frequently Asked Questions

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

City of Moorhead Committee of the Whole Meeting

Sacramento Grid 2.0. The Downtown Transportation Study

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #2. Tuesday, May 23 rd, Norwalk City Hall

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Potential Bicycle Facility on Bayou Street Mobile, Alabama

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

TRAFFIC IMPACT ANALYSIS

Board of Supervisors February 27, 2017

Non-Motorized Transportation 7-1

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

City Avenue Projects

2.0 LANE WIDTHS GUIDELINE

APPENDIX E: Transportation Technical Report

Preliminary Transportation Analysis

IMPLEMENTATION STRATEGIES

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Appendix D: Planning Level Cost Calculator

Borough of Danville, PA Traffic Calming Program Guidelines

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Tonight is for you. Learn everything you can. Share all your ideas.

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Transcription:

Request for Authorization to Open Public Comment Period May 12, 2015

LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New Jersey. Conformity Addition of regionally significant and non-exempt projects to TIP for Pennsylvania, Meeting requirements for the 2012 PM 2.5 standards, and MOVES 2014.

Requested Action Staff requests authorization to open a minimum 30-day public comment period for the purpose of gathering public and agency comments for: The amendment to the Connections 2040 Long-Range Plan, Draft FY 2016 TIP for New Jersey, and The Draft Conformity Determination of the Connections 2040 Long-Range Plan, FY 2015 TIP for Pennsylvania, and FY 2016 TIP for New Jersey; to issue proper public notifications; to publish the draft documents of the respective Plan amendment, TIP, and conformity findings on the internet; to make copies available at certain public libraries; and to hold public meetings.

State Street Transit Signal Priority Study Presentation to the Regional Technical Committee May 12, 2015

Study Purpose Explore the potential for Transit Signal Priority (TSP) along State Street in downtown Trenton Implementation of Transit Signal Priority Favorability Score: Development and Application in Philadelphia and Mercer County Developed a set of high level criteria to evaluate and compare TSP corridors Three segments of State Street scored in top ten for TSP favorability

Study Area State Street from Willow Street to Clinton Avenue Corridor characterized by: High urban density with closely spaced signalized intersections Wide sidewalks High daytime pedestrian activity One travel lane in each direction with intermittent turn lanes Low traffic congestion, moderate vehicular volumes, low travel speeds High bus frequency

Data Collection Non Transit Transit Manual turning movement counts Signal timings Pedestrian activity Inventory of bus timetables, schedules, and routes Stop level activity for study area stops Supplemented with field visits

VISSIM Model VISSIM software Multi modal, micro simulation tool Built on scaled aerial photos Traffic signal timing and phasing Stop signs, yield points, volumes, routing entered Replicate real world conditions

VISSIM Model Development Traffic Operations Balance turning movement counts Develop AM and PM peak hour networks Transit Operations Routes, headways, and stops Boardings and alightings converted to a dwell time

Networks Base Year Developed from 2014 existing conditions Optimized TSP Signals optimized for cycle length, cycle splits, and offsets Detection of an approaching transit vehicle TSP + Enhancements TSP and other refinements

Performance Measures VISSIM performance measures Intersection delay (seconds) Approach delay (seconds) Network wide travel speeds and overall delay Bus travel time segments Based on ten averaged random seeds

Results Peak Hour Vehicle Network Delay

Results PM Network Travel Speeds Base Year TSP All Vehicles 3.3% Car 3.2% Bus 8.6% 0 3 6 9 12 15 18 Speed (mph)

Results Bus Travel Time Segments

Findings / Conclusions Traffic signal optimization has a positive impact on traffic flow through the corridor Implementing TSP does not negatively impede overall intersection performance or State Street traffic flow TSP reduces through movement delay by 31.6 percent in the AM and 26.0 percent in the PM

Thank You Keith Hartington Senior Transportation Planner 215.238.2852 khartington@dvrpc.org

May 2015 Transportation Improvement Program New Jersey (FY2014-2017) Pennsylvania (FY2015-2018)

Add Proposed New Project - PA a. Paper Mill Road over Darby Creek (Worrall Bridge/CB #221) (Act 13), Delaware County Amend the PA TIP by adding a new $1,415,000 Act 13 funded local bridge project to the TIP. These are additional funds to the region. FY15 FY16 PE $200,000 FD $100,000 CON $250,000 ROW $15,000 CON $850,000 Bridge from 1927 is posted with weight restrictions, has a fair superstructure, efflorescence, surface map cracking, and heavily deteriorated deck inlets with exposed and corroded reinforcing steel. Bridge structure will be analyzed. A rehabilitated or new structure will be designed.

1 4 5 2 3

a. Paper Mill Road over Darby Creek (Worrall Bridge/CB #221) (Act 13), Delaware County Amend the PA TIP by adding a new $1,415,000 Act 13 funded local bridge project to the TIP. FY15 FY16 PE $200,000 FD $100,000 CON $250,000 ROW $15,000 CON $850,000

Add Proposed New Project - PA b. Troxel/Orvilla Road (SR 1004) Bridge Repair, Montgomery County Amend the PA TIP by adding a $1,320,000 ($1,056,000 STU/$264,000 State 581) project to the TIP for FY15 CON. Due to structural damages, the Troxel/Orvilla Road over the West Branch of Neshaminy Creek bridge in Hatfield Twp. was recently closed to traffic. This 1874 stone arch bridge serves as a connection between PA 309 and PA 463 for roughly 7,000 drivers a day. PennDOT expects to re-open the bridge to traffic around the end of November 2015 (a 6-mile detour currently exists). Improvements will strengthen and restore the structure to a nonstructurally deficient status.

Detour Map Source: http://www.hatfieldtownship.org/60homepage-rotator/483-orvilla-road-bridge-detour-spring2015

Bridge Photo Source: http://www.thereporteronline.com/general-news/20150410/orvilla-road-bridge-repair-slated-for-late-2015-waln street-bridge-pushed-back-to-2016

b. Troxel/Orvilla Road (SR 1004) Bridge Repair, Montgomery County Amend the TIP for PA by adding a $1,320,000 ($1,056,000 STU/$264,000 State 581) project to the TIP for FY15 CON.

Advance PE Phase - PA c. Swanson Street Reconstruction, City of Philadelphia Amend the PA TIP by advancing the Preliminary Engineering (PE) phase from FY20 to FY15 and reprogramming the PE phase in the amount of $600,000 STP with toll credit match. Roadway has deteriorated to the point that full reconstruction and other roadway upgrades are necessary to safely accommodate increased traffic from surrounding significant retail development in the area. As a complex, busy corridor, PE while ready to advance is anticipated to take several years. Thus, other phases would be considered during the FY2017 PA TIP Update process. The existing roadway will be reconstructed to provide a new roadway surface, including footway, medians and curbs, new drainage and storm water management improvements, street lighting pavement markings, landscaping, and a new signal at the Snyder Avenue intersection.

At Swanson & Snyder

b. Swanson Street Reconstruction, City of Philadelphia Amend the TIP for PA by advancing the Preliminary Engineering (PE) phase from FY20 to FY15 and reprogramming the PE phase in the amount of $600,000 STP with toll credit match.

2001 Proposed Work Program Amendment: Facilitating Dialogue on Municipal Actions to Protect and Improve Water Quality in the Delaware River Watershed DELAWARE VALLEY REGIONAL PLANNING COMMISSION May 12, 2015

Facilitating Dialogue on Municipal Actions to Protect and Improve Water Quality in the Delaware River Watershed Builds on DVRPC s previous open space and water quality planning work Proposal prepared at request of William Penn Foundation Total Project Cost $442,728 Grant Award - $385,385 Match - $57,343 (Comprehensive Planning funds) Completion by 12/31/16

Facilitating Dialogue on Municipal Actions to Protect and Improve Water Quality in the Delaware River Watershed Major Tasks: Establish Municipal Technical Assistance Advisory Panel Inventory municipal TA programs in the DRWI clusters Hold series of meetings with MTAAP Engage municipal responses through interviews and focus groups Recommend TA actions, capacity building and delivery mechanisms to facilitate nonprofit conservation organizations (and others ) provision of Municipal TA to help municipalities implement tools to improve or maintain water quality

Facilitating Dialogue on Municipal Actions to Protect and Improve Water Quality in the Delaware River Watershed Action Proposed: Recommend DVRPC Board approval for amending the FY15 Work Program to include the project Facilitating Dialogue on Municipal Actions to Protect and Improve Water Quality in the Delaware River Watershed