Moving Forward Together Plan

Similar documents
halifax.ca/integratedmobility Open House

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Almon Street Bike Lane Planning

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Seattle Transit Master Plan

Interim Transit Ridership Forecast Results Technical Memorandum

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Item No. 8.1 Transportation Standing Committee February 1, 2018 February 22, 2018

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

2. Context. Existing framework. The context. The challenge. Transport Strategy

Arterial Transitway Corridors Study. Ave

Today s Workshop INTRODUCTION PROJECT SCHEDULE WE WANT YOUR FEEDBACK ON BOLD MOVES FOR MOBILITY IN THE HALIFAX REGION! REVIEW the information boards

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Metropolitan Council Transportation Committee

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Philadelphia Bus Network Choices Report

Welcome. If you have any questions or comments on the project, please contact:

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

Appendix 1 Transit Network Analysis

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Regional Transportation Needs Within Southeastern Wisconsin

Chapter 5 Future Transportation

4 Ridership Growth Study

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018

Twin Cities Regional Bicycle System Study

Public Consultation Response to the Moving Forward Together. Draft Plan.

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Calgary Transit Route 302 Southeast BRT Year One Review June

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Bicycle Master Plan Goals, Strategies, and Policies

South King County High-Capacity Transit Corridor Study

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

TRANSPORT CHICAGO: STRATEGIC PUBLIC TRANSIT BUS RELIABILITY IMPROVEMENTS

Frequently Asked Questions (FAQ)

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Transportation Master Plan Advisory Task Force

Community Transportation Plan Acknowledgements

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received.

Transit Workshop with MPO Board

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Comments The Plan for Port Whitby

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Gratiot Avenue Transit Study Tech Memo #4: Ridership

TRAFFIC IMPACT STUDY CRITERIA

Bus Rapid Transit Plans

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

PEDESTRIAN ACTION PLAN

CITY MANUALS AND STANDARDS REVIEW

ABERDEEN: CITY OF THE FUTURE

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY

AGENDA ITEM G-2 Public Works

5.0 Roadway System Plan

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ACTION TRANSMITTAL No

Rochester Area Bike Sharing Program Study

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Item B1 November 19, 2009

CHIEF PEGUIS TRAIL EXTENSION WEST

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

TRANSPORTATION NEEDS ASSESSMENT

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

City of Davenport CitiBus Public Transportation Study. April 2015

Chicag. go Tra. ansit A. Autho. ority

January Project No

Powell River Regional Transit System. Service Review Report: Executive Summary

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Public Works and Infrastructure Committee. General Manager, Transportation Services

Transportation Master Plan April 2017 i

Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

Scheduling 101 Calculating Running Time Metropolitan Atlanta Rapid Transit Authority Multimodal Operations Workshop Houston, TX

Public Consultation Centre For. Transportation Master Plan Update. Information Package

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Tunnel Reconstruction South 5 th Street Association October 16, 2018

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

TRASBURG RANSPORTATION

City of Perth Cycle Plan 2029

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

POLICY ADVISORY COMMITTEE

TRANSPORTATION & MOBILITY

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Transcription:

Re: Item No. 3 Moving Forward Together Plan Committee of the Whole April 12, 2016 The Moving Forward Together Plan Intended to give long term guidance to service changes New transit network map New policies and service guidelines 1

Related Initiatives Regional Plan Integrated Mobility Plan Halifax Transit Technology Plan Rural Transit Funding Program Moving Forward Together Plan Process Stage 1 Consultation (Fall 2013) Draft Plan (2014) Stage 2 Consultation (Feb April 2015) Revise Plan (Spring 2015 Winter 2016) Council Approval Process (March/April 2016) Implementation (2016/2017 2020/2021) 2

Round 1 Consultation High level, values based What should your transit network be? The Moving Forward Principles 1. Increase the proportion of resources allocated towards high ridership services. 2. Build a simplified, transfer-based network. 3. Invest in service quality and reliability. 4. Give transit increased priority in the transportation network. 3

Round 2 Consultation Staff engagement included: Internal working group with other business units Review/consultation with business units, including Planning & Development, Transportation & Public Works, and Parks & Recreation Operator focus group/workshop Operator pop up events/comment cards Leadership team workshop Training Department and Office/Administrative staff sessions Operations Supervisors assigned routes to evaluate Round 2 Consultation Overall agreement with general direction of plan Moving Forward Principles Service Types Most comments related to specific route changes proposed Investment in infrastructure well received 4

Level of Revisions Changes proposed in revised plan are in response to route-specific feedback All revisions in revised plan were made based on feedback from the public & stakeholders The plan is still founded in the Moving Forward Principles The same service types are proposed (Corridor Routes, Local Routes, Express Routes, Regional Express Routes, Rural Routes, Ferry Routes, School Specials) Revisions Based on Public Feedback Substantial changes informed by consultation Changes to 6/10 Corridor Routes, many Local Routes The only changes made were in response to consultation findings Attachment A to staff report summarizes the 14 biggest themes and how they were responded to in revised plan (excerpt below) Number of Area Comments Peninsula 600 700 comments + petition with 408 signatures Purcells Cove 450-500 comments + petition with approximately 300 signatures Summary comments Revised Plan addresses comments? Rationale Retain route 1 as it is Yes Existing route 1 routing is proposed to be retained. Plan identifies urgent need for TPMs in the Bayers Road Corridor. In interim, proposed service would be removed from Bayers Road in PM peak and instead would travel on Roslyn St. Do not discontinue service past Williams Lake Road Yes Revised plan returns service to the Purcells Cove Road during morning and afternoon rush hour 5

The Moving Forward Together Plan The Moving Forward Together Plan is a strategic plan which: Incorporates significant public feedback Addresses today s travel demand patterns and plans for changes in travel demand associated with projected residential & commercial development Works to achieve the Council endorsed Moving Forward Principles Help to establish a more efficient and effective transit system. The Moving Forward Principles 1. Increase the proportion of resources allocated towards high ridership services High ridership defined to represent when a transit route is carrying more than 30 passengers per hour Establishment of Minimum Ridership Guidelines 6

Minimum Ridership Guidelines Service Type AM &PM Peak Midday & Saturday Weekday Evening & Sunday Corridor Routes Local Routes 25 passengers/hr 15 passengers/hr 10 passengers/hr Rural Routes Express and School Routes 20 passengers/trip N/A N/A Regional Express Routes 15 passengers/trip N/A N/A Services Exempt from Guidelines Ferry High capacity link connecting downtown Halifax, Dartmouth, and Woodside Critical importance to regional transportation network Historic and cultural heritage value Route 320 Airport/Fall River Important connection between Downtown Halifax and the Halifax Stanfield International Airport. Regional connection important for tourism and economic development reasons 7

The Moving Forward Principles 1. Increase the proportion of resources allocated towards high ridership services Where high ridership demand exists or is expected to exist/increase due to population/employment density, more/new service is provided, for example: High ridership routes/areas categorized as Corridor Routes and given increased importance in the network (175,000 residents within walking distance to these ten routes) Restructuring Express Routes to make them available to more residents, increasing the number of trips, and areas where Express Routes are offered Increased/new service in growth areas such as West Bedford New Service Areas Washmill Lake Drive Governors Brook Old Sackville Road Parts of Bedford & West Bedford 8

Service Elimination Level of service reduced or eliminated in some low ridership areas based on existing and future potential ridership, including: On some routes, service reduced or eliminated in low ridership periods (ex. service will only be provided during peak periods) Very low ridership portions of routes eliminated One low ridership route to be eliminated Route 402 Sambro (2017/2018 Fiscal Year) Waverley Road past Craigburn Drive (2020/2021 Fiscal Year) Beaver Bank Road past Kinsac Road (2020/2021 Fiscal Year) Grand Desert (2020/2021 Fiscal Year) Six School Specials (2017/2018 Fiscal Year) Rationale for Service Elimination 9

Rural Transit: Alternate Service Model Conventional fixed route, fixed schedule service may not be suited to all areas of Halifax Nova Scotia has long history of not for profit agencies meeting unique transit needs of rural communities Regional Plan Policy T-10 provides ability to encourage and assist communities with developing community based transit services outside Urban Transit Service Boundary Rural Transit Funding Program Adopted August 2014 Currently two rural transit service providers including MusGo Rider and Bay Rides. Flat rate of $0.50 per in service kilometer, plus annual grant of $5,000 or $10,000 10

Service Elimination: School Specials Introduced to carry school age students to junior high school and high schools Initially were subsidized by the school board Not published in public timetables Most specials duplicated by other Halifax Transit routes or experience low ridership Proposing elimination of 6 of the 9 existing routes Removal would occur in September 2017 The Moving Forward Principles 2. Build a simplified, transfer-based network. Reduce some overlap of routes to increase efficiency of the network, for example ending Local Routes at terminals. Network designed to facilitate transfers by having all Local Routes connect to Corridor Routes at terminals. Reduce deviation of routes in order to facilitate create quicker and more direct trips (ex. Route 65, shown at right). Many routes are shortened or simplified versions of existing routes A number of routes have been consolidated (2&4, 6&22, 17&18) Redundant routes were removed (41, 42, 63, 85) Existing Proposed: Revised Draft 11

New Infrastructure Wrights Cove Terminal Windmill Road, Dartmouth 4 bay terminal West Bedford Park & Ride Innovation Drive, Bedford 4 bay terminal 350-400 parking spaces Margeson Drive Park & Ride Margeson Drive, Middle Sackville 500 parking spaces Bus Stop Guidelines Level 1: Regular Bus Stop Level 2: Sheltered Stop Level 3: Enhanced Stop Level 4: Transit Hub Level 5: Transit Terminal with Interior Passenger Space 12

The Moving Forward Principles 3. Invest in service quality and reliability Shorter, simplified routes to improve reliability Dedicating resources to address schedule adherence, capacity, demand, and frequency, during implementation, and in the future Apply performance guidelines to measure and monitor quality and reliability Performance Guidelines Route Direction and Route Variation Guidelines Quality of Service Guidelines On Time Performance Vehicle Load Passenger Load Guidelines Span of Service Guidelines by Service Type Service Frequency Guidelines by Service Type 13

Stop Spacing & Placement Stop Spacing A resident is served by transit if they are within 500 metres of a stop Bus stops will be spaced to ensure that a minimum of 90% of all residences within the transit service area are within 500 metres of a stop Bus Stop Placement Stops should be placed near intersections & trip generators Stops should not be closer together than 250 metres Spaced 500 metres apart in low density areas. Where possible, adjacent to pedestrian infrastructure The Moving Forward Principles 4. Give transit increased priority in the transportation network. Revised Plan: Stronger, more specific commitment to TPMs Includes 11 short term TPMs Two critical locations identified for significant TPM investment Bayers Road Gottingen Street Identifies method of analysis which quantifies true cost and benefit of potential Transit Priority Measures Further priorities to be identified through the Integrated Mobility Plan 14

Implementation There are complexities associated with the implementation Technology Roadmap Projects currently underway Planning & Scheduling Lead Time Resource Availability Staff Vehicles Budget (Local Transit Area Rate implications) Implementation Fiscal Year 2016/2017: An additional round trip on the Route 330 Tantallon Changes to Route 56, discontinuing service to Portland Hills Terminal and introducing a new connection to Bridge Terminal Development of the Integrated Mobility Plan Technology Program: Launch of AVL+: Bus Installs, Public Interfaces and Stop Annunciation, Initiate Fare Management Project Initiate Paratransit Scheduling Upgrades and Optimization Prepare for new Fixed Route Scheduling Software, Automated Vehicle management (Mechanical Integration), and Security Systems 15

Implementation Fiscal Year 2017/2018: Realignment and elimination of low ridership routes/route segments (Routes 402 Sambro, School Specials) Additional trips on existing express routes (Route 186 Basinview Express, 330 Tantallon) Changes to routing/ level of service for several routes (Routes 6 Quinpool, 15 Purcells Cove, 22 Armdale, 7 Robie, 370 Porters Lake) Technology Program: Ongoing Implementation of Fare Management Solution, Fixed Route Scheduling Software, Paratransit Scheduling Upgrades and Optimization, Automated Vehicle management (Mechanical Integration), Security Systems Upgrade, and Yard Management Implementation Fiscal Year 2018/2019 Restructuring of routes in Clayton Park, Fairview and Timberlea and parts of Bedford Expansion of the Burnside Transit Centre. Technology Program: Ongoing implementation/ completion of Fare Management Solution, Fixed Route Scheduling Software, Paratransit Scheduling Upgrades and Optimization, Security Systems Upgrade, and Yard Management Fiscal Year 2019/2020: Restructuring of routes Spryfield and parts of the Halifax Peninsula. Completion of any outstanding Technology Programs 16

Implementation Fiscal Year 2020/2021: Restructuring of routes in Sackville, Dartmouth, Eastern Passage, Cole Harbour, and remaining Bedford routes Omissions/Clarifications to Plan Amend the Route 1 Spring Garden description found in Attachment A, Appendix B, page B1 to reflect two way transit service on Gottingen Street, as shown on map in Appendix A; Depart Bridge Terminal ~ right on Thistle Street, right on Wyse Road, left on Macdonald Bridge, left on Gottingen Street, left on Cogswell Street, right on Barrington Street, right on Spring Garden Road, continue on Coburg Road, right on Oxford Street, left on Bayers Road, left on East Perimeter Road, continue into ~ Mumford Terminal PM Peak Outbound Depart Bridge Terminal ~ right on Thistle Street, right on Wyse Road, left on Macdonald Bridge, left on Gottingen Street, left on Cogswell Street, right on Barrington Street, right on Spring Garden Road, continue on Coburg Road, right on Oxford Street, left on Roslyn Road, left on Connaught Street, right on Bayers Road, left on East Perimeter Road, continue into ~ Mumford Terminal 17

Omissions/Clarifications to Plan Amend the Route 4 Lacewood description found in Attachment A, Appendix B, page B2 to reflect routing as shown on map in Appendix A: Depart Lacewood Terminal ~ right on Lacewood Drive, left on Main Avenue, continue on Fairview Overpass, right on Windsor Street, left on Cunard Street, right on Robie Street, left on Spring Garden Road, right on South Park Street, right on Inglis Street, right on Robie Street, left on South Street, right on Le Marchant Street ~ Dalhousie Student Union Building Omissions/Clarifications to Plan Remove Table 6 Level of Service Guidelines found on Attachment A, Section 3.6, page 45; and Include a new table to summarize the service spans and frequencies of ferry routes on Attachment A, Appendix D, page D-1. Service Type Route Number Service Start Weekday Saturday Sunday Span Service Frequency Span Frequency Span Frequency Service End Rush Hour (AM & PM) Midday/ Evening Service Start Service End Day Service Start Service End Day Ferry 501 6:30 AM 11:30 PM 15* 30 6:30 AM 11:30 PM 30 6:30 AM 10:30 PM 30 502 6:30 AM 8:30PM 15 30 No Service * At time of writing, 15 minute service on the Alderney Ferry recommences at 1:15pm and continues until the end of the service day during the week due to the Macdonald Bridge redecking project. Baseline service is described in the table above. 18

Recommendation That Committee of the Whole Recommend that Halifax Regional Council: Approve the 2016/2017 Halifax Transit Annual Service Plan; Approve the Moving Forward Together Plan as the strategic direction for the growth and development of the Halifax Transit network, with the following corrections (and as outlined in the handout entitled Omissions/Clarifications to Plan ): a) Amend the Route 1 Spring Garden description found in Attachment A, Appendix B, page B1 to reflect two way transit service on Gottingen Street, as shown on map in Appendix A; b) Amend the Route 4 Lacewood description found in Attachment A, Appendix B, page B2 to reflect routing as shown on map in Appendix A; c) Remove Table 6 Level of Service Guidelines found on Attachment A, Section 3.6, page 45; and d) Include a new table to summarize the service spans and frequencies of ferry routes on Attachment A, Appendix D, page D-1. Approve the Moving Forward Principles as the guiding principles for Halifax Transit over the life of the Moving Forward Together Plan; Direct staff to prepare for implementation of the future transit network as described in the Plan and Appendix A Network Maps (Attachment B of the staff report dated March 9, 2016); and Adopt the Performance Measures, including the Ridership Guidelines, as described in Part 6 of the Moving Forward Together Plan (Attachment B of the staff report dated March 9, 2016). 19