North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

Similar documents
PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

Presented by: Presented to:

Project Advisory Team Existing Conditions Meeting Agenda

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Technical Memorandum. Introduction. Projected Traffic Volumes

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

CHAPTER 4 VISION, GOALS AND OBJECTIVES

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

Deer harvest objective for the Deer Plan

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Federal Way City Center Access Study Comment Log Summary

American Association of State Highway and Transportation Officials

Pedestrian Safety Fourth Grade Lesson 1. Subject: Health, Physical Education

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Training Teams and Selection Criteria:

The Facts About Brentwood School s Expansion Plans

Completed Project Justification Package Example

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

Health and Safety Policy for Groups Policy

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

CITY OF STEVENS POINT AGENDA

2017 Active Allegheny Grant Program Program Guidelines

Users Requirements Statement

Appendix C. Travel Demand Forecasting Technical Memorandum

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

Running a Raffle. There are 3 types of Legal Wisconsin Raffles

Grade 11 Performance Task

INSTRUCTIONS Sanctioning a 3PAR Competition

Visit Leader Emergency Action Card

City of Ottawa. Transit Solutions. O c t o b e r

Kowanyama State School Executive Summary

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL

TECHNICAL MEMORANDUM

A template mass rescue operations plan

MY FIRST SERVE PLAYBOOK. Congratulations On Completing the Game Challenge! I am in the grade. on (Write in today s date)

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

Highway Construction

Bikeway Classification

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

South Portland Public Input Meeting Summary Notes and Public Comments

Mount Gravatt State School Executive Summary

STEVENSON HIGH SCHOOL

Technical Briefing Rapid Transit

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Ipswich Central State School Executive Summary

Activity: Energy In-Energy Out

FCS Bowl. Determined at the national level. For more information, please visit

WCSC Walnut Tournament 2018

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

2017 Chili Bowl Classic 5k. FAQ s. About the Race

DOG AGILITY MASTERS TEAM 2012 Tournament Rules

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

Stakeholder Working Group (SWG) Meeting #2 Summary

Sellwood Bridge AM Traffic Evaluation

3 ways to build a healthy future for NSW

2018 Southeast 6 Destination Imagination Regional Tournament

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

Tilghman Elementary School Facility Utilization Committee Meeting Talbot County Education Center Meeting Minutes November 20, 2017

USTA Atlanta Combo Doubles Registration Information Play begins in late April

CSR Campaign Stop, Look, Wave. Traffic Safety Kit INSTRUCTOR S GUIDE

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Kilkivan State School Executive Summary

TITLE TEXT. School Start Times Exploration Update. Presented by Scott Nielsen

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

Department of Transportation Project No Rehabilitation of Bridge No Towns of East Haddam and Haddam, Connecticut

BADMINTON WORLD FEDERATION

American Association of State Highway and Transportation Officials

IRATA Safety Bulletin No. 45

Project No.: Notes taken by:

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK

Cosplay Masquerade Grand Final 2018

Cycling Strategy Group. Terms of Reference

[A quorum of the City Council may attend this meeting]

Activity 2: The Incredible Journey

PEDESTRIAN SAFETY AND ACCESS TASK FORCE MEETING #10 MEETING MINUTES

Year 1 for New School Counselors

TRANSPORTATION DISCUSSION GROUP Laptop notes (as projected on screen during the meeting) Monday, June 10, 2013

STATE OF NORTH CAROLINA Office of the State Auditor

Best Practices: Hosting a Curling Bonspiel. Thank you to the Grand River, North Bay and Windsor-Essex Chapters for your advice!

Topic Sheet No. 5 Safe rigging of rope access equipment

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

Kenmore South State School Executive Summary

Highway Construction

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

East Sussex Highways Highway Asset Inspection Guidance Document

Hilder Road State School Executive Summary

Public School Choice EBR Guidance. North Banks Middle School

Transcription:

MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity Rm Buddy Desai/CH2M Advisry Grup Members File MEETING DATE: December 9, 2015 The furth Advisry Grup meeting fr the Nrth Avenue Recnstructin Prject was held n Wednesday, December 9, 2015 frm 4:00 pm t 6:00 pm at the Brkfield Library. Buddy Desai f CH2M facilitated the meeting. Apprximately 16 members f the Advisry Grup were present at the meeting. Materials Available at the Meeting The Advisry Grup was prvided the fllwing: Agenda Speed Study Results Gap Analysis Results Traffic Vlumes Map Typical Sectins In additin, rll plts f the 4-lane divided and 5-lane with tw-way-left-turn-lane alternatives were taped t the walls fr grup review and discussin. Intrductins Buddy Desai f CH2M facilitated the meeting and intrduced Ed Hinrichs f the Waukesha Cunty Public Wrks Department (Cunty), Bruce Barnes frm the Cunty, and members f the cnsulting team. He then asked Advisry Grup members t intrduce themselves and their interest in the prject. As there were a few members f the public in attendance, they were invited t intrduce themselves as well. Review f CSS Meetings #1 #3 Buddy cntinued the meeting by giving a PwerPint presentatin that included a summary f the first three CSS Advisry Grup meetings. The entire presentatin will be emailed t the Advisry Grup with these ntes and will be psted t the prject s website. The first CSS Advisry Grup meeting discussed a summary f issues affecting Nrth Avenue tday and the visin fr Nrth Avenue as we lk t the future. The secnd CSS Advisry Grup meeting invlved an individual and grup weighting exercise aimed at determining which issues carried mre imprtance 1

than thers. The third CSS meeting dealt with the crash analysis, elements f the prject s Purpse and Need, and the draft radway typical sectins. Drainage/Strmwater Prcess Buddy discussed that the Nrth Avenue Recnstructin Prject lies within the service area f the Milwaukee Metrplitan Sewerage District (MMSD) and is subject t the regulatins, in part knwn as Chapter 13. Chapter 13 rules require the use f a unifrm set f regulatins t manage the increase in runff due t the additin f impervius (paved) surfaces. Chapter 13 dictates that apprpriate water run-ff treatments must be implemented such that the quantity f run-ff frm the 2-year and 100-year flds are nt increased. The Cunty will send the strmwater management plans t MMSD fr review and apprval. Questin Where des the Department f Natural Resurces (DNR) and the Natinal Fld Insurance Prgram (NFIP) play int this prcess? The NFIP maps have nt been updated fr many years. Respnse DNR is an active player in the prcess. The study team will investigate hw the NFIP maps are related t the strmwater run-ff management plan. Questin - Is there a way t weave in swales, etc. with easements Will we need mre right f way t cver drainage areas? Respnse Yes, these will all be cnsidered. The drainage features shuld be cntained within the right f way required fr the prject. It is nt anticipated that additinal right f way will be required fr drainage easements. Speed Survey The results f the speed study were presented t the Advisry Grup. The speed studies were taken near Glen Cve Lane, W. Rckway Lane, Mt. Zin Cemetery, and Hllyhck Lane. The speed studies were cnducted at 2pm at each lcatin. A summary f the speed study data is prvided belw. The main takeaway was that there is speeding n Nrth Avenue with the average speed being 5-7 miles abve the psted speed f 35 mph. Lcatin Date Time f Day Weather/ Pavement Cnditin Psted Speed Average Speed 85 th Percentile Speed Speed Range Glen Cve Lane Octber 1, 2015 2:00 pm 60, Overcast, Dry 35 mph 38.9 mph 41.4 mph 33 mph 45 mph W. Rckway Lane Octber 7, 2015 2:00 pm 65, Partly Cludy, Dry 35 mph 37.4 mph 40.0 mph 32 mph 45 mph Mt. Zin September 30, 2015 2:00 pm 60, Partly Cludy, Dry 35 mph 39.8 mph 42.4 mph 33 mph 48 mph Hllyhck Lane September 29, 2015 2:00 pm 60, Overcast, Dry (Rain in the am) 35 mph 38.7 mph 42.0 mph 32 mph 46 mph Buddy nted that a cuple f Advisry Grup members asked fr speed studies t be perfrmed during rush hur. He stated that during rush hur, there may still be speeding, but given the amunt f traffic, the average running speeds fr the full traffic stream wuld be less. A number f Advisry Grup members discussed the speeding n Nrth Avenue and pssible causes f the speeding. It was nted that lane drps are a significant cntributing factr (speeding up t pass smene befre the lane drps). The Advisry Grup asked the study team t determine which traffic calming elements culd be added t the future Nrth Avenue. It was pinted ut that Nrth Avenue is n the Natinal Highway System 2

(NHS). Design standards and features differ based n radway classificatin, and as such sme calming elements may nt be allwable alng Nrth Avenue. Questin Why isn t the railrad invlved in this Advisry Grup prcess? Respnse Tw members frm the railrad were asked t serve n the Advisry Grup, neither respnded t repeated requests t serve. The railrad will be required t engage as the design prgresses. Gap Analysis The gap analysis was then discussed with the Advisry Grup. The gap analysis determined the availability, r nn-availability, f gaps in traffic n Nrth Avenue fr mtrists t turn nt the radway. The gap analysis was cnducted during the mrning and evening peak hurs. The results are presented belw. The percentages represent the % f time when right turn wait times and left turn wait times exceeded natinally-recgnized acceptable guidelines (6.5 secnds fr a right-turn, and 7.5 secnds fr a left-turn). Lcatin SB Right Turn (am) SB Right Turn (pm) NB Left Turn (am) NB Left Turn (pm) NB Right Turn (am) NB Right Turn (pm) West Hillsdale/ N166th Glen Cve/ Wirth Park Kevenauer/ Rckway Mt. Zin/ Mt. Kisc Hllyhck/ Arrwhead 28% 48% 69% 89% 41% 52% 20% 50% 64% 85% 47% 60% 26% 60% 71% 85% 50% 57% 38% 74% 84% 97% 61% 74% 34% 64% 83% 95% 61% 84% The gap analysis validates the Advisry Grup and ther stakehlders cncerns abut nt being able t turn nt Nrth Avenue during peak perids. The grup discussed that having a median pening, as wuld be the case with a typical fur-lane divided radway, wuld allw rm fr vehicles crss tw lanes f traffic and then stp in the median while waiting fr a gap in the ther directin f traffic. Questin Why isn t the SB Left Turn fr am and pm listed? Respnse Thse numbers wuld be the same as NB Left Turn values since bth lanes f traffic affect the ability t make a left turn. One Advisry Grup member nted that sight lines and speeding cncerns need t be addressed at Lily. Traffic Cunts The traffic cunts fr existing and future years were presented t the CSS Advisry Grup. The fllwing questins and discussin tk place: Questin Wh did the traffic frecasts? 3

Respnse WisDOT determined the frecasted vlumes. They were apprved by the Sutheast Wiscnsin Reginal Planning Cmmissin. Questin The land in this area is already fully develped s hw can traffic increase? Respnse Traffic grwth is influenced by mre than just the area within the crridr. As Nrth Avenue serves a reginal rle as well as a lcal rle, traffic and develpment frm lcatins well utside the prject crridr can influence traffic grwth and directinal travel patterns. Further, imprvements t ther radways (widening, extensin, etc.) wuld likely influence travel patterns and increase/decrease traffic n existing radways based n peratr preferences. Questin Are these traffic prjectins based n 2-lane r 4-lane expansin f Nrth Avenue? Respnse The prjectins are based n the existing 2-lane cnfiguratin. Cmment If yu cmplete this and the ther prpsed prjects in the area, the character f the cmmunity will be cmpletely changed. Initial Alternatives Buddy first discussed the 3-Lane Tw-Way Left Turn Lane (TWLTL) with the Advisry Grup. He reiterated that Nrth Avenue is an NHS rute and therefre must perate at a Level f Service (LOS) f D r better. As all current tw-lane sectins that culd be re-cnstructed as a 3-Lane radway with TWLTL wuld perate at LOS E in 2039, the 3-lane TWLTL has been eliminated frm further cnsideratin. He then presented the tw remaining radway typical sectins the 4-lane Divided Sectin and the 5- Lane TWLTL. He nted that each had been revised since the last Advisry Grup meeting. The ttal Right f Way (R/W) required fr bth alternatives is prpsed t be 130. Questins and cmments during the presentatin included: Questin We need t d mre t accmmdate bicyclists. Mre serius bikers and bike cmmuters want t use the rad, nt the sidewalks. It is imprtant t cnsider multimdal uses because that is what creates this cmmunity. Therefre, can the 12 inside lanes be reduced t prvide mre rm fr bikes in the shared 14 utside lanes? This will give bicyclists a ttal f 5 f pavement t ride n. Respnse Yes this can be cnsidered. Questin What des the 8 terrace serve and why is it s wide? Respnse The terrace prvides safety fr pedestrians n the sidewalks (clear zne fr cars that may leave the radway), rm fr snw strage, and can serve as a lcatin fr utilities. Questin Pedestrians can t crss the 5-Lane TWLTL, there is n safe stpping pint fr them. Medians are mre accmmdating t pedestrians. Are crsswalks ging t be put in alng the crridr? Respnse Crsswalks will be prvided at all signalized intersectins. Mid-blck crsswalks will be investigated. It was als nted by a number f Advisry Grup members that mid-blck crsswalks dn t necessarily stp cars. 4

Questin What traffic calming measures are pssible alng the crridr? Can yu reprt measures which culd be dne legally but are nt apprpriate fr Nrth Avenue and thse which are acceptable fr Nrth Avenue? Respnse Yes, the study team will research this infrmatin and share it with the grup. Rll Plts f Alternatives Brad Heimlich f CH2M then walked the Advisry Grup members thrugh rll plts shwing the 4-Lane Divided and 5-Lane TWLTL alternatives. It was nted that these are preliminary and much mre detailed engineering will fllw. It was als nted that certain elements, such as median pening lcatins, will be determined and discussed at future meetings. Issues discussed during the walkthrugh included: Questin Hw much R/W will need t be purchased? Respnse This will be determined and shared with the Advisry Grup as the design prgresses. The existing R/W width varies alng Nrth Avenue, including sme areas where 130 is already prvided. Questin Which intersectins will get signals? Respnse This will be analyzed and shared with the Advisry Grup as the design prgresses. It is anticipated at this time that the nly signalized intersectins will be 124 th Street, Lilly, Pilgrim, and Calhun Rad. Questin What is the minimum median width? Respnse Fr this crridr, typically the median culd be n less than 24. Reducing the median width less than 16 limits its ability t stre vehicles waiting t make left turns. The rll plt depicted a 30 median width. Questin Where can rundabuts be added? Respnse Rundabuts are safer and gd at mving traffic, but require a lt f R/W. Lcatins where rundabuts can be cnstructed will be investigated by the study team. A rundabut will be investigated at the Pilgrim Rad intersectin. It was determined that a rundabut at Lilly wuld require excessive real estate and was eliminated as an ptin by Waukesha Cunty. Questin Is ne alternative type typically safer than the ther? Respnse As the 4-Lane Divided alternative limits the number f cnflict pints, it wuld expect t perate safer than the 5-Lane TWLTL. The 5-Lane TWLTL wuld prvide better access as a driver culd turn left r right frm almst every lcatin (u-turns t sme driveways wuld likely be an utcme f the implementatin f the 4-Lane Divided alternative. Adjurnment The meeting was adjurned at 6 p.m. 5

6