HYDROSTATIC LEAK TEST PROCEDURE

Similar documents
CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

SECTION PRESSURE TESTING OF PIPING

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

Fluid Sealing Association

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

High-Pressure Boiler Inspection Procedures: A Complete Checklist

PIP PNE00012 Piping Examination and Leak Test Guide

Piped Air SCBA Refilling System Standard

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

OCTOBER 2017 ISSUE Page 1 of 7

ACCU-PULSE Installation and Operation Instructions

Standard Pneumatic Test Procedure Requirements for Piping Systems

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

Lockout Tagout Policy

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Design DSA Steam-Atomized Desuperheater

TECHNICAL DATA. Q = C v P S

Instruction Manual Pressure Relief Valve and Rupture Disc Chlorine or Sulfur Dioxide, Series 869

Fisher DVI Desuperheater Venturi Inline

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA. Q= Cv S

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Fisher DSA Steam-Atomized Desuperheater

v. Size shall be specified on drawings.

September 2018 Pressure Test

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNOLOGIES. M Series. Positive return metering pumps [API675]

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

WKM Model 320F Floating Ball Valve

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

Subpart E. Pressure Testing

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Lockout / Tag out Program

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

Sterile Visual Flow Indicator

Part 192 Subparts J & K. Testing & Uprating

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

Hydrostatic Pressure Testing

Bulletin /06/2012 Supersedes 10/23/00. Installation of John Crane Type 73 Inflatable Mechanical Seal. Page 01 of 10

TECHNICAL DATA CAUTION

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Magnetic level switch type MR783 Instruction Manual

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

TECHNICAL DATA. Q = C v P S

DuraSite 3000 Sample Vessel User's Guide. Version Rev-1

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

DeZURIK. KSV Knife Gate Valve. Safety Manual

The purpose of this task is to prevent damage from occurring to the pipe or it s coating when backfilling an exposed pipeline.

Reviewed: 11/1/12 Effective: 2/1/13 Supersedes: 06/08 Preparer: Owner: Approver: EHS Hub Team Member EHS Hub Team Member EHS Hub Manager

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Annex G (normative) Requirements for Nondestructive Examination

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

SEMATECH Provisional Test Method for Pressure Cycle Testing Filter Cartridges Used in UPW Distribution Systems

INSTALLATION, OPERATION and MAINTENANCE MANUAL

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation Instructions and valve Maintenance Rev. 0 of 29/09/15

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions

SCA Series Inverted Bucket Steam Traps

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

TABLE OF CONTENTS PART 2 - CONFINED SPACES

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

FloWash. Industrial Filter Cart

Pressure Regulators. Operating Instructions. Instrumentation

Warning: NEVER ALTER TEST EQUIPMENT

PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models

DuraSite 500(1) Portable Sample Vessel User's Guide. Version (1) = 90 Duro Wetted O-Rings

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Liquefied gas cargo tanks and process pressure vessels

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Thank You for Attending Today s Webinar. Today s Featured Speaker

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I

TECHNICAL DATA. Q = C v P S

2 Sentry MCL Installation, Operation & Maintenance

The Discussion of this exercise covers the following points:

TECHNICAL DATA. Page 1 of 8. model f /2 (dn40) & 2 (dn50)

LOCKOUT/TAGOUT PROGRAM

Ammonia Refrigeration Valves

TECHNICAL DATA. Table 1 - Specifications

Transcription:

This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics Systems, Inc. HYDROSTATIC LEAK TEST PROCEDURE Standard Operating Procedure Customer Name City, State Project Location Approved for Submittal: Quality Control Manager Date Q-10.1 Job Number Page 1 of 6 Date: 02/12/01

Table of Contents 1.0 Scope. 3 2.0 Responsibility... 3 2.1 Project Supervision..... 3 2.2 Fabrication Personnel...... 3 2.3 Quality Control Representative... 3 2.4 Quality Assurance Manager.... 3 3.0 Documentation...... 3 3.1 Hydrostatic test report. 3 4.0 Equipment and Tools.... 3 4.1 Hydrostatic test pump..... 3 4.2 City water pressure. 3 4.3 Test and fill manifold.. 3 5.0 Procedure.. 4 5.1 Test package... 4 5.2 Prior to testing 4 5.3 Preparing the system for test.. 4 5.4 Test set up... 5 5.5 System pretest..... 5 5.6 Testing 6 5.7 Clean, test and closure report. 6 6.0 Acceptance Criteria......... 6 6.1 Test pressure, duration and media.. 6 6.2 Test duration minimums. 6 7.0 Review and Retention... 6 7.1 Quality Assurance Committee.... 6 Q-10.1 Job Number Page 2 of 6 Date: 02/12/01

1.0 Scope 1.1 This procedure establishes a method to perform hydrostatic testing of piping systems and to meet the hydrostatic leak test requirements of ASME B31.3 and B31.1. 2.0 Responsibility 2.1 The Project Superintendent is responsible for ensuring that field personnel are trained in this procedure and that all aspects of this procedure are adhered to. 2.2 Kinetics Company field personnel are responsible for performing this procedure. 2.3 The Quality Control Representative will monitor testing and prepare test packages to document the test results. 2.4 The Quality Assurance Manager shall ensure that this procedure meets the needs of the contract specifications and will ensure that the Quality Control Representative has been trained to the requirements of this procedure. 3.0 Documentation 3.1 The hydrostatic test report will contain the following information: 3.1.1 Job name and number 3.1.2 The system or line tested 3.1.3 A test description of what was tested and location points 3.1.4 Test duration and medium used 3.1.5 Test gauge identification and calibration date 3.1.6 Test starting date, time, temperature, and pressure 3.1.7 Test completion date, time, temperature, and pressure 3.1.8 Test results (Pass or Fail) 3.1.9 Comments or any additional information 3.1.10 Signatures of essential personnel involved with the test 4.0 Equipment and Tools 4.1 A hydrostatic test pump or source capable of producing 125% of test pressure. 4.2 A separate test pump is not required if the test pressure is lower than the fill source pressure (i.e. city water pressure). 4.3 Test & Fill Manifold 4.3.1 Construct the test assembly using materials compatible with the system. The test manifold will include the following items: (a) The connection to the system to be tested; (b) A minimum of one calibrated pressure gauge; (c) An isolation valve with a disconnect to the pressure source; (d) An isolation valve with a disconnect to the fill source. Q-10.1 Job Number Page 3 of 6 Date: 02/12/01

5.0 Procedure 4.3.2 Optionally, a pressure relief valve set a 110% of test pressure may be included for the following situations: 5.1 Test Package (a) Tests where the chance of an increase in pressure due to thermal expansion of the test medium exists; (b) Tests with pressures are within 50 psig of the lowest rated component in the system or when specified by the design engineer. 5.1.1 Fill out and sign the Test Report. Ensure that the information covered in Section 3.0 is complete. 5.1.2 Optionally, a test diagram may be prepared by marking a P&ID drawing to show the following: (a) Indicate the location of all test blinds; (b) Indicate where jumpers are required; (c) Note all valves that will be closed or open; (d) Indicate the method of determining if leakage occurs across valve seats; (e) Indicate all components to be removed from the test; (f) Indicate all components that are changed for the test. 5.1.3 Submit the Test Report to the Inspector for review prior to setting up the test. 5.2 Prior to testing, confirm that the section to be tested is mechanically complete by verifying that: 5.2.1 all welding has been complete; 5.2.2 the piping has sufficient support to maintain grade and support the weight of the tubing and test medium; 5.2.3 all joints are not insulated and exposed to view; 5.2.4 the system has been checked against the P&ID s and has been punched by the owner s inspector. 5.3 Preparing the system for testing 5.3.1 Remove all components that may be damaged by the test pressure or possible over pressurization. The project engineer or design engineer should determine which components meet these criteria. Special consideration should be given to components such as: (a) Pressure Gauges (b) Regulators, and relief Valves (c) Pressure Transmitters (d) Rupture Disks 5.3.2 Set all control valves in the open position or remove from the test. Q-10.1 Job Number Page 4 of 6 Date: 02/12/01

5.3.3 Make sure that check valve will allow test media and pressure to pass to the entire system. This may be performed as follows: (a) Bypass the valve (b) Remove or block the check assembly (c) Remove the valve from the test 5.3.4 Set ball valves in ½ open position to pressurize the cavity behind valve seats. 5.3.5 Isolate all equipment not included in the test using components compatible with the test pressure, test medium and material. (a) Use sheet gaskets to isolate stainless steel from carbon steel blinds. (b) Clearly mark any fittings used in the test that are not part of the permanent system. 5.3.6 Secure warning tags on all boundary valves or components indicating the individual responsible for the test. 5.4 Test set up 5.4.1 A preliminary pneumatic test may be utilized to confirm the systems closure prior to filling a system with water. This method may be useful in a sensitive environment where leaking test fluids could cause damage to equipment or contaminate an area. This test should not be performed on plastic piping systems. This test may be conducted as follows: (a) Introduce air into the system slowly. (b) Walk the system down and listen for blowing air or whistling. (c) If a leak is detected, correct it after blocking off the air source. (d) Repeat these steps until the air pressure holds at 25 psig for ten minutes. 5.4.2 Only use the specified type of testing media for a particular system. Use chlorine-free water (<25 ppm) for testing systems composed of stainless steel. 5.4.3 Test & fill manifolds will be located at the low point of the system. If the manifold is not at the low point, the gauge pressure reading will be adjusted by deducting the static head pressure to correct for the elevation difference. 5.5 System pretest. 5.5.1 Remove the air from the system. (a) Open the high-point vents and flush until there is no evidence of entrapped air. (b) For systems with no or few high point vents, flush branches and mains with water for a minimum of ten minutes at high flow rates in order to drive air from the system. 5.5.2 Put 25% of the test pressure on the system using the test pump or water source. 5.5.3 After the system and test medium have reached thermal equilibrium, bring the system up to test pressure in increments using the test pump. 5.5.4 Upon reaching a steady test pressure, visually examine all joints for leaks. 5.5.5 Repair leaks where necessary. Q-10.1 Job Number Page 5 of 6 Date: 02/12/01

(a) If a leak is detected in a mechanical joint, do not attempt to adjust or tighten that joint while the system is under pressure. (b) Do not over-tighten mechanical or flanged joints, leaks are often an indication of misalignment, deformed gasket, or galled or dented flange face or fitting. (c) To correct a problem found in either (a) or (b), bleed the pressure off of the system and then perform the corrective action. Once this has been accomplished, retest the system to the original requirements 5.5.6 Hold the test pressure for a minimum of ten minutes and closely monitor the system for a pressure loss. If the pressure holds, notify the Quality Control Representative that the test is ready to begin. The Quality Control Representative will notify the Inspector. 5.6 Testing 5.6.1 With the approval of the Quality Control Representative and the Inspector, isolate the system from the test apparatus and disconnect the test pump during the pressure-hold period. 5.6.2 Note the start time, pressure, and temperature on the test report. If there is a possibility that fluid expansion might exceed the maximum allowed pressure for the test, precautions shall be taken to prevent damage to equipment and hazards to personnel. 5.6.3 The Quality Control Representative and if required, the Inspector, will examine the system while under test as required by the contract specifications. 5.6.4 Upon completion of the examination and the minimum hold period, the Quality Control Representative will log the time, pressure, temperature and results of the test on the test form. The Inspector and the Quality Control Representative will sign the test form. 5.6.5 Carefully, remove the test pressure. 5.6.6 Reinstall any components removed prior to testing and remove any temporary test connections or plugs. It may be advantageous to delay this last step until after cleaning or chemical treatment of the system is completed (if required). 5.7 When required, the Quality Control Representative and the Inspector will complete a test, clean, and closure report upon the completion of all testing, cleaning, or chemical treatment and the piping system has been restored to operational status. 6.0 Acceptance Criteria 6.1 The test pressure, duration, and media will be as specified within the contract documents. 6.2 While under test, the piping system shall not exhibit any detectable leakage for a period specified within the contract documents or as a minimum, the time it takes to visually examine all of the joints in the system. In no case, shall the test be less than 10 minutes. 7.0 Review and Retention 7.1 The Quality Assurance Committee shall review this procedure annually. Q-10.1 Job Number Page 6 of 6 Date: 02/12/01