INSTALLATION & MAINTENANCE INSTRUCTION

Similar documents
INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

Armored Gauge O S & Y Bolted Bonnet Valves Series BB-100

Sterile Visual Flow Indicator

Circular Sight Windows

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Anti-flood device Model B-1

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

Hygienic Bubble Trap Installation and Operations Manual

Engineering Data Sheet

GREIG FILTERS, INC. OPERATION MANUAL

Booster Pump PB4-60 Replacement Kits

Circular Sight Windows

Pressure Dump Valve Service Kit for Series 2300 Units

Eaton Filtration, LLC

Pressure Dump Valve Service Kit for Series 3000 Units

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

Installation Troubleshooting Maintenance Instructions Installation / Start-up

BUTTERFLY VALVES Series 800

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Sight Flow Indicators 300# & 600# ANSI Models:

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Installation / Operation / Maintenance Manual KLINGER Reflex Level Gauge Type R 25

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

OPERATING AND MAINTENANCE MANUAL

CB7 Bayonets Male & Female 1/4", 3/8, & 1/2 Size

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

Manual Actuated Boiler Blowdown Valves

Hydrostatic Pressure Testing

MUD 1. Vent check valves. Instruction and maintenance manual.

MODEL 154XST INSTALLATION AND SERVICE INSTRUCTIONS FOR MODEL 154XST STROBE LIGHT FOR USE IN HARSH ENVIRONMENTS/ HAZARDOUS LOCATIONS

VALVES & MEASUREMENT

64 Series Pressure Reducing Regulators

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

RS(H)20, 25 USER MANUAL

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Temperature Controllers

Installation & Operation Manual Proven Quality since 1892

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

HIGH RATE BASKET STRAINER

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

1305 Series Pressure Reducing Regulators

Operator: Save these instructions for future use!

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

Hydraulic Punch Drivers

PENBERTHY SUBMERSIBLE AUTOMATIC SUMP DRAINER INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

Bulletin /06/2012 Supersedes 10/23/00. Installation of John Crane Type 73 Inflatable Mechanical Seal. Page 01 of 10

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

Eaton Filtration, LLC

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Threaded Closures Installation, Operation & Maintenance

Pressure Relief Valve Instruction Manual

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

Operator: Save these instructions for future use!

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

Hydraulic Piston Accumulators

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

Installation, Operation and Maintenance Manual for Back Pressure Regulator

HYGIENIC SIGHT FLOW INDICATORS

35 TON HYDRAULIC PUNCH WARNING

2 Sentry MCL Installation, Operation & Maintenance

Operation and Maintenance Instructions

! WARNING. Before using this product read and understand instructions.

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

DelVal Flow Controls Private limited

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Installation, Operation, and Maintenance Manual

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

1805 Series Relief Valves

Carbon Fiber Tank with EZ Fill system Fill pressure 4,500 psi (310 bar) Output: up to 4,500 psi (310 bar)

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Operator: Save these instructions for future use!

SCA Series Inverted Bucket Steam Traps

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

3/8" Dr. Air Butterfly Impact Wrench

HYDRAULIC PUNCH DRIVER 38456, 38520, 7306 / 7306SB, 7310 / 7310SB, 7506, 7606SB, 7610SB, 7625 / 7625Pg / 7625PgSB, 7646 / 7646Pg / 7646PgSB

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

PC3_ and PC4_ Pipeline Connectors

Product Bulletin No.: D99-RRV2015-PIB-001

ROPV R40 E Series User Manual

HAYWARD FLOW CONTROL FLV SERIES, PVC/CPVC FILTER VESSEL INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Discharge Relief Valve Operation & Maint.

BioAerosol Nebulizing Generator. Operation and Maintenance User Manual

Transcription:

ARCHON Industries, Inc Liquid Level Gauges Models: BT-LLG ND-LLG INSTALLATION & MAINTENANCE INSTRUCTION Instruction No.: 1014.2 Revision Issued: 3/01/03 Approved: Engineering Manager

Warning ONLY QUALIFIED PERSONNEL WHO ARE FAMILIAR WITH GAUGE GLASS VALVES AND THEIR OPERATION SHOULD UNDERTAKE INSTALLATION OF THIS PRODUCT. Danger Failure to properly install could result in serious personal injury and property damage. Read all warnings and instructions before performing installation or maintenance. Safety glasses and gloves should be worn at all times when working with or examining water gauge glass and connections. Gauge is not suitable for steam-water applications. INSTALLATION 1. Prior to actual installation, turn handwheel on the upper and lower valves clockwise until stem closes against seat. 2. Apply Teflon tape or pipe dope to pipe threads and mount to vessel. It is recommended to use a union type pipe fitting between the gauge valves and vessel connections. 3. Check vessel connections as well as vent and drain connections at each end of the gauge to ensure pressure tightness. 4. Open the valves slightly by turning the valve handwheel counterclockwise very slowly to avoid thermal shock and mechanical stress on the tubular glass sight tube. 5. Allow gauge pressure and temperature to slowly equalize with the vessel. Do not open the valves fully. FAILURE TO SLOWLY BRING THE GAUGE INTO SERVICE WILL CAUSE RAPID PRESSURIZATION OF THE SIGHT TUBE WHICH COULD RESULT IN SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE.

6. Inspect gauge for leaks before proceeding with installation. 7. Ball checks have been installed in the valve bodies to prevent loss of fluid in the event of glass breakage. Open the valves completely after temperature and pressure have equalized to permit the ball checks in the valve bodies to properly seat. In some circumstances where liquid being gauged tends to surge in a rapid manner, ball checks can seat and give a false level reading. SWITCH INSTALLTION If the installation includes capacitive switches, refer to drawing IV- LLGCAPSWITCH for instructions. MAINTENANCE 1. During system shutdown, gauge valves should be left open to allow the gauge pressure and temperature to equalize with the vessel. 2. Should the gauge require maintenance while the vessel is in service, gauge valves should be closed completely to allow the gauge to reach ambient temperature if necessary. Liquid should be carefully drained through the drain valve on the lower gauge valve. Do not proceed with any maintenance unless the gauge has been relieved of all pressure or vacuum and has reached ambient temperature. Gauge should be flushed out to remove any hazardous liquids. 3. Cleaning of the sight tube can be accomplished without removal of the sight tube from the assembly. Using a standard tube brush, access the tube via the vent/drain connections. 4. If removal of the sight tube is necessary, proceed as follows: a. Remove the polycarbonate shield or expanded metal shield by bending the crimped portion of the gauge frame on each end away from the shield to slide the shield out. b. Remove wire from around the sight tube splicer if it exists.

c. Remove two (2) hex socket head screws in the block at each end of the gauge which hold 1-1/4 square x ¼ thick O-ring compression plates in place. d. Push the sight tube up into the upper block as far as is required to allow the lower end of the tube to swing out from inside the gauge frame. e. Carefully lower the sight tube out of the block in the upper end of the gauge frame. ( If the sight tube has a splicer, extra care should be taken so that the sight tube assembly does not disassemble.) f. Remove O-ring compression plates and seals from the sight tube. 5. To install the sight tube, proceed as follows: a. Insert sight tube into splicer if one exists. If a Teflon shrink-tube splicer exists it will be necessary to place Teflon O-rings cushion between adjoining sight tubes and heat-shrink the Teflon splicer in place. b. Slide 1-1/4 square x ¼ thick O-ring compression plates onto each end of the sight tube. c. Slide O-ring seals onto each end of sight tube. d. Push end of sight tube into hole in block inside frame on upper end of gauge as far as is required to enable lower end of the sight tube to swing over and into hole in block inside frame on lower end of the gauge. e. Install two (2) hex socket head screws in the block at each end of the gauge which hold 1-1/4 square x ¼ thick O-ring compression plates in place and tighten securely. 6. Integral valve body contained on each end of gauge to be assembled / disassembled as illustrated in exploded view on the next page. ( When reassembling valve bodies, it is recommended to use a lubrication compound on the threads to protect against corrosion, galling, etc.) Warning Read all warnings and instructions before performing installation or maintenance. Safety glasses and gloves should be worn at all times when working with or examining water gauge glass and connections. Danger Improper installation or maintenance of gauge glass and connections can cause immediate or delayed breakage resulting in bodily injury and/or property damage.

Use And Care DO NOT s DO NOT use glass if it contains any scratches, chips, or any other visible signs of damage. DO NOT reuse any tubular glass packing. DO NOT subject gauge glass to bending or torsional stresses. Use And Care DO NOT s DO NOT over tighten glass packing nuts. DO NOT allow glass to touch any metal parts. DO NOT exceed the recommended pressure of the gauge or gauge glass. DO NOT clean the gauge or gauge glass while pressurized or in operation. DO s DO verify proper gauge has been supplied. DO examine gauge glass and packing carefully for damage before installation. DO install protective guards and utilize automatic ball checks where necessary to help prevent injury in case of glass breakage. DO inspect the gauge glass daily, keep maintenance records, and conduct routine replacements. DO protect glass from sudden changes in temperature such as drafts, water spray, etc.