Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone

Similar documents
SEADUCER BOATS GAS SPORT HYDRO

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Bladerider X8 Assembly Help Notes

Tugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Boat Boat Loader Fitting Instructions

Trogear Bowsprit Through Hull Installation Manual

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

SGY-PM910H2/HL/LR ChainRing Adapter Installation Manual

Remember that you must check your boat before every outing. Visual check of the general condition of the shoes, stretcher, etc.

A. TO PREPARE THE MACHINE FOR USE.

Stevenson Projects Building the Hull Top Deck and Bulkheads

Installation Instructions

INSTALLING THE TRIDENT 11, 13 OR 15 RUDDER

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

Troyer s Gourd Rack 8 unit F R H O P

Lock-N-Load. Bullet Feeder

Depth sensor. Product reference : REV 1. USER GUIDE and INSTALLATION GUIDE. nke Sailing competition

INSTALLING THE PROWLER 13 RUDDER

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

OPPI Rigging Guide 3/2008

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

PT 11 trouble-shooting and maintenance.

Rudder Kit Assembly Instructions for Quest 13

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Constitution Instructions

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

ASSEMBLY INSTRUCTIONS

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the seam joint is.

Disassembling and assembling APP and APP 16-22

E Manual Self tacking system 30

Santa Fe Cycles Assembly Guide Introduction

APP pumps APP and APP Disassembling and assembling

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING COMPRESSORS

TECH SHEET ORANGE PIVOT TOOL INSTRUCTIONS

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

SKI SPECIFICATIONS INSTALLATION, MAINTENANCE, SERVICE INSTRUCTIONS & ILLUSTRATED PARTS LIST

aero naut Order No. 3009/00

In each step, the needed parts are shown the number right below. Locate all parts for the step.

Intro: by firechim on October 3, 2013

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Internal Sealing of Masts

SANTANA STOWAWAY TANDEM WITH AIRLINER SAFECASE AND FTS FOAM TRAY SYSTEM ASSEMBLY AND DISASSEMBLY

Construction Chapters Index

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

ST Shimano Total Integration. Technical Service Instructions. General Safety Information SI-6CT0B

IMPORTANT: RECEIVING INSTRUCTIONS:

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Rocky Mountain Instinct / Pipeline Frame Assembly Guide. Date: March 31, 2017

Operation & Instruction Manual

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Trilogy Theory of Operation

Assembly Instructions. -Cantilever Boat Lifts

Roller System 32 / 40 Open Cassette Fitting & Operating Instructions

Kari-Tek. Kari-Tek. Hydro Skeg Retro-Fitting Instructions. Instructions for retro-fitting of Hydro Skeg

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

Rocky Mountain Instinct / Pipeline Alloy Frame Assembly Guide. Date: April 7, 2017

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

PILOT PEDAL DRIVE INSTRUCTIONS

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

American Flagpole & Flag Co. 1(800)

Rear Drive System SERVICE INSTRUCTION. Specifications SI-R670B

Vision 32 / 40 Open Cassette Fitting & Operating Instructions

INSTALLING YOUR CLC RUDDER

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

BOTTOM BRACKET BEARINGS

RUDDER KIT INSTRUCTIONS

Parts Manual. Scraper Hitches PH:

6146XX-X OPEN STYLE HOSE REELS

Parts List. Description. Additional Considerations. Installation Instructions. Dual/Elite Hydraulic Treadmill Kit (supplied by EPI)

CHAPTER 5 REWIND STARTERS

Miniball Coulomb Excitation Target Chamber

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

Beach Dolly with cradle & keel pad Assembly Instructions

Constant Pressure Crude Oil Container Model CPCCP

INSTRUCTION MANUAL CZ 630/631

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION

8. Carefully layout all the parts of the reservoir setup and clean any dirt, grime or dust from the parts. ( image 8 ) 8

ROAD wheel set. Dealer's Manual DURA-ACE WH-R9100-C24-CL WH-9000 ULTEGRA WH-6800

Rudder Bearing Systems. Durable, water-tight and abrasion-resistant bearing products that eliminate metal-on-metal contact.

Safety System Installation Guide for ARE Wind Poles

REPAIR PART NUMBER NUMBER DESCRIPTION 0137 ELE 0136 ELE 12 VOLT SOLENOID

INSTALLATION INSTRUCTIONS

instructions submersible edition Nov.ʼ2 N O R B E R T B R Ü G G E N Mönchengladbach

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Rocky Mountain Element Technical Manual. Rev B

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

This document to be used with Hurley traditional Davits

Riggers and Associated Parts

Vanguard Sailboats 300 Highpoint Avenue Portsmouth, RI For the dealer nearest you call SAIL

1. A proper preparation of the cone and other material is inevitable prior to a CPTU test.

GEMLUX FISHING SYSTEM INSTALLATION AND USER GUIDE

Keel-stepped and deck-stepped masts,

CRANKSET 1 - TECHNICAL SPECIFICATIONS 2 - COMPATIBILITY CHAIN LINE SIZE 52/39 53/39 55/42 54/42 50/34 52/36. Ultra - torque 11s ULTRA-TORQUE

SailTrack Installation Instructions. External Track

CRANKSET 1 - TECHNICAL SPECIFICATIONS 2 - COMPATIBILITY CHAIN LINE SIZE 53/39-55/42-54/42 BORA ULTRA. 11s BORA ULTRA CRANKSET

Transcription:

CHAPTER PLAN page : 1/8 SAILING BOAT SUSPENDED WITHOUT DECK BEARING SAILING BOAT SUSPENDED WITH DECK BEARING SAILING BOAT SUSPENDED WITH AUTOMATIC BEARING ALIGNMENT RUDDER SYSTEM FOR ANTARES MOTOR BOAT NECESSARY MATERIALS - Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone RÉFERENCES - 051617-068119 NECESSARY TOOLS - Disposable cleaning cloth - Fine adhesive tape - Power drill PREPARATION GENERALITIES - Clean the gel coat excess at the rudder tube entrance. - Check that the stainless steel collar fitted on the rudder shaft is clean. Wipe it carefully if necessary with MEC without scratching the surface. - Fit the open ring on the stainless steel collar just before fitting the rudder. The slit on the ring must be turned forward. - Tighten the open ring with a tie-wrap collar. Make sure the slit on the ring is leaving a gap between 1.5 mm +/- 0,5mm. - Modify carefully if necessary the open ring with a smooth file. - Maintain the open ring tightened with some adhesive tape. - Cut the tie-wrap collar. - Apply some polyurethane glue all around the open ring and stop 10 mm on each side before the opening - Reinstall the rudder - Clean the silicone excess.

page : 2/8 - Introduce the upper bearing inside the rudder tube. SAILING BOAT SUSPENDED WITHOUT DECK BEARING - Stick it with polyurethane glue if there is a gap between the upper bearing and the rudder tube. - Put the compensation ring on the rudder. - Introduce the rudder shaft inside the rudder tube. Take care not to damage the bearing O rings inside the bearing. - Place the upper collar to lock the rudder. Drill a hole into the rudder shaft through the hole's pin of the collar (some rudder shaft are already drilled). - Insert the collar pin or tighten the top rudder shaft square to finish.!

page : 3/8 SAILING BOAT SUSPENDED WITH DECK BEARING Put some silicone all way around on the deck contact surface with the top of bearing. - Bolt the bearing putting silicone on each bolt. - Put on the compensation ring on the rudder. - Pull the rudder up into the rudder tube. - Slip the rubber seal if there is one. - Introduce the rudder shaft inside the upper bearing and the rubbing ring. - Keep the rudder in position. - Make sure the rudder shaft is not constrained between the two up and down bearings (rudder shaft alignment). - Position the upper collar or the bronze square fitting onto the rudder shaft head to block it. - Drill the rudder shaft to fix the locking pin through the upper collar and shaft (some rudder shafts are already drilled). - Fix the collar pin or tighten the bronze square fitting. " # "!

page : 4/8 SAILING BOAT SUSPENDED WITH AUTOMATIC BEARING ALIGNMENT REFER TO PARAGRAPH FOR METHODOLOGY UPPERS/S COLLAR UPPER BEARING UPPER PLASTIC KNEECAP RUDDER SHAFT QUADRANT SEAL RUDDER TUBE LOWER S/S COLLAR LOWER BEARING LOWER PLASTIC KNEECAP HULL COMPENSATION WASHER

page : 5/8 RUDDER SYSTEM FOR ANTARES MOTOR BOAT MOUNTING OF THE RUDDER LAYED ON TO A BRACKET - Check the cleanness of the rudder shaft. Clean it with MEC if necessary, without scratching it. - Fit the quadrings inside the bearings (lips downwards) with grease. - Wipe and degrease the bearings deck surface, the hull liner and the bearing too with MEC. - Apply a track of white silicone on the supporting surface, and on the bearings. - Bolt on the bearings and watertight the bolts with white silicone. - Pull the rudder up inside the rudder tube. Be careful not to damage the quadrings. % " $ Contre! moule de coque & - Maintain the rudder in position with the appropriate tools. - Mount the compensation ring on to the bottom of the rudder shaft. - Mount the bracket. - Tighten the spindle axle on the rudder shaft head. '

page : 6/8 MOUNTING OF A SUSPENDED RUDDER WITHOUT DECK BEARING - Proceed the same as for the mounting on the bracket but mount the compensation ring on the deck. The stub axle is used as vertical stop. " $! % &

page : 7/8 - Drill the deck in a larger diameter than required for the upper bearing. (D+ approx 5 mm). - Position the top bearing in the hole but DO NOT FIX IT YET. - Wipe of dust and degrease the surfaces to seal on the bottom bearing with rag paper and MEC. - Put a track of white silicone on the leaning part of the bottom bearing. - Screw the bottom bearing with silicone on each screw. - Pull the rudder up in the rudder tube while positioning the stub axle and the rubber seal which have been previously greased. - Introduce the top of the rudder shaft in the top bearing. - Maintain the rudder in this position with the appropriate tools. - Check that the rudder shaft is not blocked between the top and bottom bearings alignement. In such case, remove the top bearing and enlarge the hole so that the top bearing can go freely. - Mark the position of the top bearing bolts axis. - Remove the rudder. - Wipe and degrease with MEC. - Position a track of white silicon on the leaning area of the top bearing. - Screw the bearing with white silicon on screws. - Mount the compensation ring on the rudder. - Fix the bracket. Tighten the rubber seal on the rubber tube with two stainless steel collars. - Tighten the stub axle on the rudder shaft. MOUNTING OF THE RUDDER WITH DECK BEARING FITTED ON THE BRACKET

page : 8/8 Deck Upper bearing Steering axle Seal Grease Tightening collar Rudder tube Hull Lower bearing Rudder Bracket Compensation washer