IOC Overview. Overview Requirements WBS Organization Development Plan MO&DA Plan Prototyping and Trade Studies Conclusions

Similar documents
GLAST Large Area Telescope Monthly Mission Review

Monthly Mission Review. Project Status Overview. June 6, Ken Fouts SLAC Gamma-ray Large Area Space Telescope

MPCS: Develop and Test As You Fly for MSL

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Integrated Space Systems

Flight Software Overview

GLAST Large Area Telescope: W.B.S Electronics, Data Acquisition & Flight Software. Gamma-ray Large Area Space Telescope

Monthly Mission Review. TVAC at NRL? Status. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope:

Spacecraft Simulation Tool. Debbie Clancy JHU/APL

GLAST Large Area Telescope:

2017 LOCKHEED MARTIN CORPORATION. ALL RIGHTS RESERVED

Process. Summary results. RFA Status

GLAST Large Area Telescope

Gamma-ray Large Area Space Telescope

SLAC (650) DAQ & FSW

Landsat 8's Emergency RMM

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

Orbiter* Architecting Software Across International Partnerships. Jason LaPointe December 10 th, 2010

Using STPA in the Design of a new Manned Spacecraft

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 09/27/05

D-Case Modeling Guide for Target System

GLAST Large Area Telescope: TEM/TPS TRR

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

Vestas Cold Climate Solutions and next stepsclimate Offerings

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

Distributed Control Systems

Real-Time Smoothness Measurements on Concrete Pavements During Construction

Complex operations on the International Space Station training and execution in manned and unmanned situations

NAOMI Software Design

PEAPOD. Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage. Test Readiness Review

GLAST Large Area Telescope:

Assessing Compliance with United States Government Orbital Debris Mitigation Guidelines

AUTOMATIC HOSE TEST UNIT, TYPE SPU

AGW SYSTEMS. Blue Clock W38X

Model-based Adaptive Acoustic Sensing and Communication in the Deep Ocean with MOOS-IvP

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Proof of concept of a Bio-Containment System for Mars Sample Return Mission

Virtual Breadboarding. John Vangelov Ford Motor Company

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

Safety Manual VEGAVIB series 60

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

7 th International Conference on Wind Turbine Noise Rotterdam 2 nd to 5 th May 2017

exsm.cluster High Availability for TSM Server Michael Abel & Bruno Friess TSM Symposium Oxford September 2005 Hier Kundenlogo

BAROMETER PRESSURE STANDARD PRESSURE CONTROLLER

GLAST Large Area Telescope:

HyperSecureLink V6.0x User Guide

South Bay Coastal Ocean Observing System California Clean Beaches Initiative

Questions & Answers About the Operate within Operate within IROLs Standard

POROUS PLUG CHARACTERIZATION TEST

Training Fees 3,400 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

SeaSmart. Jonathan Evans

ALMA Status Update. October ALMA Doc 1.17, ver. 1.1 October 02, 2013

[XACT INTEGRATION] The Race Director. Xact Integration

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

Status report on the current and future satellite systems by CMA. Presented to CGMS45-CMA-WP-01, Plenary session, agenda item D.1

Solenoid Valves used in Safety Instrumented Systems

GLAST Large Area Telescope:

Safety Manual VEGAVIB series 60

RESILIENT SEATED BUTTERFLY VALVES FUNCTIONAL SAFETY MANUAL

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

BACnet Protocol Implementation Conformance Statement

Severe Accident Management Programmes for Nuclear Power Plants

Flight Systems Verification & Validation Mars 2020 Entry, Descent, and Landing

ERS WAVE MISSION REPROCESSING- QC SUPPORT ENVISAT MISSION EXTENSION SUPPORT

2017 Float and Sensor Workshop. Conveners: Brian King, Steve Riser, Susan Wijffels Local Host: Steve Riser, U. Washington

3. Real-time operation and review of complex circuits, allowing the weighing of alternative design actions.

RELEASE NOTES Onsight Connect for ios Software Version 8.1

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company

Lecture 04 ( ) Hazard Analysis. Systeme hoher Qualität und Sicherheit Universität Bremen WS 2015/2016

Yokogawa Systems and PCI Training

Specifications and information are subject to change without notice. Up-to-date address information is available on our website.

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

BUYER S GUIDE AQUAlogger 530WTD

Bidirectional Forwarding Detection Routing

Surge suppressor To perform its intended functions, an AEI site must have the components listed above and shown in Fig. 4.1.

3M Steri-Vac Sterilizer/Aerator GSX Series. For Life Science Applications. Product. Profile

FIG: 27.1 Tool String

Rimage Everest 600 Thermal Retransfer Printer

Robotic On-Orbit Satellite Servicing: One Size Does Not Fit All

Data Sheet T 8389 EN. Series 3730 and 3731 Types , , , and. EXPERTplus Valve Diagnostic

Sorensen DCS Series. 1 3 kw V A. General Purpose Systems Power Supply

Ingersoll Rand. X-Series System Automation

Swing Labs Training Guide

Air Diving Inspection of ABC Mock-Up Caisson Project 123

Industrial Compressor Controls Standard Custom

Transit Signal Preemption and Priority Treatments

SLDMB Project NSS NIF. Brian Stone Canadian Coast Guard 2011

Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004

SWIFT. The Stratospheric Wind Interferometer for Transport Studies

HumiSys HF High Flow RH Generator

Improving the Measurement Accuracy of Water Partial Pressure Using the Major Constituent Analyzer

Instrument pucks. Copyright MBARI Michael Risi SIAM design review November 17, 2003

South Bay Coastal Ocean Observing System California Clean Beaches Initiative

DeZURIK. KSV Knife Gate Valve. Safety Manual

DD2 Site Preparation Checklist Hardware Site Preparation Specification

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006

Advanced Test Equipment Rentals ATEC (2832) OMS 600

Specifications and information are subject to change without notice. Up-to-date address information is available on our website.

EasySas. The most advanced airlock electronics on the market. Recyclable product. Eco-design. Energy savings

Transcription:

IOC Overview Overview Requirements WBS Organization Development Plan MO&DA Plan Prototyping and Trade Studies Conclusions S. Williams IOC Overview 1

Mission Operations Architecture TDRS Alerts GLAST LAT Instrument Operations Center Two Contacts Per day Routine Data LAT data handling LAT performance Standard product processing Alerts Large loads Target of Opportunity Commands Malindi Spacecraft, IOC and GBM data Mission Ops Center Observatory safety Spacecraft health Commanding Mission scheduling Instrument data handling Schedules Level 0 data for archiving LAT Data Command Loads Status Science Support Center Science scheduling Archiving Guest Observer Support Standard product processing Standard products Schedule requests Standard products Schedule requests GRB Coordinates Network Burst and transient Alerts GBM Data Status Command Loads GBM Instrument Operations Center GBM data handling GBM performance Standard product processing S. Williams IOC Overview 2

LAT Operations Facility Functions The LOF will consist of about 1/2 the resource of the FUSE Control Center at Johns Hopkins University (as shown here). Mission Operations Center (MOC) S/C LAT, and GBM Data, Commands Space and Ground Segments LAT Instrument Operations & Science Data Processing LAT Operations Facility WBS 4.1.B S. Williams, SU-HEPL LAT Data Verification LAT Health & Safety Monitoring LAT Commanding Test & Calibration Data Acquisition Validating & Maintaining Flight Software Alert Processing Level 0 Data, LAT Procs & Uploads Science Plan, Schedules, Level 0 Data Level 0 Data, GBM Procs & Uploads Level 0 Science & Hsk Data Performance & Cal Data Science Plan, LAT Schedules Science Support Center (SSC) Level 1 Data, High Level Products, GBM IOC Data Products, GBM Schedules, Science Plan GBM Instrument Operations Center Data Processing Facility WBS 4.1.D R. Dubois, SU-SLAC Science Data Processing Optimizing Analysis & Processing Algorithms LAT Calibration LAT Performance Assessment Data Distribution Analysis Software Mirror Sites Level 1 Data, High Level Products, LAT IOC Data Products S. Williams IOC Overview 3

FUSE Comparison INTEGRATED TOOLSET SCL SAMMI O2 STK Orbix NDDS IDL The LOF will consist of about 1/2 the resource of the FUSE Control Center at Johns Hopkins University (as shown here inside blue border). Probable common COTS S/W tools are shown in red. S. Williams IOC Overview 4

LAT Operations Facility Functions Instrument Control & Operation Status & condition monitoring, limit checking, procedure development, command generation, trending, logging. Level 0 LAT Data Data acquisition & management, archiving, data distribution, data quality verification. Operations Uploads Flight software updates, command sequences, parameter tables. Test & Calibration Mode control, procedure development, on orbit calibration scheduling, implementation, and data acquisition, systems analysis. Instrument Operations Planning & scheduling, procedure development, upload validation and verification, anomaly resolution. Communication Support LAT IOC interfaces to MOC, SSC, SAS. Operations Environment Maintenance LOF maintenance and upgrade, LAT Testbed maintenance, Database maintenance, crew resource management, documentation. S. Williams IOC Overview 5

IOC Status IOC effort is on schedule and budget Tasks completed since Pre-Baseline Review (2/13/01) Released IOC Level III requirements document and conducted IOC Requirements Review - 5/4/01. Conducted IOC Peer Design Reviews - 8/17/01, 10/11/01. Participated in GLAST Operations Working Group (GLOWG) including revision of GLAST Operations Concept Document. Supported the GLAST Data Products Working Group development of data product ICDs. Supported I&T PDR preparations as Instrument Ops Coordinator. Supported development of Online System (EGSE) requirements. Supported balloon flight EGSE and operations procedures development and 8/4/01 flight. Revised WBS, schedule, and cost estimate to support 6 month launch slip and mandatory descope. Completed inputs to PMCS. S. Williams IOC Overview 6

Requirements Traceability Operations Concept Doc 433-OPS-0001 (8/22/01) Science Req ts Document 433-SRD-0001 9/23/00 Mission Assurance Reqs 433-MAR-0001 10/26/00(11/23/01) Mission System Specification 433-SPEC-0001 4/24/01(12/01) Project Data Mgmt Plan 433-PLAN-0001 (12/01) SGL Comm Interface Spec 433-SPEC-0002 (9/13/00) SC-SI Interface Specification 433-IRD-0001 1/29/01 MOC Functional Reqs Doc 433-RQMT-0001 (9/13/00) Other Specifications LAT Perf Spec. LAT-SS-00010 8/31/00 LAT IOC Perf Spec. LAT-SS-00015 8/31/00 SSC Functional Reqs Doc 433-RQMT-0002 (9/13/00) LAT SAS Spec. LAT-SS-00020 (4/24/01) LAT Ops Facility Spec. LAT-SS-00021 (11/27/01) GLAST Project Specs LAT IOC Spec Source LAT IOC Specs LAT Instrument Specs S. Williams IOC Overview 7

Level II Requirements from OCD Planning Commanding Housekeeping Space/Ground Link Science Data Processing Level 0 Data Processing Instrument Commanding Flight Software Support Alert Processing LOF Instrument Health & Safety Monitoring Test & Calibration Instrument Performance MOC Interface Data Archive & Distribution Instrument Performance Anomalies Software Loads Data Modes Science Data Processing Instrument Performance Data Distribution Mirror Sites SAS Processing Algorithms Calibration Science Analysis Software SSC Interface S. Williams IOC Overview 8

Level II Requirements from MSS Maintainability Coordinate System Metric Units CCSDS Standards Adhere to data standards & formats Monitor & control data quality Maintain processing availability & performance Provide system security Data Packet Req ts Data Quality IOC System Requirements IOC Availability & Security S. Williams IOC Overview 9

Ref: LAT-SS-00021 LOF Level III Requirements Requirement Function Requirement Summary Verification Method 5.2 Level Zero Data The LAT IOC receives the Level 0 GLAST data from the MOC, verifies data quality, and Demonstration distributes the data to the DPF for processing. 5.3 Instrument Health and The IOC monitors, assesses, and records the health and safety of the instrument and Demonstration Safety Monitoring supports the resolution of anomalies. 5.4 Instrument Commanding The IOC develops command uploads and procedures for the instrument to adjust the Demonstration instrument configuration, on-board calibration, or flight software. 5.5 Anomaly Detection and The IOC monitors the LAT instrument for anomalies and provides analyses to support their Demonstration Resolution safe resolution. 5.6 Operational Databases The IOC develops and maintains databases for LAT operations. Demonstration 5.7 Test and Calibration Data The IOC acquires test and calibration data to aid in assessing the performance of the Demonstration Processing instrument and adjust the instrument tables, engineering calibration, or software as required. 5.8 Instrument Performance The IOC monitors and assesses the performance of the instrument. Demonstration Assessment 5.9 Instrument Configuration The IOC monitors and adjusts the instrument configuration, calibration, or software as Demonstration 5.10 Validating and Maintaining LAT Flight Software required. The IOC maintains the onboard LAT flight software. 5.11 LAT Testbed The IOC maintains and operates a LAT testbed for use in developing, validating, and verifying changes to LAT flight software, command procedures, and instrument parameters. Demonstration Demonstration 5.12 Alerts The IOC supports transient event alerts from GLAST. Demonstration 5.13 Data Standards The IOC adheres to mission specified data standards. Demonstration 5.14 Data Formats The IOC adheres to mission specified data formats. Demonstration 5.15 Maintainability and Availability The IOC meets mission specified maintainability and availability requirements 5.16 Security The IOC shall be connected to the other operations and support centers by an intranet of wide area networks that is closed to, or protected from, public users of the external internet per NASA NPD 2810.1. Demonstration Demonstration 5.17 Quality Assurance The IOC shall maintain the integrity of LAT uploads and science data during transmission Demonstration and processing of the data. 5.18 Integration and Test The IOC supports LAT and GLAST mission systems integration and test. Demonstration Support 5.19 Mission Support The IOC supports the GLAST mission launch and orbital operations. Demonstration S. Williams IOC Overview 10

Work Breakdown Structure WBS Task Responsibility 4.1.B Instrument Operations Center Williams 4.1.B.1 Project Management Williams 4.1.B.1.1 Project Administration 4.1.B.1.2 Meetings & Reviews 4.1.B.1.3 Logistics Management 4.1.B.1.4 Travel 4.1.B.1.5 Project Support 4.1.B.2 Performance Assurance TBD1 4.1.B.2.1 IOC Performance Assurance 4.1.B.2.2 IOC Verification 4.1.B.3 Mission & Operations Planning Williams 4.1.B.3.1 Operations Concept Development 4.1.B.3.2 Integration & Test Planning 4.1.B.3.3 Mission Operations Planning 4.1.B.4 LAT Operations Facility TBD2 4.1.B.4.1 System Conceptual Design 4.1.B.4.2 Data Acquisition S/W Development 4.1.B.4.3 Operations Software Development 4.1.B.4.4 Command & Telemetry Development 4.1.B.4.5 LOF System Development 4.1.B.5 LOF Test TBD1 4.1.B.5.1 Test Planning 4.1.B.5.2 Test Development 4.1.B.5.3 Verification Testing 4.1.B.5.4 LOF Interfact Tests 4.1.B.5.5 LOF I&T Travel WBS Task Responsibility 4.1.B.6 LAT Performance Verification Lauben 4.1.B.6.1 Performance Verification Test Planning 4.1.B.6.2 Analysis Software 4.1.B.6.3 Display Software 4.1.B.6.4 LAT Calibration Support 4.1.B.6.5 LAT Testbed 4.1.B.7 LAT Integration & Test TBD1 4.1.B.7.1 Qualification Unit Test Support 4.1.B.7.2 Flight Unit Test Support 4.1.B.7.3 LAT I&T Travel 4.1.B.8 Mission Systems Integration & Test TBD1 4.1.B.8.1 Observatory Testing 4.1.B.8.2 Ground Systems Testing 4.1.B.8.3 Training Simulations 4.1.B.8.4 Launch & Early Operations Support 4.1.B.8.5 MSI&T Travel 4.1.B.9 Mission Operations & Data Analysis Williams 4.1.B.9.1 MO&DA Management 4.1.B.9.2 Science Operations 4.1.B.9.3 LAT Operations 4.1.B.9.4 LOF Systems Support 4.1.B.9.5 LAT Testbed 4.1.B.9.6 LAT Engineering Support S. Williams IOC Overview 11

WBS Organization Operations Integrated Product Team S. Williams, IOC, SU-HEPL R. Dubois, SAS, SU-SLAC D. Thompson, ACD, GSFC R. Schaefer, SSC, GSFC S. Digel, SAS, SU-HEPL N. Johnson, CAL, NRL M. Lovellette, I&T Env Test, NRL R. Claus, I&T Online, SU-SLAC E. do Couto e Silva, I&T SVAC, SU-SLAC D. Lauben, FSW, SU-HEPL H. Sadrozinski, TKR, UCSC Instrument Operations Center WBS 4.1.B S. Williams, SU-HEPL IOC Management WBS 4.1.B.1 S. Williams, SU-HEPL 1 Project Admin 2 Meetings & Reviews 3 Logistics 4 Travel 5 Project Support Performance Assurance WBS 4.1.B.2 TBD1 1 Quality Assurance 2 Verification Mission & Ops Planning WBS 4.1.B.3 S. Williams, SU-HEPL LAT Operations Facility WBS 4.1.B.4 TBD2 LOF Test WBS 4.1.B.5 TBD1 LAT Performance Verification WBS 4.1.B.6 D. Lauben, SU-HEPL LAT I&T Support WBS 4.1.B.7 TBD1 MSI&T Support WBS 4.1.B.8 TBD1 MO&DA WBS 4.1.B.9 S. Williams, SU-HEPL 1 Ops Concept Dev 2 I&T Planning 3 Mission Ops Planning 1 System Conceptual Design 2 Data Acq S/W Dev 3 Operations S/W Dev 4 Command & Telemetry Dev 5 LOF System Dev 1 Test Planning 2 Test Dev 3 Verification Test 4 Interface Tests 5 Travel 1 Test Planning 2 Analysis Software 3 Display Software 4 Calibration Support 5 LAT Testbed 1 Qual Unit Test Support 2 Flight Unit Test Support 3 Travel 1 Observatory Test Support 2 Ground Systems Test 3 Training Sims 4 Launch & Early Orbit Support 5 Travel 1 Management 2 Science Operations 3 LAT Operations 4 LOF Systems 5 LAT Testbed 6 Engineering Support S. Williams IOC Overview 12

WBS Interfaces IOC Management WBS 4.1.B.1 S. Williams Mission & Ops Planning WBS 4.1.B.3 S. Williams Ops Concept Development WBS 4.1.B.3.1 LOF Conceptual Design WBS 4.1.B.4.1 S. Williams Analysis & Display WBS 4.1.B.6.2,3 D. Lauben MOC ICD Dev D. Small SSC ICD Dev J. Norris Online Systems WBS 4.1.9 R. Claus EGSE WBS 4.1.7.A R. Claus Tracker WBS 4.1.4 R. Johnson Calorimeter WBS 4.1.5 N. Johnson ACD WBS 4.1.6 D. Thompson Flight Software WBS 4.1.7.9 J. Russell I&T Prep WBS 4.1.9.3 B. Grist I&T Planning WBS 4.1.B.3.2 Mission Ops Planning WBS 4.1.B.3.3 LAT Operations Facility WBS 4.1.B.4 TBD2 Data Mgmt S/W Development WBS 4.1.B.4.2 TBD2 Operations S/W Development WBS 4.1.B.4.3 TBD2 Cmd & Tlm Database WBS 4.1.B.4.4 S. Williams GLAST Project (MOC & SSC) Tracker WBS 4.1.4 R. Johnson Calorimeter WBS 4.1.5 N. Johnson ACD WBS 4.1.6 D. Thompson Electronics WBS 4.1.7 G. Haller Legend Performance Assurance WBS 4.1.B.2 TBD1 LOF Verification WBS 4.1.B.2.2 TBD1 LOF Test WBS 4.1.B.5 TBD1 LOF Development Model WBS 4.1.B.4.5.1 TBD2 LOF Operations Model WBS 4.1.B.4.5.2 TBD2 Mech Systems WBS 4.1.8 M. Nordby I&T WBS 4.1.9 E. Bloom PA WBS 4.1.A D. Marsh IOC WBS 4.1.B S. Williams SAS WBS 4.1.D R. Dubois PA WBS 4.1.A D. Marsh QA Support WBS 4.1.B.2.1 TBD1 SSC I/F Test J. Norris MOC I/F Test D. Small DPF WBS 4.1.D.5 K. Young LAT I&T WBS 4.1.B.7 TBD1 MSI&T WBS 4.1.B.8 TBD1 MO&DA WBS 4.1.B.9 S. Williams LAT Performance WBS 4.1.B.6 D. Lauben LAT H/W Testbed Support WBS 4.1.B.6.5 Analysis & Display WBS 4.1.B.6.2,3 LAT Performance Verification WBS 4.1.B.6.1 LAT Calibration WBS 4.1.B.6.4 CU I&T Support WBS 4.1.B.7.1 FU I&T Support WBS 4.1.B.7.2 Obervatory I&T WBS 4.1.B.8.1 GSCT Support WBS 4.1.B.8.2 Sims Support WBS 4.1.B.8.3 L&EO Support WBS 4.1.B.8.4 Management WBS 4.1.B.9.1 Sciene Operations WBS 4.1.B.9.2 LAT Operations WBS 4.1.B.9.3 LOF Systems Support WBS 4.1.B.9.4 LAT Testbed WBS 4.1.B.9.5 Engineering Support WBS 4.1.B.9.6 Flight Software WBS 4.1.7.9 J. Russell EGSE WBS 4.1.7.A R. Claus Online Systems WBS 4.1.9 R. Claus Particle Test WBS 4.1.9 G. Godfrey Calibration WBS 4.1.9 E. do Couto e Silva Calibration WBS 4.1.D.6 E. do Couto e Silva Env. Test WBS 4.1.9 M. Lovellette DPF WBS 4.1.D.5 K. Young MSI&T WBS 4.1.9.7 MOC MSI&T D. Small DPF WBS 4.1.D.5 K. Young SSC MSI&T J. Norris Launch Support WBS 4.1.9.7.5 SSC MO&DA J. Norris DPF WBS 4.1.D.5 K. Young Calibration WBS 4.1.D.6 E. do Couto e Silva MOC MO&DA D. Small Flight Software WBS 4.1.7.9 J. Russell Thermal Analysis WBS 4.1.8 CU I&T WBS 4.1.9.4 FU I&T WBS 4.1.9.6 GSCT, SIM and LEO Support Elec MSI&T WBS 4.1.7.D G. Haller Flight Software WBS 4.1.7.9 J. Russell Mech Systems MSI&T WBS 4.1.8.A M. Nordby Tracker MO&DA WBS 4.1.4.9 R. Johnson Cal MO&DA WBS 4.1.5.C E. Grove ACD MO&DA WBS 4.1.6.A D. Thompson TKR Launch Support WBS 4.1.4.7.4 T. Borden ACD WBS 4.1.6 D. Thompson Calorimeter WBS 4.1.5 N. Johnson Engineering & Science Support M. Nordby S. Williams IOC Overview 13

Development Resources constrained in FY02/03 IOC CDR in 12/03 S. Williams IOC Overview 14

Key IOC Milestones IOC Requirements Review 05/01 IOC Peer Design Review 08/01 IOC Pre PDR 10/01 LAT Instrument PDR 01/02 Online System Specification from I&T 05/02 LAT Instrument CDR 08/02 IOC CDR (TBR) 12/03 LOF S/W Release 1 06/04 Environmental Test Database Release 06/04 LOF-DPF Interface Test 06/04 LOF Development Model Complete 12/04 Observatory I&T Database Release 12/04 LOF S/W Release 2 02/05 LOF-DPF-MOC-SSC Interface Test 1 02/05 LOF-DPF-MOC-SSC Interface Test 2 06/05 LOF Validation & Verification Complete 07/05 GLAST Project milestones in blue S. Williams IOC Overview 15

Key IOC Milestones LOF S/W Release 3 09/05 Ground Systems Compatibility Test (TBR) 09/05 Operations Simulation 1 (TBR) 10/05 Mission Sequence Test (TBR) 10/05 LOF Operations Model Complete, Flight DB Release 11/05 Operations Simulation 2 (TBR) 12/05 IOC Readiness Review 01/06 LOF S/W Release 4 01/06 End-to-end Test (TBR) 01/06 LAT Flight Readiness Review (FRR) 02/06 Operations Simulation 3 (TBR) 02/06 Launch 03/06 LAT Operations Readiness Review L+3d LAT Activation and Checkout Complete L+30d LAT Instrument Commissioning Complete L+60d LAT Verification Phase Complete L+14m S. Williams IOC Overview 16

Documentation Plan Level II Level III Level IV LOF Functional Specification LAT-SS-00021 11/01 LAT LEO Ops Plan LAT-TD-00nnn LAT PSR LAT IOC PDR Report LAT-SS-00428 12/01 LAT IOC Specification LAT-SS-00015 9/00 LOF-DPF ICD LAT-TD-00nnn LOF Operations Concept LAT-SS-00nnn Ground System I/F Reqs Doc TBD LAT Operations Plan LAT-TD-00nnn LOF Performance Specification LAT-SS-00nnn LAT Instrument Ops Manual LAT-TD-00nnn LOF Verification Plan LAT-TD-00nnn LAT CMD & TLM Database LAT-TD-00nnn LAT CDR LAT CDR LAT PSR LAT PSR LOF Software Mgmt Plan LAT-TD-00nnn LAT CDR LAT CDR LAT CDR LAT CDR LOF Crew Res Mgmt Plan LAT-TD-00nnn LOF Facility Specification LAT-DS-00nnn LOF Computer Procurement Spec LAT-DS-00nnn LOF S/W Procurement Spec LAT-DS-00nnn LOF Operations Manual LAT-TD-00nnn LOF CDR LOF CDR LOF CDR LOF CDR LOF PSR S. Williams IOC Overview 17

Development Flow FY02 FY03 FY04 Engineering Model 2 Qual Unit Qual Unit Tests Cal Unit Tests A EM2 EGSE EM2/EGSE Interface Tests QU EGSE LOF Design LOF Dev Module B FSW Dev Support CMD & TLM Databases FSW Testbed Procedures Dev Support C FY05 FY06 A FlightUnit & FU EGSE LAT I&T - Func, TV, Calibration Observatory Env Testing B LOF Verification Testing I/F Tests: MOC, SSC, DPF LOF Operations Model Ground Sys Compatibility Tests Launch & Early Orbit Operations Training Simulations Legend Product Support C LAT Testbed V&V CMD, FSW, Param Uploads Activity Manage S. Williams IOC Overview 18

IOC Development Staffing Manager - S. Williams Technical management, reporting, mission planning, concept and requirements development, command & telemetry database, operations procedures and documentation, I&T support planning, crew resource management. Scientist - D. Lauben LAT performance verification, calibration support, analysis and display prototyping, science planning and ops tools, LAT Testbed support, SSC interface (inst. scheduling), DPF interface (level 0 data & performance metrics). Scientist TBD, late FY05 LAT performance verification, calibration support, analysis and display prototyping, science analysis tools, SSC and DPF interface (analysis tools). Engineer - TBD2, mid-fy03 LOF development, operations S/W development, distributed monitoring, procedure and upload verification & validation, MOC interface (data flow). Engineer - TBD1, FY04 Verification and QA support, test planning, command & telemetry database, operations procedures and documentation, I&T interface, MOC interface (commanding & databases). Programmer - TBD3, FY04 Computer systems management, data processing S/W, operations S/W, LAT Testbed support, LAT Testbed, FSW interface. S. Williams IOC Overview 19

Development Labor Plan Staffing for IOC includes hiring profile of 1 FTE staff in FY03 (TBD2) and 2 FTE in FY04 (TBD1, TBD3) to stabilize at 5 FTEs plus students. IOC Staffing FTE 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FIscal Year Students IOC Staff S. Williams IOC Overview 20

IOC Cost Profile 4.1.B Instrument Operations Center Cost Type $M, Then Year Dollars 0.5 0.4 0.3 0.2 0.1 0.0........................ FY00 FY01 FY02 FY03 FY04 FY05 FY06 Labor M & S ( no Travel ) Travel S. Williams IOC Overview 21

MO&DA Launch Data March 2006 Phase 0 - Launch & early orbit: up to 60 days S/C configuration and checkout: 10 days LAT turn-on, configuration, and checkout: 20 days Subsystem checks Initial in-orbit calibration and alignment LAT commissioning 30 days Initial science observations Instrument Response Functions understood Phase 1 Verification and Sky Survey: 12 months LAT science verification up to 20% of observing time for LAT calibration and test Phase 2 Science Observations: minimum 4 years Peer review driven investigations 5% observing time for LAT calibrations and maintenance S. Williams IOC Overview 22

LAT Operating Modes Science observing modes Standard, Solar Flare, and GRB (TBR), distinguished by trigger criteria and post-trigger rejection cuts (possibly on the ground) for charged particles Each science mode will have well-characterized (and monitored) instrument response functions Engineering-related modes Standby Engineering Calibration SAA Mode Sensors On DAQ On All subsystems configured and ready for transition to nominal observing Used for flight software update, parameter changes, subsystem configuration changes Raw L1T data downlink, other subsystem calibration modes which impact science observing Safing of ACD photomultiplier tubes for high ambient charged particle density environments like the South Atlantic Anomaly All sensor subsystems powered on and housekeeping active All nodes of LAT DAQ powered on and configured, housekeeping active S. Williams IOC Overview 23

LAT Operating Modes (2) Calibration mode /C Science perations Mode /C Observatory E.g. no event filtering, verify FSW and check for rate-dependent effects in LAT response /C Standby / ngineering Mod /C Observatory Begin AT configured and Configure /W load, parameter changes aw L1T data collection, ubsystem calibration modes Other mode Survival - LAT off (survival heaters turned on) /C Software afe Mode /C Observatory ll systems powered on and ower on ACD ll DAQ electronic owered on and Power on and /C Hardware afe Mode /C Observatory AT (SIU) power switched on by S/C AT thermal control by LAT, survival heaters of /C Survival Mode /C Launch Mode /C Early Orbit Mode AT powered off, survival heaters on S. Williams IOC Overview 24

MO&DA Roles Observer Scientist managing science planning and instrument operations, verifying data quality, and interfacing with the DPF/SSC. Consists of two 50% staff positions with lead responsibility on alternating weeks. Off week reserved for science analysis and primary backup. Cross trained with operators. Also filled by collaboration volunteers. Operator Engineers monitoring data acquisition, monitoring LAT health & status, performing daily trend analyses, managing uploads, interfacing to the MOC, scheduling instrument activity. Two fulltime positions with offset shift times to expand coverage. Cross trained with Observers. Also filled by collaboration volunteers. Monitor Staff and collaboration volunteers providing LAT data quality and acquisition monitoring and LAT configuration and performance monitoring during MOC and LOF off-shift periods. S. Williams IOC Overview 25

Monitoring Purpose to ensure integrity of IOC data acquisition and processing to support lights out MOC in monitoring LAT status Exploit worldwide GLAST collaboration to provide distributed monitoring during lights out operations. Monitoring schedule filled weekly by LOF staff and collaboration volunteers. Provide web form with embedded data on data acquisition status, housekeeping, command status, science plan, LAT operations plan, recent data products, S/C alerts, and trend plots. One session requires about 15 minutes with inputs automatically entered in operations log. Provide abundant help and guidance/procedures for anomalies including pager/cell phone of responsible off-shift staff Time IOC GSFC/NRL France/Italy Japan UT PST EST Europe Japan 1-3 17-19 20-22 2-4 9-11 5-7 21-23 0-2 6-8 13-15 9-11 1-3 4-6 10-12 17-19 13-15 5-7 8-10 14-16 21-23 17-19 9-11 12-14 18-20 1-3 21-23 13-15 16-18 22-24 5-7 Concept weekend monitoring schedule with target monitoring periods Primary Monitor Backup Monitor S. Williams IOC Overview 26

Manager - S. Williams MO&DA Staffing Technical management, reporting, mission planning, crew resource management, data analysis, Observer/Operator. Science Observer - D. Lauben LAT science operations, data analysis, calibration support, science planning and operations tools, LAT testbed support, DPF interface. Science Observer S. Digel LAT science operations, data analysis, calibration support, science analysis tools, SSC interface. Instrument Operator - TBD1 LOF management, operations S/W maintenance, LAT testbed support, distributed monitoring management, MOC interface for data acquisition. Instrument Operator - TBD2 Configuration management, verification and QA support, command & telemetry database, operations procedures and documentation, MOC I/F for databases LOF Systems Support - TBD Ground Systems Engineer, instrument operator, computer systems management, data processing & operations S/W maintenance, FSW interface. S. Williams IOC Overview 27

MO&DA Labor Plan Single FTE labeled other represents Monitor contribution from collaboration members. LOF Staffing in MO&DA FTE 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 FY06 FY07 FY08 FY09 FY10 FY11 Fiscal Year Student Other Staff S. Williams IOC Overview 28

Balloon Flight Successful one-day flight in August 2001 from Palestine, Texas BFEM Objective 4 - Demonstrate an efficient data analysis chain that meets the requirement for the future IOC. Demonstrate GSE capable of supporting data acquisition, archive and display from the BFEM and commanding of the BFEM Acquire and display ground test and flight BFEM data for verification of BFEM status Prototype IOC functions in support of flight IOC development Finding 1 - Rapid prototyping and development of new displays and quicklook analysis tools should be supported. facilitates ID and resolution of anomalies, verification of integrated performance, and inclusion of revisions developed by other subsystems Finding 2 - heterogeneous h/w and s/w environment should be supported by using packetized ethernet distribution of data. Allows the re-use of subsystem test s/w and display tools Allows easy augmentation or replacement of hardware functions with available resources S. Williams IOC Overview 29

BFEM IOC for Balloon Flight Balloon, telemetry, disk read Balloon Vessel BfDaq w/disks Gse umbilical RF commands & sampled data -select- NRL vme deframe simple hub NRL TT&C frame archive Single command console for flight Archive, datahub ivte data packets 2nd enet card Slac LAN for Balloon, Commands and Data Archive/Distribution Hub is doubly-isolated via 2nd ethernet card in Slac Sun Private Network Side of Glast-run ivte data Asante Friendly-Hub Sun Wkstn archive Provides: w/datahub 1. DHCP Boot Service 2. Outbound connection 3. Firewall blocks inbound Asante Hub Optional WAN Uplink world internet Outbound internet access via firewall router Gse clients, private net Slac Xgt Win/PC Gsfc Acd Sun Wkstn Ucsc Tkr Sun Wkstn NRL Cal Win/PC Hepl Integ.Data. Sun Wkstn S. Williams IOC Overview 30

Balloon Flight Housekeeping Display Tkr Temperature (C) Simple tabular text, line plots Forward trend extrapolation 45 40 35 30 25 20 15 10 5 Tracker internal temperatures (08/04/01 17:31:30 UTC data time) acdhvt=36.4 o C (red) tkrtavg=20.2 o C (blue) >30.0 o C in 281.3 min 17 Aug 2001 06:52:23 wall clock (US/Pacific) 0 60 50 40 30 20 10 0 10 minutes wrt t0=08/04/01 17:31:30 UTC data time Tkr temp trend Daq Housekeeping (VSAM) 08/04/01 17:31:30 UTCBFEM GPS Time 17 Aug 2001 06:52:22 US/Pacific (wall clock) ch raw calib name 0 1.204 0.72 A tkr2i 1 2.417 2.30 V tkr2v 2 1.791 1.07 A tkr3i 3 3.530 3.35 V tkr3v 4 1.024 0.61 A tkr5i 5 2.027 3.04 V tkr5v <4.8 6 3.351 117.27 V tkrhvv 7 4.964 496.35 ua tkrhvi 8 0.299 25.79 C tkrpst 9 3.431 5.15 V cal5v 10 0.923 0.55 A cal5i 11 0.299 25.69 C calpst 12 0.016 0.02 N/C deadchan 13 2.484 4.97 V acddig5v 14 0.030 1.01 A acddig5i 15 2.461 4.92 V acdana5v 16 0.039 1.29 A acdana5i 17 7.978 28.08 V acd28v 18 0.016 549.65 ma acd28i 19 0.298 25.46 T acdpst 20 3.094 36.45 T acdhvt 21 6.151 12.30 V xgt12v 22 0.008 281.31 ma xgt12i 23 2.922 19.15 C caltopt 24 1.992 497.97 V xgthv0 25 1.876 469.10 V xgthv1 26 1.944 485.99 V xgthv2 27 1.985 496.17 V xgthv2 28 3.235 0.18 g magroll 29 3.415 0.22 g magpitch 30 50.000 0.90 Psi ExtPr 31 3.142 7.72 Psi IntPr <10.0 underpressure alarm S. Williams IOC Overview 31

Balloon Flight Go/NoGo With infrastructure in place, this display took only ~1 hour to create reset wait launch! Wait Wait 17 Aug 2001/07:18 US/Pacific time zone Go! 1000 Xgt Go=0 2000 Acd Go=0 1000 Xgt Go=0 2000 Acd Go=1 1000 Xgt Go=1 2000 Acd Go=1 800 1500 800 1500 800 1500 Xgt 600 400 Acd 1000 Xgt 600 400 Acd 1000 Xgt 600 400 Acd 1000 200 500 200 500 200 500 0 5 11 17 23 Chan TkrX Go=0 0 3 4 7 8 910 131415 19202122 Chan TkrY Go=0 0 5 11 17 23 Chan TkrX Go=0 0 3 4 7 8 910 131415 19202122 Chan TkrY Go=0 0 5 11 17 23 Chan TkrX Go=1 0 3 4 7 8 910 131415 19202122 Chan TkrY Go=1 12 12 12 12 12 12 Tkr X Layer 10 8 6 4 Tkr Y Layer 10 8 6 4 Tkr X Layer 10 8 6 4 Tkr Y Layer 10 8 6 4 Tkr X Layer 10 8 6 4 Tkr Y Layer 10 8 6 4 2 2 2 2 2 2 800 5 10 15 20 25 Tkr F/E Chip Cal Go=0 5 10 15 20 25 Tkr F/E Chip 800 5 10 15 20 25 Tkr F/E Chip Cal Go=1 5 10 15 20 25 Tkr F/E Chip 800 5 10 15 20 25 Tkr F/E Chip Cal Go=1 5 10 15 20 25 Tkr F/E Chip 600 600 600 Cal 400 Cal 400 Cal 400 200 200 200 0 0 20 40 60 80 100 120 140 160 Cal Log end (range 0, fifo order) t = 0+ 0 0 20 40 60 80 100 120 140 160 Cal Log end (range 0, fifo order) t = ~5 min 0 0 20 40 60 80 100 120 140 160 Cal Log end (range 0, fifo order) t = ~15 min S. Williams IOC Overview 32

Balloon Flight Raw Event Display Primitive Display: Shows sample events in real time, has optional display filters (cuts) Minimal calibration/algorithms No event reconstruction Straight Track Cut (Muons): Verify geometry model and alignment between Tracker, Calorimeter, and Acd tiles Verify event synchronization S. Williams IOC Overview 33

Trade Studies Several trade studies will be completed prior to IOC PDR Command management and control (or test executive) software Wide area network interface to GLAST ground segment Location of LAT Operations Facility at Stanford Command and telemetry database software Data analysis and visualization software Data management and realtime display software LOF workstation hardware and operating system Resources are constrained in FY02/03 Leverage I&T online system development by participating in development and planning for evolution to meet IOC requirements. S. Williams IOC Overview 34

LAT Data Path Realtime data: 32 kbps S-band SSR dump: 10 to 150 Mbps X-band Malindi Prime - 2 Mbps Intelsat Backup - 500 kbps ASINet Central Node Fucino, Italy 32 Mbps JSC Houston Malindi gets ~35 Gbits per day from GLAST and 26 Gbits From Swift, and AGILE Equivalent to ~400 kbps continuous Realtime S-Band Data and SSR Data MOC (TBD) NISN or ASINet NISN or Internet 2 via JPL LAT IOC Stanford NISN should support whatever rates we deem necessary for the desired latency Another option is Internet 2 NISN or Internet 2 via ARC Realtime S/C and LAT HSK Data Followed by processed Level 0 Data S. Williams IOC Overview 35

Test Executive Trade Study Company: Product Name Contact and phone # Colorado U/LASP: OASIS Randy Davis 1-303-492-6867; Michelle Kelly 303-492-4624 Harris Corp: OS - Comet Trip Carter 303-738-9122, Cell 303-884-8495, wcarte08@harris.com Interface ControlSystems: SCL Brian Buckley 321-723- 0399, buckley@interfacecontrol.c om Open Source Source is free, but not "open source"- ADA No-C Yes- C, C++, Java Supported Platforms Solaris 2.5.1 Ulatrasparc Unix NT, Solaris VX, Redhat Linux+Realtim e Extensions Export Control No yes no Upfront Cost website http://lasp.colorado.edu/oa sis/oasis.html http://www.sticomet.com/p roducts.asp http://www.interfacecontrol.com/aerospace.htm Talarian: Smart Sockets (formally RT - Works GSFC: ITOS GSFC: ASSIST Abraham Glazer, 650-695- 8050x104,abraham.glazer @talarian.com Bill Mocarsky, William.L.Mocarsky.1@gsf c.nasa.gov Bill Mocarsky, William.L.Mocarsky.1@gsf c.nasa.gov No - C No - C No-C NT, Solaris, Linux Linux, Solaris, Free BSD Linux, IBM AIX no yes yes http://www.talarian.com/ http://itos.gsfc.nasa.gov/ None found. S. Williams IOC Overview 36

SCL Overview Satellite Datafeed Data Acquisition & Decom Real-Time Sensor Data Web Browser escl Statistics Web Browser User Profiles Web Browser Derived Values Current Values ODBC ODBC-Compliant Server DB Sensor Data External (Science) Processing SCL Shared Memory Trigger Events Events Current Values Events Science Characterization escl Health & Science Rules Interface, e-mail address Alerts ODBC-Compliant Server DB Commands Monitor & Calibrate Sensors Sensor Interface Commands Messaging Services Uplink Interface S. Williams IOC Overview 37

Issues & Mitigations Uncertainty in GLAST operations concept for downlink rate, downlinks per day, and downlink margin complicates IOC planning. Participate in GLAST Ops Working Group Provide flexibility in LOF support via global monitoring concept The development schedule for the Mission Operations Center (MOC), Spacecraft, and ground communications segment lags the LAT schedule by approximately 12 months. Performed detailed ground systems functional allocation study and developed level II requirements document. Hold IOC PDR with LAT but allow IOC CDR to match schedule with remainder of ground segment. Resources in FY02/03 are limited. Leverage I&T online system development by participating in development and planning for evolution to meet IOC requirements. Use Systems Engineering resources to support systems level planning and design integration. Exploit balloon flight experience in display prototyping and data visualization. S. Williams IOC Overview 38

Conclusions IOC plan is captured in PMCS and ready for baselining Established cost plan fits available funding Schedule meets program requirements Contingency (24% overall, but 31% on LOF) is adequate Delay in IOC CDR preserves flexibility to accommodate program level changes Requirements flowdown from GLAST Operations Concept must be completed Updates needed for MSS, PDMP, LAT IOC Level II Spec. MOC and S/C selections in spring 2002 is eagerly anticipated Allow development of LOF interface requirements S. Williams IOC Overview 39

Background Material S. Williams IOC Overview 40

Definitions Level 0 Processing - Space-to-ground artifact removal Processing of raw instrument data. Level 0 data processing consists of time-ordering packets, removing corrupted, incomplete, or duplicate packets, annotating quality, and can include separating housekeeping, calibration, science, and engineering data streams. Level 1 Processing Processing of level 0 data into level 1 data. Level 1 data processing consists of creating a database of reconstructed gamma-ray photons and cosmic-rays which includes energy, direction of arrival, quality parameters, and associated exposure maps. Higher Level Science Processing Processing of level 1 data into derived science products. Science data processing includes detecting sources, measuring spectra, determining time histories, and locating potential counterparts in other astronomical catalogs. S. Williams IOC Overview 41

Requirements Traceability Level I Project Specifications Program Plan Requirements Level II Syst em Specifications Level II( a) System Level II(b) Element SC-SI Interface Specification 433-IRD-0001 LAT Instrument Performance Spec. LAT-SP-00010 Operations Concept Document 433-OPS-0001 Mission Assurance Requirements 433-MAR-0001 GS Interface Req ts Document SGL Comm Interface Spec. Mission System Specification 433-SPEC-0001 Science Support Center Spec. Science Req ts Document 433-SRD-0001 Mission Operations Center Spec. Project Data Mgmt Plan 433-PLAN-0009 Inter-Center Interface Spec. LAT IOC Performance Spec. LAT-SP-00015 Other Specifications Level III Subsystem Specifications LAT-ACD Spec. LAT-SP-00016 LAT-T&DF Spec. LAT-SP-00019 LAT-TKR Spec. LAT-SP-00017 LAT-Grid/Therm. Spec. LAT-SP-000xx LAT-CAL Spec. LAT-SP-00018 LAT-Interface Spec. LAT-SP-000xx LAT SAS Spec. LAT-SP-00020 LAT OF Spec. LAT-SP-00021 GLAST Project Specifications LAT IOC Spec Source LAT Instrument Specifications LAT IOC Specifications S. Williams IOC Overview 42

IOC Cost & Commitments S. Williams IOC Overview 43

Schedule S. Williams IOC Overview 44

Schedule S. Williams IOC Overview 45

Key Level III Milestones IOC Requirements Review 05/03/01 IOC PDR 08/17/01 Online System Spec from I&T to IOC 05/01/02 IOC CDR 12/04/03 Calibration Unit Beam Test from I&T to IOC 01/15/04 LAT EMI/EMC Test from I&T to IOC 08/09/04 LAT Vib/Acoustic Test from I&T to IOC 08/30/04 LAT Thermal Test from I&T to IOC 09/21/04 LAT Performance Test from I&T to IOC 10/26/04 LAT Observatory TV Test from SCO to IOC 04/20/05 Ground System Interface Test from SCO to IOC 09/16/05 Mission Sequence Test from SCO to IOC 10/17/05 IOC Readiness Review 01/10/06 End-to-End Test from SCO to IOC 01/17/06 S. Williams IOC Overview 46

Key Level IV Milestones Calibration Unit Database Release 08/07/03 I&T Database Release 12/16/03 Environmental Test Database Release 06/01/04 Data Acquistion S/W Development Release 1 06/17/04 Operations S/W Development Release 1 06/17/04 IOC S/W Release 1 06/17/04 IOC I/F Test A Complete 06/24/04 Development Model Complete 12/06/04 Observatory Integration Database Release 12/13/04 Data Acquistion S/W Development Release 2 01/28/05 Operations S/W Development Release 2 01/28/05 IOC I/F Test 1 Complete 02/04/05 S. Williams IOC Overview 47

Key Level IV Milestones IOC S/W Release 2 02/07/05 IOC I/F Test 2 Complete 06/09/05 LAT Ops Factility Validation & Verification Comp 07/18/05 IOC S/W Release 3 09/15/05 Data Acquistion S/W Development Release 3 09/15/05 Operations S/W Development Release 3 09/15/05 Ground Systems Compatibility Test (TBR) Complete 09/23/05 Simulation 1 Complete 10/07/05 Mission Sequence Test (TBR) Complete 10/24/05 Flight Database Release 11/01/05 Operational Model Complete 11/08/05 Simulation 2 Complete 12/09/05 S. Williams IOC Overview 48

Key Level IV Milestones IOC S/W Release 4 01/18/06 Data Acquistion S/W Development Release 4 01/18/06 Operations S/W Development Release 4 01/18/06 End-to-end Test (TBR) Complete 01/24/06 Flight Readiness Review (FRR) 02/01/06 Training Simulations Complete 02/17/06 Simulation 3 Complete 02/17/06 LAT Activation & Checkout Complete 03/31/06 S. Williams IOC Overview 49

Mission Operations Overview Launch Date: March 2006 Mission Life: 5 year required with 10 year goal Orbit: 470 to 550 km circular orbit, 28.5 inclination. Spacecraft: RSDO spacecraft, to be selected ~spring 2002. Mission Operations Center: TBD, to be selected ~spring 2002. Ground Link: Ground Station (Malindi) Two contacts per day (TBR) to dump the bulk science data. Data volume is 28 Gbits per day. Downlink rate is 150 Mbps (TBR) over an X-band link. S-band used for real time housekeeping telemetry and commanding. Space Link: Space Network Demand Access System (DAS) used for gamma-ray burst alerts, health and safety alerts, and other science and housekeeping functions. Single Access Service (SAS) used for large command uploads and early orbital operations. Multiple Access Service (MAS) used for TOO commanding. Operations Constraints: Earth limb avoidance, radiator, and solar panel pointing constraints. Spacecraft may autonomously adjust its operation (including its pointing) in response to a gamma-ray burst. S. Williams IOC Overview 50

WBS Interfaces LOF Development Model WBS 4.1.B.4.5.1 LOF Operations Model WBS 4.1.B.4.5.2 LOF Test WBS 4.1.B.5 LAT I&T WBS 4.1.B.7 LAT MSI&T WBS 4.1.B.8 LAT MO&DA WBS 4.1.B.9 EGSE WBS 4.1.7.A Online WBS 4.1.9 SVAC WBS 4.1.9 Env Test WBS 4.1.9 Particle Test WBS 4.1.9 DPF WBS 4.1.D.5 Calibration WBS 4.1.D.6 SSC WBS 3.5(TBR) MOC WBS 8.3(TBR) S. Williams IOC Overview 51