BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

Similar documents
I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

GENERAL DESCRIPTION. Page 1 of 5

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

NCTCOG 16-County Crash and Fatality Data

Proposed Project I 35 from Denton to Cooke County Line

NCTCOG 16-County Crash and Fatality Data

PROPOSED FARE RESTRUCTURE. Public Meeting Tuesday, July 11 6:00 pm

NCTCOG 16-County Crash and Fatality Data

Public Hearing Tarrant County. October 11 th, 2012

BICYCLE PUBLIC HEARING INTRODUCTION. Kathy Kleinschmidt, P.E. Bicycle and Pedestrian Coordinator Dallas District

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

connections 2040 the waco metropolitan transportation plan amendment 2

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

IH 20 RANGER HILL PUBLIC MEETING

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

I-10 AT SCENIC LOOP RD. Open House

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Sponsored By: Support From:

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

I-635 LBJ EAST PROJECT

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

3.0 Future Conditions

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Route 29 Solutions Projects

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute

Proposed Action, Purpose and Need Technical Memorandum

DALLAS FORT WORTH. There are several congested sections of road that do not have a logical big fix solution.

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

North Central Texas Council of Governments - Roadway Safety Program Area

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

0.17 Miles West of Josey lane Danieldale Road IH 35E Houston School Road

PUBLIC COMMENTS REPORT WRITTEN COMMENTS SUBMITTED BY WEBSITE, & SOCIAL MEDIA

A: PLANNED P ROJECTS PROJECTS

Roadway Design Manual

DEPARTMENT OF COMMUNITY PLANNING & BUILDING INTEROFFICE MEMORANDUM

SH 68. Meeting with Affected Property Owners September 9, 2014

MASTER THOROUGHFARE PLAN

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

Short and Long Term Needs

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Route 7 Corridor Study

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update

Denton County. Thoroughfare Plan. Draft: December

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

PRESENTATION OUTLINE

DISTRICT BICYCLE PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Transportation Advisory Board

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

STREET AND HIGHWAY PLAN

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

Bicycle and Pedestrian Plans and Improvements

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

FM #: ETDM #: 11241

TRASBURG RANSPORTATION

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

A Vision for Athens: Transportation Plan. By Mac Martin, AICP City Planner

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Washington DC Section of ITE Project Briefing

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

North Texas Real Estate Information System MLS Current Month Summary for: July 2010

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility 2045

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

The Transportation Improvement Program

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

North Central Texas Council of Governments

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

APPENDIXB. Traffic Operations Technical Memorandum

STANLEY STREET December 19, 2017

Chapter 6 Transportation Plan

FM 1110 (Clint Cutoff Road) Widening & Realignment I-10 to SH 20 (Alameda Avenue)

US 69 RELIEF ROUTE STUDY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Regional Transportation Needs Within Southeastern Wisconsin

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

SECTION 8 - INDUSTRIAL PROPERTY AERIAL PHOTOGRAPH: RED OAK INDUSTRIAL PROPERTY INFRASTRUCTURE IMPROVEMENTS (~530 ACRES)

Transcription:

NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: 0009-11-238; 0009-12-215; 0009-12-908 Dallas County and Rockwall County, Texas The Texas Department of Transportation (TxDOT) is proposing improvements to IH 30 from Bass Pro Road in Dallas County to west of FM 2642 in Dallas and Rockwall Counties, Texas. Pursuant to Texas Administrative Code, Title 43, Part 1, Chapter 2, Subchapter E, 2.105 and Code of Federal Regulations, Title 23, Chapter I, Subchapter H, 771.111 and Title 40, Chapter V, 1506, this notice advises the public that TxDOT will be conducting two public meetings for the public s convenience to discuss and receive public comments on the proposed project. The first meeting will be held on Thursday, April 27, 2017, at Royse City High School (cafeteria), 700 South FM 2642 Royse City, Texas 75189. The second meeting will be held on Thursday, May 4, 2017, at the Rockwall County District Courthouse (Liberty Hall), 1111 East Yellow Jacket Lane #401 Rockwall, Texas 75087. Representatives from TxDOT and project consultants will be available to answer questions about the proposed project improvements. Both meetings will present the same information, and will be held in an open house format from 5:30 p.m. to 8:00 p.m. with no formal presentation. Proposed improvements to IH 30 would reconstruct and/or widen this highway from Bass Pro Road in Dallas County to west of FM 2642 in Rockwall County, approximately 17 miles through the Cities of Garland, Rowlett, Rockwall, Mobile City, Fate, and Royse City. Transportation improvements are needed on IH 30 to address current and projected traffic demands and facility deficiencies, and to establish a safe and efficient thoroughfare by which to provide goods and services in the eastern portion of Dallas-Fort Worth (DFW). The proposed improvements include widening from 4 to 6 lanes from west of State Highway (SH) 205 to west of FM 2642; widening from 6 to 8 lanes from Bass Pro Drive to west of SH 205; construction of new frontage roads from Bass Pro Drive to Horizon Road (including bridge structures across Lake Ray Hubbard); bicycle and pedestrian facilities across Lake Ray Hubbard; and ramp and interchange construction and reconfiguration in the project corridor. Additional right-of-way is anticipated to be required along this segment of IH 30. Maps showing the proposed project s location and geometric design will be available for viewing at the public meetings. This information will also available for public inspection Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. at the TxDOT Dallas District Office located at 4777 East Highway 80, Mesquite, Texas 75150; City of Rockwall located at 385 South Goliad Street, Rockwall, Texas 75087; City of Rowlett Public Works located at 4310 Industrial Street Rowlett, TX 75088; City of Fate located at 104 East Fate Main Place, Fate, Texas 75132; City of Royse City located at 305 North Arch Street, Royse City, Texas 75189; City of Garland Municipal Building located at 800 Main Street, Garland, Texas 75040; and TxDOT Kaufman Area Office, 2750 South Washington, Kaufman, TX 75142. The information will also be available online at www.keepitmovingdallas.com under Upcoming Public Hearing/Meeting. All interested persons are invited to attend the public meeting. Written comments from the public are requested and will be accepted for a period of 15 calendar days following the meeting. Written comments may be submitted either in person at the public meeting, by mail to the TxDOT Dallas District Office, Attention: Ms. Grace Lo, P.E., 4777 E. Highway 80, Mesquite, TX 75150-6643, or by email addressed to Grace.Lo@txdot.gov. Written comments must be received or postmarked on or before Friday, May 19, 2017 to be included in the documentation of the public meeting. The public meeting will be conducted in English. Persons interested in attending the meeting who have special communication or accommodation needs, such as the need for an interpreter, are encouraged to contact the TxDOT Dallas District Public Information Office at (214) 320-4480. Requests should be made at least two days prior to the public meeting. Every reasonable effort will be made to accommodate these needs. If you have general questions or concerns regarding the proposed project or the meeting, you may contact the TxDOT IH 30 Rockwall County Project Manager, Ms. Grace Lo, P.E. at 214-320-6627 or e- mail at: Grace.Lo@txdot.gov. You may also contact the consultant project manager, Mr. Wes McClure, P.E. at (469)-621-3120 or by email at WMcClure@bgeinc.com. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Parker Lucas St Paul Lavon Lake Nevada Josephine Caddo Mills Murphy Plano Wylie Lavon Directions To: Richardson Sachse Royse City Rockwall County District Courthouse "Liberty Hall" IH 30 Project Public Meeting / Open House 5:30 P.M, May 4, 2017 Garland PGBT Fate Rowlett Rockwall Lake Ray Hubbard McLendon-Chisholm Heath Union Valley Mesquite Sunnyvale Travis Ranch Forney Terrell Directions: T L Townsend Dr John King Blvd Airport Rd From North take SH 205: head south on SH 205 toward IH 30, turn left onto E Yellow Jacket Ln, the Courthouse is on the right From South take SH 205: head north on SH 205 toward SH 66, turn right onto E Yellow Jacket Ln, the Courthouse is on the right Lake Ray Hubbard Ridge Rd Yellow Jacket Ln Rockwall County Distric Courthouse From West take IH 30: head east on IH 30 E toward SH 205, take exit 68 toward SH 205, turn left onto SH 205, turn right onto E Yellow Jacket Ln, the Courthouse is on the right From East take IH 30: head west on IH 30 W toward SH 205, take exit 69 and merge onto the frontage road, turn right onto T L Townsend Dr, the Courthouse is on the left Rockwall County District Courthouse "Liberty Hall" 1111 E Yellow Jacket Ln # 401 Rockwall, Texas 75087 Goliad St W Yellow Jacket Ln E Yellow Jacket Ln T L Townsend Dr Rockwall County Distric Courthouse

FM 35 Lucas St Paul Lavon Lake Nevada Josephine Caddo Mills Directions To: Wylie Lavon Royse City Royse City High School Sachse PGBT Fate Union Valley IH 30 Project Public Meeting / Open House Rockwall Rowlett Lake Ray Hubbard 5:30 P.M., April 27, 2017 Heath McLendon-Chisholm Sunnyvale Travis Ranch FM 2642 Directions: FM 2642 FM 2515 Royse City High School From West take IH 30 E: head east on IH 30 E, take exit 79 toward to FM 2642, merge onto IH 30 frontage road turn right at S. FM 2642 Royse City High School is on the left FM 35 From East take IH 30 W: head west on IH 30 W, take exit 79 toward to FM 2642, merge onto IH 30 frontage road turn left at S. FM 2642 Royse City High School is on the left FM 2515 Royse City High School 700 S. FM 2642 Royse City, Texas 75189 FM 2642 Royse City High School

IH-30 ROCKWALL COUNTY PROJECT IH-30 FROM BASS PRO DRIVE TO HUNT COUNTY LINE(West of FM 2462) Dallas and Rockwall Counties, Texas CSJ: 0009-11-238, etc

Project Overview Existing 2/2 Mainlanes with 2-Lane Frontage Roads 2040 MTP 3/3 Mainlanes with continuous 2-Lane Frontage Roads BEGIN PROJECT END PROJECT Bayside/Dalrock Interchange Existing 4/4 Mainlanes (Bass Pro Horizon) 3/3 Mainlanes (Horizon SH 205) with no Frontage Roads 2040 MTP 4/4 Mainlanes with continuous 3-Lane Frontage Roads CSJ Limits CSJ 0009-11-241 CSJ 0009-12-220 CSJ 0009-11-238 CSJ 0009-12-215 CSJ 0009-12-219 2

Project Overview Ultimate Schematic - Bass Pro Drive to Horizon Rd 3

Project Overview Ultimate Schematic - SH 205 to Hunt C/L 4

Project Schedule Value Engineering (VE) Workshop February 7-10, 2017 60% Schematic April 2017 Public Meeting April / May 2017 Draft EA (Tech Reports) June / July 2017 Schematic Approval (District /FHWA) January 2018 FONSI March 2019 5

Contact Information TxDOT Project Manager Grace Lo, P.E. Texas Department of Transportation 4777 E Highway 80 Mesquite, Texas 75150-6643 Phone: (214) 320-6627 Email: grace.lo@txdot.gov Consultant Project Manager Michael H. Garrison, P.E. BGE, Inc. 2595 Dallas Parkway, Suite 204 Frisco, Texas 75034 Phone: (972) 464-4811 Email: mgarrison@bgeinc.com 6