rondo aluminium components

Similar documents
USG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE

Installation Instructions Topo Ceiling System

Domed Ceilings and Barrel Vaults

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

Straightaway 130. Sliding & Folding Door Systems. Product Overview. Features. Technical Specifications. Coburn Product Data Sheet

dividers (Converted)-1 12/2/05 10:05 AM Page 5 Donn Ceil Ceil Donn

Ceiling System. Installation Instructions Curvatura 2 x 2

Installation Guide Wall Mounted Angled Flagpole

steel wire cable tray system accessories

INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

CI/SfB (35) Xy May Installation just got easier

Installation Instructions RB 500 Motorized Roller Shades Motorized Roller Shade W/ Fascia Series-Motor Operation...

SPINNAKER POLE TRACK AND GUIDE CONSOLE

- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted.

1. Main Tees: Product: Donn T38 FR QRC Main Tee. Main tees shall be spaced at 1200mm centres.

Steel Wire Cable Tray. Fabrication Guide

Roman Blind Systems. Tel: Silent Gliss

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

K13.12 FACE FIXED PANIC EXIT DEVICE K13 DOORS

S110 Steel Level Panel Installation Instructions

User Manual. User Manual

DDS TECHNOLOGY MARKER SYSTEMS

SECTION 10iS: TAILCONE

steel wire cable tray system accessories

Shimano Di2 Installation on S5

MODEL TRIPEX PULLEY SYSTEM

Standard Hangers and Adapters

GAS STRUT SAFETY INFORMATION

Slide and Turn System SF25

F13.11 PARALLEL HINGES F13 PROJECT-OUT WINDOWS AND TOP HUNG WINDOWS


THE KEENEY MANUFACTURING COMPANY

THOR 10 HAMMER CAGE INSTRUCTIONS

RITEWAY CABLE TRAY AND SUPATRAY

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

M*CARBO Hi-Point Carbine Trigger Spring Kit Download or Print Instructions Contact: Page 1

RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F)

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

SYSTEMS CEILING. [ Between us, ideas become reality. ] AXIOM Perimeter Trim

CHAPTER 5 REWIND STARTERS

Slide and Turn System SF35

features and benefits:

Composite Fencing. Transform gardens with stylish, low-maintenance composite fencing

SECTION 23iS/U: SIDE SKINS

02 Push-to-Close Latch

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

CLIMBING Pads. Straps Gaffs Spikes Hardware

Air Intake Snorkel Kit

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

Price Guide

Installation and Training Manual

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Under Basin Storage Unit

Volleyball. Order online at

Utility Anchor System

1500 Follow Spot Yoke

DICTATOR "DIREKT" Gate Closer

U STAND INSTALLATION INSTRUCTIONS

CONFER IN-GROUND CURVE STEP / IN-GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

BUYING GUIDE ALGOT Storage across the home

FireHalt TM Flexible Cavity Fire Barrier Systems

ENCLOSURE INSTALLATION & MAINTENANCE INSTRUCTIONS PEDESTAL WALL FLOOR SECURITY HARDWARE

The M-UPPT is an universal punch tool. Different punch inserts can be easily switched out. Pin to fix and remove inserts

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Page 1 of 1 04/19/13 SBR

Pool Component Installation Manual. A. Introduction to Installing your Pool

rugby rugby Millennium Posts Aluminium Posts No.1 Posts No.2a Posts No.3 Posts Heavy Duty Posts Post Protectors Rucking Pads

FUJITEC 1200 ESCALATOR. 4.7 Handrail and Handrail Drive Components Removal and Replacement CAUTION!

Assembly Instructions. -Cantilever Boat Lifts

3 Post Pressure Fit System Owner s Manual

RUDDER KIT INSTRUCTIONS

Technical information for hinges

1. Product Name. 2. Product Code. 3. Colour. 4. Brief Description. 5. Contents. 6. Snoezelen Stimulations. Theragym Tear Drop Swing

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

SLAT & LOUVRE FENCING

Airwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness

DICTATOR "DIREKT" Gate Closer

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

Friction Stays: for PVC, timber and aluminium windows HIGH PERFORMANCE

Solar panel. C ground profile (N-S) Omega ballast plate

table of contents bath accessories Cable Drains...19 Cover Plates Drains Drain Conversion Kits...20

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

ELEGANT AND SECURE MODERN BICYCLE PARKING SYSTEMS

Beauty-Line Windows (1957 to 1979)

Installation Guide, MPower Echelon Console

ZODIAC CH 601 XL. Tail Dragger (TD) or tail wheel configuration. TD configuration (shown with dual stick option and center console).

HELM Hinging facility according to EN 795:2012 Typ D. Sliding hardware

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Skylight Rollers For Velux windows

SIMPLAIR PIPING TOOL. JXT Company

Chicago Metallic 4000 Tempra 9/16

Keel-stepped and deck-stepped masts,

Refurbishing TR6 Window Slides. Chuck Hobbs 27 Feb 2017

Intermediate Angle, 0-25, Drilling detail. Angle 26-50, Baulk Plates, Pole Details. Termination Poles, ABC Details

VOLLEYBALL. ORDER ONLINE AT 167

Transcription:

rondo aluminium components The Rondo Aluminium Ceiling System is an alternative to the Rondo DUO Exposed Grid Ceiling System. Unlike the DUO system, the Aluminium Main Tee to Cross Tee intersection is a butt joint which provides a flat, ghost free surface into which the ceiling panel fits. The Cross tees have integrated locking tags enabling them to snap together positively at intersections whilst the Main Tee has a separate splicing plate to join lengths of the Main Tee together. PRIMARY SECTIONS 357 359 24 Face x 38 Aluminium Cross Tee 24 Face x 38 Aluminium Lightweight Main Tee PRIMARY SECTION JOINER 358 359 Main Tee Joiner WALL ANGLES DUO 7 DUO 8 BULKHEAD TRIM Shadowline Wall Angle: Aluminium 19 x 9 x 9 x 15 Aluminium Wall Angle: 32 x 19 321 Aluminium Direct Fix 13 PB PRIMARY SECTIONS 357 359 WALL ANGLES DUO 7 DUO 8 BULKHEAD TRIM PRIMARY SECTION JOINER 358 PRIMARY SUSPENSION CLIP PRIMARY SUSPENSION CLIP 356 Spring Adjusted to suit 359 SUSPENSION ROD BRACKETS 247 Suspension rod Angle Bracket 274 Suspension rod bracket 534 Suspension rod bracket: Timber Steel 547 Suspension rod bracket: Concrete 321 SUSPENSION ROD BRACKETS 356 SUSPENSION ROD 121 5 Soft Gal. Susp. Rod ANGLE BRACKET 188 Angle Bracket 247 274 534 547 SUSPENSION ROD ANGLE BRACKET TOUCH-UP PAINT 772 For steel and aluminium grid (150g can) 121 188 ACCESSORIES 705 706 Stabiliser Clip DUO5/DUO8 Main Tee/Cross Tee Stabiliser Clip DUO6 /DUO7 Main Tee/Cross Tee TOUCH-UP PAINT ACCESSORIES 772 705 706 56

typical application & installation details The typical application and installation details for Rondo s Aluminium Ceiling System are the same as for Rondo s DUO Exposed Grid Ceiling System, except for the following differences: 356 SUSPENSION CLIP The 356 Suspension Clip slips over the upstand of the 359 Main Tee so that its locating lug clicks into the pre-drilled hole in the tee section. The ceiling is leveled by squeezing the prongs of the clip together and sliding the assembly up or down the suspension rod until the required level is achieved then releasing the clip (see Figure 1). 1 CEILINGS: DUO 356 CLIP AND 359 MAIN TEE JOINING 357 AND 359 TEES When the Main 359 and Cross 357 Tees are joined, the sections butt together forming a smooth ghost free intersection (see Figure 2). 2 357 & 359 TEES JOINED 57

typical application & installation details (continued) 358 JOINER PLATE The 359 Main Tees are joined by the 358 Joiner Plate and secured to form a tight junction by bending the tabs closed once positioned through the pre-formed slots in the Main Tee (see Figures 3 & 4). 3 4 358 PRIMARY SECTION JOINER 58

DUO7 & DUO 8 The same aluminium perimeter trims used with the DUO system are colour matched to this aluminium system. Both the DUO7 Shadowline and DUO8 Angle can be used with DUO Perimeter Trim Stabiliser Clips, Rondo 705 (for DUO8) and 706 (for DUO7) (see Figures 5 & 6) The standard perimeter finish is to rest the abutting tee sections onto the perimeter trim. Cutting the tee sections into the perimeter trim is an impractical exercise as movement in the ceiling or the perimeter walls will result in unsightly gaps between grid and trim at perimeters. 5 DUO8 WITH 705 CLIP 6 CEILINGS: DUO 188 ANGLE BRACKET If for any reason, such as bulkhead triing, it is necessary to join the grid and trim permanently the 188 Angle Bracket can be used with self tapping screws or pop rivets through its pre-drilled holes. DUO7 WITH 706 CLIP 321 BULKHEAD TRIM The 321 pre-finished aluminium bulkhead trim provides a matching element between plasterboard bulkheads and the aluminium grid ceiling. 59

aluminium standard grids A 600 600 B 600 600 600 38 600 Yc 24 357/359 C D 400 400 600 E 450 450 F 600 600 600 TABLE 4: SECTION DIMENSIONS RONDO PART NO D AREA 2 Xc Yc WEIGHT kg/m 357/359 38.10 75.47 12.0 12.16 0.204 60

aluminium grid selection guide TABLE 5: TEE SPACING/MAX. ALLOWABLE LOADS SYSTEM SPAN TYPE TYPE ALLOWABLE LOAD kg/m 2 A 359 357 7.0 B 359 357 7.2 C 359 357 10.4 D 359 357 10.1 E 359 357 9.5 F 359 357 10.4 NOTE: Allowable loads are based on suspension points at centres along the Main Tee. All light fittings are to be supported on Main Tees with additional hangers fitted, as required. All maximum allowable load values stated assume the Main Tees are continuously spanned over three (3) or more suspension points. CEILINGS: DUO 61