Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H090571)

Similar documents
TRASBURG RANSPORTATION

Clackamas County Comprehensive Plan

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Regional Transportation Needs Within Southeastern Wisconsin

Performance Criteria for 2035 Long Range Transportation Plan

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

Street Paving and Sidewalk Policy

Kentucky s Surface Transportation System

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Planning and Programming Committee Meeting April 14,

ACTIVE TRANSPORTATION

Project Description Form 8AA

Project Narrative Old Durham Road/Old Chapel Hill Road Complete Streets Project

APPENDIX L: COST ESTIMATING TOOLS

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

STREET AND HIGHWAY PLAN

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

GIS Based Non-Signalized Intersection Data Inventory Tool To Improve Traffic Safety

TRAFFIC IMPACT ANALYSIS

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Multimodal Analysis in the 2010 Highway Capacity Manual

122 Avenue: 107 Street to Fort Road

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Defining Purpose and Need

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

Plant City Walk-Bike Plan

Emerging Methods for Evaluating Transportation Systems Multimodal LOS and Highway Safety Manual

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Project Description Tier Goal Previous SPOT Rank

Providing an Efficient and Multi-modal Transportation System

El Paso County 2040 Major Transportation Corridors Plan

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Policy Number: Effective: 07/11/14 Responsible Division: Planning Date: 07/11/2014 FUNCTIONAL CLASSIFICATION AMENDMENT POLICY

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

City of Jacksonville Mobility Fee Update

Classification Criteria

City of Homewood Transportation Plan

MASTER THOROUGHFARE PLAN

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

North Shore Transportation Improvement Strategy

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Oldham County Major Thoroughfare Plan

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Parks Highway: MP Lucus Road to Big Lake Road

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Chapter 5 Future Transportation

Citywide Sidewalk and Crosswalk Programs

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

ARRENTON RANSPORTATION

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

INCORPORATING CYCLING IN OTTAWA-GATINEAU TRAVEL MODEL. Surabhi Gupta & Peter Vovsha, Parsons Brinckerhoff Inc. Ahmad Subhani, City of Ottawa

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Figure 1: East West Connector Alignment Alternatives Concept Drawing

FMATS Transportation Improvement Program Project Nomination Form

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Section 9. Implementation

Mobility Plan Status Report 2012 Average Annual Daily Traffic

Section 1 Project Description

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

I-105 Corridor Sustainability Study (CSS)

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

WSDOT s Main Street Highways Initiative

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Everyone is a Pedestrian

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

INTERMODAL TRANSPORTATION PLAN

3.0 PROJECT DESCRIPTION

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

APPENDIX C. Systems Performance Report C-1

CITY OF SPOKANE VALLEY Request for Council Action

Waterford Lakes Small Area Study

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Regional Bicycle Barriers Study

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Secondary Road Program

Facilitating Suburban Bike-to-Rail

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

CHARLOTTE COUNTY PUNTA GORDA MPO

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

5.0 Roadway System Plan

HILLSIDE DISTRICT PLAN White Paper

Transcription:

Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H9571) COUNTY RANK SCORING (5% of total) Countywide Ranking (1 points maximum) Enter ranking here (enter N/A if unranked): N/A Refer to document for scoring scale Section Subtotal ADDITIONAL QUANTITATIVE & QUALITATIVE SCORING (5% of total) Congestion (choose one of the following 3 points maximum) Enter existing V/C ratio here:.1 ( ( V/C.8 ) * 75 ) + 15 (V/C<.8=; V/C>1.=3) Enter future V/C ratio here:.6 ( V/C.8 ) * 75 (V/C<.8=; V/C>1.=15) All other projects ( points) Crash History (choose one of the following 15 points maximum) Enter Crash Severity Score 7.6 If over 5, then Severity Score *.15, else here: Enter Crash Density Score here: 42. If over 5, then Density Score *.1, else All other projects ( points) Economic Development (choose one of the following 1 points maximum) Project that provides direct access to an active industrial/business park development site OR proposed new employment location with more than 2 employees (1 points) Project that provides direct access to an existing employment center (one or more employers in close proximity) with more than 2 employees (5 points) All other projects ( points) Multimodal Elements (choose one of the following 15 points maximum) Includes facilities/features for all 3 of the following: bicycles, pedestrians, and transit (15 points) Includes facilities/features for 2 of the following: bicycles, pedestrians, and/or transit (1 points) Includes facilities/features for 1 of the following: bicycles, pedestrians, or transit (5 points) 5 All other projects ( points) Consistency with Plan (choose one of the following 3 points maximum) Project comes from an adopted CTP (3 points) Project comes from a current draft of a CTP that is in development but not yet adopted (2 points) Project comes from an adopted plan other than a CTP (such as a comprehensive plan, land use plan, capital improvement plan, or other locally-adopted document) THIS ONLY APPLIES IN AREAS THAT DO NOT HAVE A CTP (1 points) All other projects ( points) Section Subtotal 25 GRAND TOTAL (County Rank Score *.5 + Additional Quant/Qual Score *.5) 12.5 Lower Section To Be Completed After All Projects Are Scored: Project s Grand Total Score Ranking within County: Project s Grand Total Score Ranking within TARPO Overall: SPOT Points Recommended for Assignment to this Project by TARPO staff: 2

NCDOT Prioritization 3. Project Summary SPOT ID: H9571 Mode: Highway Status: Submitted SR-212, SR-217 (Ike Brooks Road, Rives Chapel Road) From/Cross Street: US 64 Specific Improvement Type: 16 - Modernize Roadway To: US 421 Project Category: Division Needs Length: 6.59 TIP#: Fully Funded in Draft STIP? No Cost to NCDOT: $19,38, Description: Widen and Resurface; This Route Is Effectively Serving As a Bypass of Siler City For Southbound Traffic Originating East of Siler City. Division(s): Division 8 County(s): CHATHAM MPOS(s)/RPO(s): Triangle Area RPO Project Location 5/28/214 1:1 AM Highway 1/4

SR-212, SR-217 (Ike Brooks Road, Rives Chapel Road) SPOT ID H9571 Statewide Mobility Total Score: Quanitative Score Totals: Weight: % Weighted Score: Division Engineer Local Input Points N/A MPO/RPO Local Input Points N/A Regional Impact Total Score: Quanitative Score Totals: Weight: % Weighted Score: Division Engineer Local Input Points Percent: 15% MPO/RPO Local Input Points Percent: 15% Division Needs Total Score: Quantitative Score Division Engineer Local Input Points MPO/RPO Local Input Points Congestion (V/C) (2%) Safety (1%) [Travel Time] Benefit/Cost (2%) 1.39 23.5. Percent: 25% Percent: 25% Totals: Weight: 5% Weighted Score: 2.61 5/28/214 1:1 AM Highway 2/4

SR-212, SR-217 (Ike Brooks Road, Rives Chapel Road) Project Data * SPOT ID H9571 Existing Conditions Project Benefits Existing Cross-Section: Project Cross-Section: Speed Limit: 55 Speed Limit: 55 Length (miles); 6.59 Length (miles): 6.59 Facility Type: Two Lane Highway Facility Type: Two Lane Highway Access Control: None Access Control: None Functional Classification: Local Functional Classification: Local Terrain Type: Rolling TerrainType: Rolling Lane Width: 8 DOT Design Lane Width: 12 Paved Shoulder Width: DOT Design Paved Shoulder Width: Roadway has Curb & Gutter? No Travel Time Savings for 3 Years (Total): Volume (AADT): 325.62 Travel Time Savings for 3 Years (Autos): Capacity: 155 Travel Time Savings for 3 Years (Trucks): Volume/Capacity Ratio:.2 Long-Term Employment: % Autos: 1% % Change in Economy: % Trucks: % Provides Direct Connection to Transportation Terminal? Truck Volume: Does project upgrade how the roadway functions? Crash Density: 42 In CTP or LRTP? Crash Severity: 7.58 CTP/LRTP Name: Critical Crash Rate: 2.94 CTP/LRTP Completion Year: Crash Frequency: Submitted by: Division 8 Severity Index: County Tier Designation: 3 Non-Interstate STRAHNET Route? No Average Commuting Time: 26 Existing Median Type (for Cost Estimation): Pavement Condition Rating: 78 Actual Congested Speed: Travel Time Index: Undivided * Data reflects calculations which include weighted averages (where applicable) and represent raw output from the Department's SPOT On!ine tool and associated databases. No No 5/28/214 1:1 AM Highway 3/4

SR-212, SR-217 (Ike Brooks Road, Rives Chapel Road) SPOT ID H9571 Project Ownership Division Division Percent Regional Impact Division Needs Division 8 1% % % TOTAL Division Points MPO/RPO MPO/RPO Percent Regional Impact Division Needs Triangle Area RPO 1% % % TOTAL MPO/RPO Points Project Cost and Source Construction Cost: $19,38, TIP Unit Right-of-Way Cost: $ Cost Estimation Tool Utilities Cost: $ Cost Estimation Tool Total Project Cost: $19,38, Other Funding: $ None Cost to NCDOT : $19,38, 5/28/214 1:1 AM Highway 4/4

Ike Brooks Road (SR 212) and Rives Chapel Road (SR 217) Ike Brooks Road and Rives Chapel Road are not built to current design standards. Improvements are necessary to modernize this facility. Ike Brooks Road and Rives Chapel Road serve as a defacto bypass route around Siler City, connecting US 64 and US 421. Both of these roads are two-lane rural highways, and both currently have 8-foot lanes. Current (21) AADT on this facility is 46 vehicles per day. The 1996 Chatham County Thoroughfare Plan forecasted 22 traffic volumes to rise to 1 vehicles per day, and listed this facility as a minor collector. Modernization improvements on this facility should improve safety. Problem Statement Developed in 211 by TARPO for SPOT 2.