Fairview and Main Local Streets Improvement Plan

Similar documents
Committed to Service

122 Avenue: 107 Street to Fort Road

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Birmingham Draft Multi-modal Transportation Plan

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

State Street and Pierce Park Lane Intersection Concept Report

Open House #1 Summary

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

MASTER BICYCLE AND PEDESTRIAN PLAN

Bellevue Downtown Association Downtown Bike Series

Bay to Bay Boulevard Complete Streets Project

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Introduction. North 12 th Complete Street Project Overview

42nd Ave N Reconstruction

Plant City Walk-Bike Plan

Welcome. If you have any questions or comments on the project, please contact:

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Transportation 2040 Update: Eudora Public Input As of June 1, 2017

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

FONTAINE AVENUE STUDY Final Report

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

FEEDBACK SURVEY #2: WHO PARTICIPATED

A copy of the draft plan is available at:

CHAPTER 3: Vision Statement and Goals

Pre-Plan Consultation Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

State Highway 44/State Street High Capacity Corridor

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

City of Memphis On-Street Parking Modification Guidelines

KEARNY MESA COMMUNITY PLAN UPDATE

Cycling Master Plan Community Engagement Session WELCOME

Sacramento Grid 2.0. The Downtown Transportation Study

Chapter 3 DESIGN SPECIFICATIONS

Non-Motorized Transportation 7-1

Committed to Service

MAKE YOUR PLACE IN CHANNELSIDE

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Frequently Asked Questions

City of Davis East Covell Corridor Plan

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Major Bike Routes 102 Avenue Workshop April 21, 2015

CONNECTING PEOPLE TO PLACES

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

NEWMARKET UPHAM S CORNER

CITY OF BOISE COUNCIL MEETING MINUTES JUNE 3, 2014 WORK SESSION. City Hall - Council Chambers Final 4:00 PM 150 N CAPITOL BLVD BOISE, ID 83702

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

This page intentionally left blank.

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Moving Ahead. (Community Engagement) Chapter Three

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

Tonight is for you. Learn everything you can. Share all your ideas.

EXECUTIVE SUMMARY. Vision

Pennsylvania Avenue (CR 484) Design Alternatives Study

Austin Avenue Bridges Project. Public Meeting Summary

Safe Routes to School Action Plan Aberdeen, Idaho

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

102 Avenue Corridor Review

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF ELKO BICYCLE AND PATHWAY PLAN

CANDIDATE QUESTIONNAIRE

City of Seattle Edward B. Murray, Mayor

Key objectives of the survey were to gain a better understanding of:

Coming soon: big changes to Eagle Road Many say it's about time, too

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

PEDESTRIAN ACTION PLAN

CPC Parking Lot Riverside Drive. Transportation Rationale

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Richmond, Adelaide and Simcoe Street Pilot Cycle Tracks. Special Report: Opinions of Property Representatives & Drivers

5 CIRCULATION AND STREET DESIGN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Brighton Boulevard Public Input Summary December 2015

17 AVE SE BRT Project

Completing the Street: Denning Drive

Community Task Force March 14, 2018

Comments The Plan for Port Whitby

Duwamish Way-finding and CTR Report

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Appendix A-K Public Information Centre 2 Materials

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Moving Forward with Winnipeg's Downtown Protected Cycling Network

Transcription:

PIM#2 Summary Report Meeting Format Date & Time: Location: Address: Prepared By: Community Open House August 11, 2016 5:30 p.m. 7:30 p.m. Red Lion Hotel 1800 W. Fairview Avenue, Boise Stephanie Borders, HDR Executive Summary The Ada County Highway District (ACHD) is considering reconfiguring travel lanes on Fairview Avenue and Main Street between Whitewater Park Boulevard and 16 th Street and the addition of on-street parking and improved bicycle and pedestrian facilities. If implemented, the project will produce a plan that recommends: Reducing the number of travel lanes on Fairview Avenue and Main Street from four to three Adding on-street parking to Fairview Avenue and Main Street Improving existing bicycle lanes on Fairview Avenue and Main Street Identifying cross-sections for the proposed local streets ACHD held a community open house in June to present options to the public. A second open house was held at the Red Lion Hotel Downtowner on United on August 11, 2016. The focus of the second meeting was to: Present feedback from the first open house on the options preferred by the public Gather more specific feedback on the configuration of local streets and alleyways Present refined options for bike lanes and the location of on-street parking, including the number of parking spaces Exhibits were set up around the room and team members from ACHD, the City of Boise, and HDR visited with attendees to listen to comments and answer questions. A total of 27 people signed in at the meeting. ACHD received a total of 44 comments. Thirteen (13) comments were submitted at the meeting. In addition, thirty-one (31) people responded to an online survey about the project. Comments were accepted from August 11 to August 25, 2016. 1

PIM#2 Summary Report Community Open House Meeting #2 Notification Process ACHD used a variety of methods to inform the public and adjacent property owners about the public meeting, including the following efforts: 3,242 postcards sent via mail. ACHD mailed the postcards two weeks in advance of the meeting. 126 emails were delivered. Two (2) display ads were placed in the Idaho Statesman. The display ads ran on 2016. Six (6) sandwich signs were placed in the area adjacent to the project area. Advertisements via Facebook and Twitter and the ACHD website. Individual meetings were held with St. Luke s Hospital and Local Costruct to discuss the developments and potential impacts. A copy of the invite is included in Appendix A. Attendance The second open house attracted 27 attendees. The number is down from the first meeting which had 59 attendees. Each attendee was politely asked to sign in as they entered the meeting room and was given a fact sheet and a comment form. Copies of the sign-in sheets are included in Appendix B. Attendance 26% Male - 20 74% Female- 7 Media Two representatives of the local media attended and covered the meeting including reporters from: KBOI Channel 2 Idaho Business Review Coverage was positive and the citizens interviewed were positive about what was presented at the meeting. A copy of the IBR article is included in Appendix C. Exhibits Eighteen (18) exhibit boards were displayed at the meeting: Copies of all exhibits are included in Appendix D. Welcome 30 th Street Master Plan Project area map 2

Project overview Project schedule What we heard Crash history Change in travel time - 2040 Main St. - lane reconfiguration Main St.- parking analysis Fairview Ave.- lane reconfiguration Fairview Ave. parking analysis Potential local streets Mixed-use neighborhood local street examples East-West and Alleyways Mixed-use neighborhood local street examples Fletcher Street What s next Project Team in Attendance David Wallace ACHD Deputy Director of Projects and Planning Craig Quintana ACHD Chief Communications Oficer Brooke Green ACHD Project Manager Christy Foltz-Ahlrichs ACHD Senior Communications Specialist Brooke Green ACHD Senior Transportation Planner Tim Curns ACHD Traffic Engineer Karen Gallagher City of Boise Senior Transportation Planner Zach Piepmeyer City of Boise Transportation Planner Cameron Waite HDR Consultant Project Manager Stephanie Borders HDR Consultant Public Involvement Coordinator Comments Comment forms were provided at the meeting, on the project webpage, and as part of an on-line survey. A total of 45 comments were submitted in regards to the project. This overview of comments is intended to be representative of main themes expressed by the public. Reading comments in their entirety will give a fuller picture of public input. Copies of comments received are included in Appendix E. Thirteen (14) comment forms were submitted at the meeting. Thirty-one (31) comments were submitted via the on-line survey. The survey closed on August 25, 2016 in compliance with the closure of the comment period. o One late comment was received on September 2. It is not included in the summary but is attached at the end of Appendix E. The following questions were asked: 3

1. What zip code do you live in? The majority of those who submitted written comments or responded to the online survey live in Boise and most live in the project area. The map below details the primary zip code areas identified. Input by zip code Boise 83702-24 9% 2% 5% 9% 12% 2%2% 7% 52% Boise 83703-3 Boise 83704-4 Boise 83705-2 Boise 83709-1 East Boise 83712-4 West Boise 83714-5 Meridian 83646-1 Meridian 83642-1 4

2. What is your primary mode of transportation on Fairview and Main? Options included: Car Bike Walk Ride the bus Other One respondent marked car and bike on the survey. One person commented that they also walk a lot between the businesses on Fairview and Main. None marked other. 34% Primary Mode of Transportation on Fairview and Main 4% 63% Car - 33 Bike - 11 Walk - 0 Ride the bus -2 Other - 0 3. What is your primary reason for using the corridor? Commute Errands Recreation Own/manage a business on Fairview or Main Other Several respondents checked multiple categories. Answers for Other included: Live in area, attend meetings, visit family in the area, and go downtown. Primary Corridor Use 6% 16% 2% 30% 46% Commute - 24 Errands - 15 Recreation - 3 Own/manage business - 8 Other - 1 5

4. Which option do you prefer for East/West local streets and alleyways? Attendees viewed display boards showing four options: East/West Local Street/Alleyway Options Option A Two 10 foot travel lanes. Option B Two 10 foot travel lanes with 5 foot bike lanes on both sides. Option C Two 10 foot travel lanes with 5 foot bike lanes on both sides, plus two feet of curb and gutter and 5 foot sidewalks on both sides. 57% 39% 4% Option A - 11 Option B - 1 Option C - 15 No response - Comments included: Think it will be very costly to complete the entire plan and would impact existing business in those areas Although Option C may utilize more Right of Way, the dedicated sidewalk for pedestrians and bike lane for cyclists would make these East/West routes more inviting for families and folks living in the surrounding community who would rather not have to take a car This question is confusing. If it's an alleyway and really doesn't have much traffic, A could be ok for peds and cyclists too. But if there's a lot of traffic, it would need bike lanes and side walks, as in C. I can't see option B at all, where would peds go? I like improving bicycle and pedestrian facilities but need to think about how that impacts landowners if condemnation is required to get the land. Sidewlaks, parking and slow traffic! Not sure. Keep them slow and walkable. Smaller streets/lower speeds/safer. Please do not put a street where the alley way is in back of our office building directly on the S.E. corner of 27 th and Main. Option C looks to be a bit too large. I believe pedestrian traffic should be priortized over cyclists. Concern: None of these options have provisions for local parking. 6

5. Do you support a buffered two-way cycle track on Fairview between Garden Street and east of the Boise River? Buffered Cycle Track Attendees viewed display board illustrating: A two-way cycle track for Main Street west of Whitewater Park Blvd. in anticipation of increased bike traffic with the future development of CWI. A buffered two-way cycle track on Fairview Ave. over the Boise River. 32% 14% 11% 43% Yes, as shown - 13 Yes, but with some changes - 3 Probably not - 4 Comments included: Definitely not - 9 Pedestrians and bikes can share. This seems the safest option that accommodates all users. Even though I ride a bike, I would avoid main and fairview, even with the shown buffered configuration I would be happier with a bike lane on each side of the street There are no developments in this area that support this level of pedestrian and/or bicycle capacity. This area is prime commute area between the Connector and the Downtown core. More bike lanes are needed for safety and connectivity to the park systems General Comments More density and transit options other than the private, single-driver automobile. There are more important usages of tax dollars. Even though it is a one way road, have bike lanes on both sides. Dedicated safer cycling lanes and pedestrian walkways that do not abut roads. Give the people more pleasant pathways, leaving the road to the cars! With CWI going in and the expansion of the Whitewater park, this corridor needs to become more bike and pedestrian friendly. I appreciate the efforts you are making. I have a car, truck, and motorcycle, and because of this pay substantial registration fees each year. No special accommodations are made for my motorcycle. Really getting tired of my vehicle registration fees increasing, while all this money gets spent to accommodate bicycles which pay absolutely nothing! We have a very nice greenbelt, with good access. Keep the damn bicycles off the street, or at the very least, require a registration on them and let them at least help offset the costs of all the changes! 7

Concern that as new development is proposed, that the developers be required to provide adequate on-site parking for customers and employees of the new businesses so that they don t have to end up parking on adjacent residential streets. I do not see the benefit of the neighborhood street concept. Why and how would a property owner want to disect their property? It is understood that there will be a need for loading zones in the alleyways, but other than those, there should be no on-street motor vehicle parking. 8