SAFE SYSTEM OF WORK PLAN (SSWP)

Similar documents
SAFE SYSTEM OF WORK PLAN (SSWP)

SAFE SYSTEM OF WORK PLAN (SSWP)

SAFE SYSTEM OF WORK PLAN (SSWP)

Risk Assessment Form (Qualitative)

Working on Roads. Code of Practice. For Contractors with Three or Less Employees

Working on Roads Code of Practice. Three or Less Employees

Safe Work Method Statement

Health & Safety Policy & Plan. Rightway Roofing.

Safe work method statements

BHC-P-07.2 Health Hazards in Construction

Waste Industry Safety & Health

SAFE WORK METHOD STATEMENT CARPENTER

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Hazard Management Making your workplace safer

Method Statement Author

B S Glass Ltd Safety procedures- outsourced Workplaces

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

Contractor / Exhibitor Handbook

Safe Work Method Statement

in Australian Workplaces

responsible present? Y/N (When all controls are in place risk will be reduced). Extension tables are used when cutting large sheet materials

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Safe Work Method Statement

Recognition, Evaluation, and Control of Hazards

HS329 Risk Management Procedure

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

A Checklist for a Health and Safety Risk Assessment

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Input relevant details relating to your trading name, address and any relevant contact details. Organisation Name Trading address

What is an induction? Contribute to OH&S Processes

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

Contractor handbook. Purpose

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

SAFE WORK METHOD STATEMENT

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Working Alone Safety Program

Management of risk. Definition of terms. Managing risks. Risk

To comply with the OHS Act, the responsible manager must carry out and document the following:

Safety File. Contract Avonbourne School Prepared By Steve Steel Date 20 th July 2008

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Western Power Safe Work Method Statement Task details

Safe Work Method Statement Tasks

SAFE WORK METHOD STATEMENT (Part 1)

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

SAFE WORK METHOD STATEMENT SWMS No Version

Working safely in an engineering environment

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

Health, Safety and Welfare Policy

Appendix 4C - Sample SWMS Trenching

WORK METHOD STATEMENT TERMITE PROTECTION

Control of Substances Hazardous to Health (COSHH) Operating Standards

Safe Work Method Statement (SWMS)

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

Our commitment to safety

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Building 24 Roof Safety Assessment

Technical Test Theory Crawler - Tractor/Dozer A34

Participate in a rescue operation

SAFE WORK METHOD STATEMENT

Attachment 2 Risk Assessment Guidelines

Harbour Town Gold Coast Site Induction

Western Power Safe Work Method Statement Task details

Personal Protective Equipment

Safety Essentials. Mandatory rules for our high risk activities

UNIVERSITY OF FERRARA Occupational Health Service Unit Via Savonarola, FERRARA (Italy)

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

LONE WORKING HEALTH AND SAFETY GUIDANCE

PROCEDURES FOR STANDBY

SAFE WORK METHOD STATEMENT

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

PERSONAL PROTECTIVE EQUIPMENT

HAZARD RECOGNITION EVALUATION and CONTROL

CHAPTER 39: SILICA AWARENESS

C-Consequence, P Probability, R-Risk Rating Value Page 2 of 2

TOOL BOX TALK NO3. Use of P.P.E

2.0 Management Systems and Documentation

Work Activity (e.g. Road Work): Work Location:.

WORK METHOD STATEMENT STRUCTURAL STEEL

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

The University of British Columbia Department of Earth, Ocean and Atmospheric Sciences Hazard Identification and Risk Assessment for Field Activities

S31 Opening Statement Working at Height

4 Staff Selection, Appraisal and Development. To prevent harm by identifying and controlling potential hazards.

Control of Allergies to Laboratory Animals

Potential risk of injury to staff

Excavations and Trenches

3.0 Manage. hazardous substances. risks IN THIS SECTION:

WHMIS 1988 & WHMIS 2015

Construction Skills Certification Scheme. Safe Operation of Earthmoving Plant. Site Dumper (Front Loading)

Safe Work Practices / Procedures / Instruction CONFINED SPACE

CONTRACTOR SAFETY INDUCTION HANDBOOK

McKay Moore Drainage Ltd. Health and Safety Policy

Health & Safety Plan `

Do you have a written, effective Injury and Illness Prevention Program (IIPP)? Does everyone know who is responsible for the IIPP in the worksite?

Risk Controls Proposed: (in hierarchy order from the most preferred control)

Minimum Safety Requirements for Contractors Working on Railway Property

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

A MESSAGE FROM THE MD

Transcription:

SAFE SYSTE OF WORK PAN (SSWP) WORKING IN GRAVEYARDS AND CEETERIES

Safe System of Work Plan (SSWP) Guidelines The Safe System of Work Plan (SSWP) complements the Safety Statement required under the Safety, ealth and Welfare at Work Act, although it does not replace the requirement for such a Safety Statement except where employers employing 3 or less employees are in full compliance with the relevant Code of Practice. This guidance outlines the approach to completing the SSWP, it is relevant to contractors, self-employed persons and employees, as the correct use of SSWP will assist users to both complete construction activity in a safe manner and to meet many of their legal health and safety obligations. The Safe System of Work Plan (SSWP) The primary objective of the SSWP is to identify the major hazards associated with your work activities and to ensure that appropriate controls are in place before work commences. SSWP objectives, include: inks the implementation of the Safety Statement directly to the work activity except where employers employing 3 or less employees are in full compliance with the relevant Code of Practice. Focusing on safety for a particular task. The SSWP is completed at the start of each activity, and can be reviewed at any time during the work. Increasing awareness. Prioritizes activity based on risk and encourages the user to consider a range of measures to reduce each risk to as low as reasonably practicable. Communicating through the use of pictograms so that the meaning can be understood by persons who possess little or no English. Being user friendly: just tick the hazards and controls. OR OR Firstly identify the azards or Work Activity of concern by ticking the square boxes in the Select azard or Activity column. Then Tick Risk column is the Risk Assessment i.e. your estimate of the level of the risk associate with the hazard and work activity given the precautions that are already in place. This assessment is based on your consideration of; 1) how likely is it that someone could be harmed and how? and 2) what would the severity of the injury or ill-health be? Identify the estimate of the risk by ticking only one of the 3 boxes provided, for low (the likelihood of an accident occurring is low and the severity is also low), for medium (the level of likelihood and severity increases) and for high (high likelihood that an accident could occur with serious injury potential, ill health or death). The assessment will help you prioritise the high risk hazards and activities first. Next the appropriate control measures to eliminate the hazard or reduce the risk to as low as reasonably practicable should be identified and selected by ticking the square boxes in the Select Control column. Prior to the described work activity starting, confirm that all the arrangements for implementing the selected controls are in place; this must be done in conjunction with the workers at the specific work location. When the control measures are in place tick the round box. The Safe System of Work Plan (SSWP) should be used as a final check to ensure that the identified controls for a specific construction work activity are available and in place. owever safety starts long before any specific construction activity takes place. azard identification, risk assessment, the elimination and control of identified hazards must take place through all stages of construction from the planning stage, through the design process, the tendering process and on to the construction stage so that each specific construction activity will have had safety built in. The SSWP: A 3-part process: PART 1 To be completed by the person planning the activity. Generally, this is carried out by the responsible person/supervisor/foreman and/or engineer prior to work starting: Identify who the employer/self-employed person is, e.g. AZ Contracting td Name of the Responsible Person/Supervisor for the activity, e.g. A N Identify the number of workers in the team, e.g. 3 Identify the specific location of the activity, e.g. plot 23b Describe the specific activity, e.g. Use mini excavator to dig out new grave When the work is to start, the date, e.g. Tuesday, 1st June What skills are required, e.g. excavator driver Plant and Equipment required, e.g. Kobelco 27SR, wheelbarrow, crowbar, shovel and pick azardous aterials, if used, e.g. Weed killer Contact Names & Tel No. in the event of an emergency, e.g. Site Supervisor First Aider s name, and the location of the nearest First Aid Box Are Permits to Work required? Tick type ist requirements that are identified in the Construction Regulations and other egislation as mandatory. Where these requirements are in place a tick mark should be placed in the round box. Note: For sites where more than 20 persons are normally employed at any one time, a site safety representative should be appointed. PART 2 This part deals with hazard identification, risk assessment and control measures. Normally the hazards, risk assessment and controls will be identified by the engineer, supervisor, or foreman prior to work starting. Similarly, the Personal Protective Equipment (PPE), should be selected by ticking the square boxes in the PPE section, and when acquired by ticking the round box. Part 2 of the form may also contain several blank hazard triangles, each labelled with the word identify, and several blank control boxes, each labelled with the word other. As the list of hazards depicted in the form is not exhaustive, where other hazards are identified, these can be written into the blank hazard triangles. Similarly, as the list of controls depicted in the form is not exhaustive, where other controls are identified, these can be written into the blank control boxes. PART 3 This part deals with the signing off of the SSWP. The purpose is to ensure that the form has been fully completed and that relevant persons involved in the work activity have been made aware of the risks and the controls required to eliminate such risks. Initially the person who identifies the hazards, controls and activities based on their knowledge of the work involved and any information made available to them signs off. The next signature is of the competent person identified by site management to ensure that the identified control measures are implemented before the particular work activity takes place. Finally, as the persons involved in carrying out the work activity and to whom the SSWP applies are made aware of the controls for their own safety, each person involved identifies on the form that they have been made aware of these controls. Persons who call to the site and who may also be exposed to any risks arising must be made aware of the controls in place and should also sign the SSWP. Note 1: The completed SSWP must remain at the specific location of the work with the persons carrying out the work activity. The SSWP should be kept in a location which is accessible to all. Note 2: A new SSWP must be completed when (1) a new hazard is identified, (2) the task changes, or (3) the environment changes. Note 3: The completed SSWP must be reviewed on a regular basis. Optional: A record sheet is available inside the back cover. REEBER IF IT S NOT SAFE DON T DO IT, AND INFOR SITE ANAGEENT Published in 2011 by the ealth and Safety Authority. Copyright The ealth and Safety Authority 2011. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the ealth and Safety Authority. We gratefully acknowledge the help and participation of the ASAG group in the production of this form. 4

SAFE SYSTE OF WORK PAN (SSWP) WORKING IN GRAVEYARDS AND CEETERIES Job Details Resources Required Emergency Details Employer Name: Worker Skills: Contact Names & Tel No. Supervisor/ead Person: 1. Number of Workers: 2. Specific ocation: 3. Description of Works: Plant/Equipment: First Aider: Plan No. PART 2 PART 1 ocation of First Aid Box: Start Date: azardous aterials: WORK PERITS REQUIRED ot Electricity Excavation NOTE: A new SSWP must be completed when Confined Space the task or the environment changes. ethod Statement Yes No Before Works Starts the following UST be in place Tick the circle when confirmed Supervision SEECT AZARD OR ACTIVITY Substances Biological Agents and eld Equipment Working Close to the Public TICK RISK FÁS Communication/ Safe Pass Plant/Eq. Cert. CSCS Induction WC & Washing Canteen Drying/Changing Drinking Water First Aid PPE SEECT CONTRO to identify controls required; when control is in place. Approved No Eating/ Spraying Proper abels Safety Data Sheet Secure Storage Containers No Smoking and Wash Sanitizer Risk Assess Selection/ Suitability Warning Signs Procedure Voltage Arrangements for implementing all the selected controls below must be in place before the work described starts ygiene Controls Cable Check/ Protection itter Picker Cover Cuts/Gloves Wash ands Sanitizer Jack ammer/ Vibration Controls Guarding in Place Con Saw/ Abrasive Wheels Compressor & Whip Checks Dust Suppression Pedestrian Compound/ Barriers Pedestrian Routes Controller Plant Security Sander Tool & Equipment Security Plant and Equipment Selection/ Suitability 180 Excavator/ Visual Aids; Set Up PTO Guard Roll Over Protection/ & Access Steps Safe Parking ixer No Passengers Seat Belts Private Parking Reverse Warning Devices ocking Attachments Compressor & Whip Checks Exclusion Zone Over ead ines Ground Conditions ifting Operations Selection/ Suitability orry Crane/ Sensors/Guards Plan ift/sw oad Stability Slinger/ Signaller Check ifting Gear Exclusion Zone Copyright The ealth and Safety Authority January 2011

AZARD OR ACTIVITY RISK CONTRO to identify controls required; circle when control is in place. Upkeep itter Picker Grass Cutting Strimming edge Cutting/ Guarding; Signage Chain Saw/Training; PPE; aintenance Excavation Shoring Trench Box adder/ Access/Egress Cover/Deck No Undermining Prop Supports Restraints Barriers Ground Conditions Ground Frame Secured Spoil Back Chock ighting Exclusion Zone Pumping Accompanied Warning Signs ealth ealth Vaccination Surveillance Programme Silica PART 2 anual andling Risk Assess echanical Aids Work Organisation Safe Footing/ Rough Ground ousekeeping Training PPE Safety elmet Respiratory Safety Boots Eye Protection Safety Gloves Ear Protection i Visibility Vest Knee Pads Equipment Face Protection Safety arness Safety Overalls azards, activities and controls on this SSWP identified by: Date: Time: PART 3 Competent person identified to ensure implementation of the required controls at the appropriate time is: I have been made aware of the hazards & controls for this activity. Signed by Team: NOTE: This list of azards and Controls is not exhaustive and is in no particular order. IF IT S NOT SAFE DON T DO IT AND INFOR SITE ANAGEENT Copyright The ealth and Safety Authority January 2011

FOR TE RECORD (OPTIONA) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 PAN NO. START DATE OCATION PREPARED BY

Safe System of Work Plan (SSWP) Working in Graveyards and Cemeteries Working to create a national culture where all commit to safe and healthy workplaces and the safe and sustainable management of chemicals. EAT AND SAFETY AUTORITY etropolitan Building James Joyce Street Dublin 1 Tel. 1890 289 389 International callers 00353 1 6147000 Fax. (01) 6147020 www.hsa.ie ISBN 978-1-84496-141-2 SA 0359