New Mexico Transportation Funding Challenges

Similar documents
Pavement Management Program

Secondary Road Program

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

Kentucky s Surface Transportation System

GDOT GDOT PowerPoint. Title Page

Keeping good roads good

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

City of Davis Pavement Management Program

POTHOLES IN EDMONTON. Updated: April 4, 2013

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

APPENDIX E Activity Defect Assignment

land transport road assets

Smoothing Out the Bumpy Road Ahead

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

land transport road assets

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Why We do Preventive Maintenance

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Utah Department of Transportation Division of Asset Management taking care of what we have

Driving Indiana s Economic Growth

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

District Construction Projects

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

ADOT Maintenance Data Collection Guide

HIR on Oklahoma Turnpikes

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

State Highway and Bridge Funds

ITEM 3 ATTACHMENT A RESOLUTION NO

News Release Eastern Oregon Region 5

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

YAVAPAI COUNTY PUBLIC WORKS

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Culpeper District. Albemarle County Monthly Report October, 2011

2008 REPORT OF THE HIGHWAY COMMISSIONER

Rigby / Jefferson County Transportation Plan

2018 ROAD MAINTENANCE PROGRAM

Legislative Update Williamsburg Residency

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008

FUNDING SOURCES CHAPTER 6

El Dorado County / Tahoe Roadwork Schedule

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

C ITY OF B EDFORD H EIGHTS

Arkansas State Highway and Transportation Department. Springdale Chamber of Commerce Leadership Springdale Tuesday, February 3, 2015

Reserve Study Navigation Options

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Highway Construction

Highway User Fee Funding Of Local Roads in Illinois. NOT Equitable. NOT Sustainable. October 20, 2015

January 22, Steve Salwei, NDDOT

Pavement Management Report. City Council Meeting of May 21, 2013

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION

SUMMARY OF TRANSPORTATION INVESTMENTS

STATE TRANSPORTATION COMMISSION HEARING

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Paul Vraney Bureau of Project Development 02/11/2016

Kentucky Highway District 7

Paving for Progress Municipal Streets Seminar

MNDOT PAVEMENT DESIGN MANUAL

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

PAVEMENT FUNCTIONAL SURFACE CHARACTERISTICS

Low Traffic Volume LR 159 Low Traffic Preservation

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Culpeper District. Albemarle County Monthly Report September, 2011

Lake Waterford Community Association Meeting. November 15, 2016

I-90 Corridor Performance Corridor Result

Nevada s Transportation Infrastructure and Future Transportation Needs

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Florida s Turnpike System Projected Debt Service Coverage Ratio ($000)*

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Field guide for Accessible Public Rights-of-Way Edition

FY 2005 TRANSPORTATION CAPITAL PROGRAM

VIII. Project Prioritization & Implementation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

Public Transport Asset Management

Toward Zero Deaths Maintaining a Safer Roadway Workshop

Transcription:

New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1

NMDOT DISTRICT OFFICES 5,315 Lane Miles 6,239 Lane Miles 3,345 Lane Miles 2,248 Lane Miles 5,649 Lane Miles 7,650 Lane Miles 6 Districts with a total of 30,446 lane miles District 1 = 5,649 lane miles District 2 7,650 lane miles our largest District and has no interstate miles District 3 2,248 lane miles our smallest district, but the most urban District 4 6,239 lane miles District 5 5,315 lane miles District 6 3,345 lane miles I10 125 and I 40 are our interstate system. With over 40% of heavy truck traffic occuring on I40 2

Total Lane Miles In New Mexico s State Highway System (In Thousands) 31 30 29 28 27 26 25 30.3 30.4 30.4 30.5 29.5 29.5 29.6 27.9 27.3 27.2 27.3 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 Over the last 10 years, NMDOT has seen a increase of 3,200 in lane miles in NM This is approximately a 12% increase 3

Patrols in NM Patrols LANE MILES D1 12 5,648.71 D2 16 7,650.26 D3 5 2,248.26 D4 16 6,239.00 D5 21 5,315.41 D6 12 3,344.77 TOTAL 82 30,446.42 New Mexico has a total of 82 Patrols with 746 FTEs among the 6 Districts covering those 30,446 lane miles. This is a statewide average of 371 lane miles per patrol and 40.81 lane miles per FTE While lane miles across the state have increased 12% during the last 10 years, in that same time frame our forces have only increased 6%. 4

Maintenance Budget Trend (In Millions) $80.0 $70.0 $60.0 $50.0 $40.0 $30.0 $20.0 $10.0 $- $75.9 $75.9 $64.5 $54.0 $56.0 $55.7 $55.7 $58.6 $58.6 $62.7 $63.5 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 While NMDOT has seen about a 41% increase in budget over the last 10 years, generally that increase has been very slow and gradual. From 1999 to 2007, our budget was mostly flat with only minor increases every couple of years. However, we experienced an 18% increase in 2008 due to a special legislative appropriation. In 08 we received a one time appropriation of $42 million from General Fund to address our maintenance program. 5

NMDOT Transportation Needs NMDOT Overall Needs 20 year projection Based on HERS-ST Model, 2005 Gap in Funding per Year Routine Maintenance Pavement Preservation GRIP I GRIP II Rail Runner Operations Unfunded Capital Improvements Bridge Deficiencies Bridge Replacement Bridge Maintenance $16.7 Billion $21.8 mil/yr $54.2 mil/yr $445 mil $87 mil $18 mil/yr $386 mil/yr for 20 yr $43.3 mil/yr for 5 yr $25.3 mil/yr $12.6 mil/yr Routine Maintenance FY07, Needs=$65.4 mil, Actuals= $43.6 mil, Gap = $21.8 mil Pavement Preservation Unfunded Construction, Congestion Need = 566 mil/yr, Ave Constr Program = 180 mil/yr, Gap = $386 mil/yr Bridges spend $26mil/yr currently, Bridge Deficiencies 239 deficient state owned bridges Cost to replace all structurally deficient bridges 1,730,037 SF @ $125/sf = $216.3 million $216.3 million / 5 yrs = $43.3 million/yr, bridge 5 yr plan Bridge Replacements Should be replacing 25 bridges/yr based on 50 yr design life, (1267 br/50 yr/br) Ave cost to replace 1 bridge = $1,012,500 Ave cost to replace 25 bridges = $25.3 million/yr Double for associated roadwork, $25.3 x 2 = 50.6 mil/yr Less current budget of $26 mil/yr = roughly $25.3 mil/yr Bridge Maintenance Should be doing preventative maint on 25 bridges/yr 25br x $62.50/sf x 8100sf/br = $12.6 mil/yr 6

Needs - Statewide Bridge Program $216.3 Mil Replacement Cost Deficient Bridge Deck Area 2,400,000 Deficient Bridge Deck Area (S.F.) 2,300,000 2,200,000 2,100,000 2,000,000 1,900,000 1,800,000 1,700,000 1,600,000 2.32 million S. F 1.90 million S.F. 1.73 million S.F. 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 2002 2003 2004 2005 2006 2007 QUARTER The 239 deficient bridges equate to a Deficient bridge deck area of 1.73 million SF Bridge replacement costs Average $125 dollars/sf $216.3 million Replacement Cost - needed to replace Structurally Deficient bridges in today s dollars Bridge replacement only does not include roadway work generally associated with bridge construction Embankment for approaches and departures Drainage, Paving, concrete medians, lighting, signalization, guardrail, signing Detours $432.6 million Construction Cost - Can easily double replacement cost for actual construction cost This number will increase each year due to inflation. Replacement costs continue to rise with each year of do nothing alternative. 7

Needs Routine Maintenance $21.8 million gap in funding FY07 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0 $33,852,496 $44,612,272 Routine Maintenance Expenditures Needs vs Actuals $10,759,776 FY03 FY04 FY05 FY06 FY07 Actuals Needs Gap Linear (Needs) Linear (Actuals) Last 5 yrs, Avg Exp = $37.1 mil/yr Avg Needs = $50.1 million/yr $43,572,226 $65,435,206 $21,862,980 Routine Maint costs continue to rise $21.8 million gap in funding for FY07 Gap growing since FY04 Routine Maint becomes more reactive vs proactive This slide is a snapshot of Routine Maintenance Expenditures vs. Needs over the last 5 yrs. Routine Maintenance all typical roadside and roadway maintenance excluding pavement treatments Erosion & Drainage Repair, Sign replacement, Mowing, Shoulder widening, Pot Hole Patching, Litter Pickup Routine Maintenance Expenditures average $37.1 million/yr over the last 5 yrs. Needs averaged $50.1 million/yr. This is an average GAP of $13.1 million/yr The gap in addressing all Routine Maintenance needs has been growing for the last 4 yrs. Last year the gap was over $21 million. The Gap will continue to grow as available funding falls short of meeting the Needs. 8

Chip Seal - Cost per Lane Mile Cost and Highway Lane Miles Chip Sealed $9,000 Benchmark 5-6 Year Cycle 2,500 Miles FY Cost Per Lane Mile $8,000 $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 COST PER MILE $8,025 $8,024 2,407 2,423 2,308 2,266 $6,893 $6,401 Funding Gap to 2,011 $5,498 Benchmark- 1,887 1,851 $5,274 1,113 Lane Miles $4,890 or $8.9 Million $4,636 $4,480 1,433 1,387 $3,801 1,087 3,000 2,000 1,000 Miles Accomplished $1,000 $0 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Fiscal Year 0 Chipseal Cost Per Lane Mile Lane Miles Accomplished 9

Escalation of Average Costs Pavement Preservation Treatments Pavement Preservation Treatments Cost/Lane Mile 5 Years Ago Cost/Lane Mile Today Percent Increase Fog Sealing $1,045 $1,156 11% Crack Sealing $3,600 $14,600 306% Chip Sealing $4,852 $8205 65% Open Graded Friction Course (OGFC) Overlay $10,920 $32,160 195% 2 Hot Mix Overlay $34,027 $80,960 138% Heater Scarification & Overlay (Cutler) $9,504 $64,125 575% Microsurfacing $37,500 $58,560 56% Cold Mill/Inlay $175,000 $359,000 105% Cold In-Situ Recycle Overlay $200,000 $350,000 75% Rehabilitation $500,000 $750,000 50% Reconstruction $1,125,000 $1,835,000 63% 10

Crude Facts Variation of oil grades from extra heavy to sour 42 Gallons per barrel sold in 10,000 units Crude Oil is separated into fractions by fractional Distillation process 29% produced in Middle East 19% of supply provided to North America Largest oil refinery in Venezuela Produces 957,000 barrels per day Crude oil prices have dropped 57% since July from $140/bl to $60.53/ bl. 11

What s happening in NM? Increase in asphalt index price $500/ton in June Estimated $30 million impact to active construction program New price index developed and published for use in July program let and into the future to respond to unprecedented instability in asphalt market Possible project completion delay due to supply issue related to price increases Operations, Design and Finance working on impacts to construction, design and funding impacts to statewide program Adjustments to maintenance program (price agreement) in progress. Current Asphalt Price Index is $735/ ton Estabilished a NM Index rack prices provided from 4 NM suppliers 12

Conclusions Transportation Needs far outweigh available funding Federal revenue streams are decreasing with more emphasis being placed on States to pick up slack Current level of funding will not sustain New Mexico s transportation needs into the future Options in Transportation Funding are needed 13