Annex to the Accreditation Certificate D-IS according to DIN EN ISO/IEC 17020:2012

Similar documents
Procedure: Pressure equipment safety

Environmental Gasket Company Ltd. 309 Hanzhongmen Ave. Nanjing, PR China. 13EGC-MPA /Hh/Mor/Scr Fishbone Gasket

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Technical Rule Code of Practice

SAFETY PHILOSOPHY FOR SERVICE LINES AND GAS INSTALLATION

Gas plug-in hose, straight-through form. Instructions for Use. suitable for gas socket model G2019T, G2016T. G2023 from 01/1990.

Subpart E. Pressure Testing

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Instruction Manual. Pressure Vessels

Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method

Notable Clarifications to Directive 077 Requirements

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

Instruction Manual Contact Pressure Vacuum Gauge

49 CFR 195 Regulatory Overview

Water Tank Inspection Standards & Guidelines

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

Declaration of performance

Supplementary Installation and Operating Instructions. Variable Area Flow Meters SGK-1 Ex SGK-2 Ex SGK-3 Ex. Category: II 2G Ex IIC II 3G Ex IIC

Installation, operation & maintenance manual - original version

Operating and Maintenance Instructions. VAG BETA 200 Gate Valve

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

BSI BSI 5200 THE NEW CAST 60 FITTINGS AN EASY ASSEMBLY A KNOWN PRODUCT, SAFE AND RELIABLE AVAILABLE IN CARBON AND STAINLESS STEEL

E PB 127/2013 TEST CERTIFICATE. Reusability of sealing cushions (valve) coated with swelling material

Centrifugal Gas Separator ZGA. Operating Manual. Dimensions, weights and other technical data are subject to changes.

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

SIGRAFLEX MF Approvals/Test reports

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

Profipress G. Instructions for Use. Year built: from 01/1998 en_int

Pressure Switches Application Guideline

Products. reinforcement. systems. Reinforcement. systems

Magnetic level switch type MR783 Instruction Manual

Kiefner & Associates, Inc.

BLADDER TANK PROPORTIONING SYSTEM PRE-PIPED

Flexible hoses - Non-metallic materials

ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah

Bad Lauchstädt Storage. Special Storage Facility Conditions

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Event Time Event Name Meeting Room Sunday, January Monday, January

DVS Technical - Codes and Bulletins. Table of Contents

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

DVS Technical Codes an Bulletins

Installation and Operating Instructions Bypass Flow Meter DST

SECTION PRESSURE TESTING OF PIPING

Standard Pneumatic Test Procedure Requirements for Piping Systems

INTERNATIONAL STANDARD

Abdelhamid Bedjou, Magister of Hydraulic Dr.-Ing. Sissis Kamarianakis

Examples of pressure systems and equipment are:

BMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles

1 Exam Prep. Tabs and Highlights

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

O NEof Premium tools for professionals!

FIREFIGHTING EQUIPMENT

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

Manual Power relay SR853

Pressure switch with bourdon tube

High Pressure Iron (HPI) Recertification Guidelines & Procedures

Supervisory Inspection Rule for Safety Performance of. Boiler and Pressure Vessel Products

EN ISO/IEC Technical Requirements

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

This document is a preview generated by EVS

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

User Manual for the Application of Hose Assemblies for High-Pressure Water Jet Machines

Code Compliance Research Report CCRR-0145

Enbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT

MANUFACTURING PROCEDURE SPECIFICATION INSPECTION TEST PLAN

MAINTENANCE & ASSEMBLY INSTRUCTIONS FUSIBLE LINK. Inline Thermal Check Valve

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

CAST IRON SAFETY VALVE TYPE 6301

Steam Trap BK BK 212-ASME. Original Installation Instructions English

Hazardous Materials Handling High Pressure Cylinders Goals and Objectives

SPR - Pneumatic Spool Valve

EADIPS /FGR STANDARD

IH Report: SUFMO 08/09-CC21 1/27/2009 Stanford University Gas Cabinet Installation and Performance Criteria

Siphon vessel / Priming aid

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Albany Connecticut Vermont Westchester

ASSEMBLY INSTRUCTIONS S O L O N STANDARD MODULES

Declaration of Performance (DOP)

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

We re good at what we do! Anywhere, TX SITE

Evaluationguideline for the Kiwa product certification for water reducing valves and combination water pressure reducing valves

F-08 HIGH-PRESSURE HOSE USED IN CO2 SYSTEM

EU minimum requirements. Training and certification for personnel and companies

Contents. 1. Non Destructive Testing Requirements. 2. Non Destructive Testing Methods Magnetic Particle Examination

Instruction Manual Contact Pressure Gauge

NAVIGATION AND SEAMANSHIP Control stress, draught and stability of the ship

DK46 - DK800 Supplementary instructions

Florida Senate SB 1694 By Senator Haridopolos

Liquid level glasses, type LLG REFRIGERATION AND AIR CONDITIONING. Technical leaflet

Transcription:

Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-IS-11027-03-00 according to DIN EN ISO/IEC 17020:2012 Period of validity: 14.02.2017 to 13.02.2022 Date of issue: 08.06.2017 Holder of certificate: Materialprüfungsanstalt Universität Stuttgart Pfaffenwaldring 32, 70569 Stuttgart for its inspection body Type A Inspections in the fields: Conformity assessment for technical safety of high pressure gas pipelines according to of the regulation over high pressure gas pipelines (Ordinance for high pressure gas lines - GasHDrLtgV); Inspection of manufacturing plants for anchors in concrete and masonry elements as well as their factory production control (FPC) concerning compliance with the requirements stated in the Acceptance Criteria of ICC evaluation service Abbreviations used: see last page 1 / 5

1 Inspection of high pressure gas pipelines VA 58400-07 2016-12 IA 56210-01 IA 56210-02 IA 56210-03 IA 56210-04 IA 56210-05 IA 56210-06 IA 56210-07 IA 56210-08 IA 56210-09 IA 56210-10 IA 56210-11 IA 56210-12 2016-06 Procedures of the Inspection Body type A for the inspection activities covered by the scope of the regulation over high pressure gas pipelines and the Acceptance Criterias of ICC-ES Expert opinion for the notice according to 5 GasHDrLtgV Development and review of the inspection activity - Meeting before start of building Material controlling Welding monitoring Visual inspection of the welds Non-destructive testing of the welds Removing and investigation of test welding seams Cold bending of tubes Pipe installation / laying of the prefabricated tube strings Test of the corrosion protection Checking of the pipe listing Inspection of the pressure tests according to DVGW-worksheet G 469 (A2, A3, B2) Period of validity: 14.02.2017 to 13.02.2022 Date of issue: 08.06.2017 2 / 5

IA 56210-13 2016-06 IA 56210-14 IA 56210-15 2016-02 IA 56210-16 IA 56210-17 IA 56210-18 IA 56210-19 2016-02 IA 56210-20 2015-07 GasHDrLtgV 2011-05 DIN EN 1594 2013-12 VdTÜV-Merkblatt 1001 2015-07 DVGW-worksheet GW 350 2015-06 DVGW-worksheet G 469 2010-06 VdTÜV-Merkblatt 1060 2010-06 DVGW-worksheet GW 301 2011-10 Inspection of the pressure test according to VdTÜV-technical leaflet 1060 - method D (stress test) Testing an monitoring during the pipeline connecting and commissioning Testing an monitoring during the pipeline connecting performed by the stoppling-method Controlling of the documentation Provisional certificate Final certificate Activity within the subsequent increase of operating pressure Evaluation of damages at high pressure gas pipelines Regulation over high pressure gas pipelines (Ordinance for high pressure gas lines - GasHDrLtgV) Gas supply systems - Pipelines for maximum operating pressure over 16 bar - Functional requirements Guideline about the inspection of high pressure gas pipelines performed by the expert of the TÜV Welding joints of steel pipelines for gas and water supply; manufacturing, testing and evaluation Gas transport/gas distribution - methods of pressure tests Guidelines for carrying out the stress test; piping Qualification criteria for pipeline construction companies Period of validity: 14.02.2017 to 13.02.2022 Date of issue: 08.06.2017 3 / 5

DVGW-worksheet GW 15 DVGW-worksheet GW 12 2010-10 DVGW-worksheet GW 14 1989-11 DVGW-worksheet G 434 2003-02 DVGW-worksheet G 463 2016-07 DVGW-worksheet G 458 2016-03 DVGW-worksheet G 473 1995-07 Subsequent coating of tubes, valves and fittings - plan for training and testing Design and construction of the cathodic corrosion protection for buried storage tanks and steel pipelines Repair of imperfections in the corrosion protection coating Pipes for the optimization of the gas supply and gas presentation - construction, testing and operation High pressure gas steel pipelines for a design pressure of more than 16 bar - construction Subsequent increase of operating pressure of gas pipelines made of steel Methods for detection, valuation, treatment and avoidance of bumps on high pressure pipelines 2 Inspection of manufacturing plants for anchors in concrete and masonry elements as well as their factory production control (FPC) according to AC304 VA 58400-07 2016-12 IA 52130-01 2016-11 Procedures of the Inspection Body type A for the inspection activities covered by the scope of the regulation over high pressure gas pipelines and the Acceptance Criterias of ICC-ES Inspection of production plants for anchors in concrete and masonry elements according to AC304 and AC10 in the following range: Fields of inspection Anchors in Concrete and Masonry Elements: Under AC01, AC58, AC60, AC70, AC106, AC193, AC232, AC308 Manufacturing in the fields specified above Type and range of inspections In-plant Qualification and Follow-up In-plant Inspection methods and procedures In accordance with inspection procedures VA 58400-07 and IA 52130-01 ICC-ES Acceptance Criteria AC304 Period of validity: 14.02.2017 to 13.02.2022 Date of issue: 08.06.2017 4 / 5

Abbreviations used: AC Acceptance Criterias DVGW German Association of the Gas and Water Industry (Deutsche Vereinigung des Gas- und Wasserfaches e.v.) ICC-ES International Code Council - Evaluation Service IA Inspection procedure VA Inspection system procedure Period of validity: 14.02.2017 to 13.02.2022 Date of issue: 08.06.2017 5 / 5