Local Highway Panels Members Guide. 9 Public Rights of Way

Similar documents
Local Highway Panels Members Guide 11 Quiet Lanes

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Local Highway Panels Members Guide. 4 Signs & Road Markings

The Legal Record of Rights of Way

Rights of Way Enforcement Procedure for Land Managers

Public Rights of Way A guide for landowners and farmers

Guidance Notes for Parish Footpath Wardens

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

Seal Extension Guidelines. Asset Management and Systems

Community Highways Volunteering. Information Pack 2017/18

keeping Essex informed Your guide to byways byways and motor vehicles

Process for managing parking on verges, footways and footpaths

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

Peterborough. Rights of Way Improvement Plan ( ) Peterborough. Highway Services. Creating the UK s Environment Capital.

Roads and public rights of way

A guide to how local communities can change local speed limits

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

Our Approach to Managing Level Crossing Safety Our Policy

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

Warfield Neighbourhood Plan: 4.4 Infrastructure

DEFRA RIGHTS OF WAY IMPROVEMENT PLANS OF THE FUTURE

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

connectivity through walking and cycling

Report to Cabinet. 18 May 2016

Appendix 12 Parking on footways and verges

Active Transportation Infrastructure Investment A Business Case

Version 7 October Utilisation Strategy for Speed Camera Enforcement

Welsh Government Consultation Document Taking Forward Wales Sustainable Management of Natural Resources.

Rights of Way Improvement Plan Funding Programme (RFP) 2015/16

December 2014 Newsletter

Horses on the National Cycle Network

CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form

MOTORBIKES, QUAD BIKES & MINI-MOTOS. Your guide to riding safely and reporting nuisance behaviour

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

PUBLIC RIGHTS OF WAY ISSUES

Parking Partnership Enforcement. Showing the Partnership Enforcement Policy and links to Regional and National Policy,

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

ADVICE ON Finding places to ride and carriage drive

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 13 VISITOR MANAGEMENT AND THE THREE PEAKS ROUTE

Rights of Way Improvement Plan Funding Programme (RFP) 2016/17

Policy. The Calico Group. Calico Homes. Calico Enterprise. SafeNet. Acorn Recovery Projects. Whitworth Care Trust

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Ramblers Cymru response to Welsh Government Green Paper on Improving opportunities to access the outdoors for responsible recreation

Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Regional Cycle Programme Update

Phone: Ref No: 06/2018/0884

What are National Parks?

Chelmsford City Growth Package

LEVEL CROSSING SIGHTING DISTANCES

EUROPEAN MOBILITY WEEK September 2015

North Somerset Council

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY:

QLDC Council 29 October Report for Agenda Item: 3

Draft Stockport Rights of Way Improvement Plan : Improving and Maintaining Off-road Routes.

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by:

Auckland Council Finance & Performance Committee Presentation

Speed Limit Policy Isle of Wight Council

Section 2 Strategic Alignment. Contents

Draft update to Cambridgeshire Rights of Way Improvement Plan

IMPLEMENTATION STRATEGIES

limburg.be Quality monitoring of the tourist cycle network in Limburg

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

Part 3: Active travel and public transport planning in new housing developments

LIFT MAINTENANCE POLICY

LTP and ROWIP Integration

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

WEST YORKSHIRE LTP CYCLE PROSPECTUS

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

campaigning by the Railway Development Society Limited

What is Community Speed Watch?

Delivering the. Strategy 7.0

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

RIGHTS OF WAY IMPROVEMENT PLAN FUNDING PROGRAMME (RFP)

CAMBRIDGESHIRE LOCAL ACCESS FORUM

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

The Rower Traffic Management Scheme

Regional Bus Priority

Equestrian Access and The British Horse Society

Civil Parking Enforcement of Bus Lane Contraventions. Yes. Yes

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

Active Travel Strategy Dumfries and Galloway

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

10 SHERFORD Town Code

Appendix 1 Greenway Standards

ENFIELD TOWN THE REVISED DESIGN

CHAPTER 7.0 IMPLEMENTATION

Nottingham Cycle City Frequently Asked Questions

Health and Safety Inspection Procedure

PROCEDURE Cycle Patrol. Number: A 0604 Date Published: 15 December 2015

inc SIMON JACKSON Nature conservation Fact sheet 14

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Transcription:

Local Highway Panels Members Guide 9

2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country. Although public rights of way are the lowest category of highway, exactly the same legal principles apply as with all roads and footways: Once a highway, always a highway; the status, width and position can only be altered by legal order. The Definitive Map of, together with a document called the Definitive Statement, lists the precise location of all PROWs within Essex. The County Council is responsible for the maintenance and update of the Definitive Map and Definitive Statement. This is divided into Districts and Parishes, with each path being identified by a number which is unique to that Parish. Although the right of way itself is protected and accessible to all, in most cases the surrounding land and the sub-soil of the public right of way will usually be privately owned, and often working farmland. The landowner may have private access rights, such as the right to use a tractor or car on a route. Types of Right of Way There are four types of right of way which have different access rights. Different coloured symbols are used to differentiate between the different types of highway. Footpaths Footpaths represent 84% of the total public rights of way network A footpath is a highway over which the public has a right of way on foot only. A footpath should be at least 1 metre wide across a field where crops are growing, and 1.5 metres wide where it passes around the edge of a field. Footpaths are marked by a yellow arrow with a white surround. Bridleways Bridleways represent 12.3% of the total public rights of way network. A bridleway is a highway over which the public has a right of way on foot, horseback and on all types of bicycle. There may also be a right to drive animals along a bridleway, and this will be made clear within the Definitive Statement. Bridleways are marked by a blue arrow with a white surround.

Local Highway Panels (LHP) Members Guide 2016/17 3 Byways Byways represent 3.8% of the total public rights of way network. A byway Open to All Traffic (BOAT) is a highway over which the public is entitled to travel on foot, horseback or pedal cycle and by motorised vehicle of all kinds, including horse-drawn vehicles. Although legally open to all vehicles, a BOAT is used mainly by the public for walking or riding. Most byways do not have a sealed surface and may not be suitable for certain vehicles. Vehicles that use a byway must be taxed, insured and have passed their MOT check just as they would be on the road. Byways are marked by a red arrow with a white surround. Restricted Byway Restricted Byways represent 0.01% of the total public rights of way network. A restricted byway allows right of way on foot, on horseback; leading a horse, riding a bicycle or using any other vehicle that is not mechanically propelled. Restricted byways are marked by a purple arrow with a white surround. Common Land This is not the same as a Public Right of Way. It is governed by different legislation and changes to common land and its usage can be very difficult. Common land is in private ownership and the rights of access differ depending on the rights pertaining to that common, for example, grazing rights. The only general public rights to access is where it is on urban common or crossed by a public right of way. The Countryside and Rights of Way Act 2000 increased access to common land (known as access land) and extended rights in relation to common land. Details of all designated common land or village greens are held by Essex Legal Services. 2. Typical Problems Can we stop vehicles using the Right Of Way? I can t use the ROW as there are bulls in the field We want the surface upgraded The ROW is blocked The footpath is very overgrown We want to make the Right Of Way accessible for pushchairs and wheelchairs

4 Local Highway Panels (LHP) Members Guide 2016/17 3. Things to Consider The request to the LHP will come from residents who want improved access or are concerned about the state of a particular right of way. Any new right of way will add to the overall asset which in turn will increase the pressure on the finance budget. Similarly, upgrading a surface will significantly increase the future maintenance burden. Changes to the Right Of Way network will require agreement with the land owner and must follow the required legal process, which can be lengthy and expensive. A metaled surface requires more expensive maintenance than an unmade surface. If the intention is to upgrade a surface of a Right Of Way consideration needs to be made to the future maintenance burden. Essex County Council s statutory document the Rights of Way Improvement Plan (RoWIP) 2009/2019 sets out the County s priorities for its rights of way network. This is currently being updated. The ROWIP has assisted in identifying important missing links and bringing about improvements to the rights of way network. The updated ROWIP will set out future challenges for rights of way and countryside access to 2030 in the form of updated statements of action. When considering changes to the the Authority must maintain a balance between the differing needs of all legitimate users, especially on byways. Report a Problem Where you receive complaints or concerns about a Right of Way this should be reported via the website Report-a-highway-problem There is a dedicated PROW Enforcement Officer as well as dedicated PROW Maintenance Gangs and countywide volunteers who undertake work on the network however the maintenance work is prioritised to deliver an efficient service and maintain a usable network. Enforcement The County s network of are protected in law, and all members of the public have a right to their use and enjoyment. Legislation places certain duties and responsibilities on farmers and landowners in respect of that cross land within their ownership and control. It is illegal to obstruct a Public Right of Way. Landowners may apply to temporarily or permanently alter a PRoW, or even remove a PRoW, but they are not allowed to simply block or interfere with a route. The PRoW Enforcement Officer works with land owners and tenants to enforce the definitive PRoW network. This may be simply sending a reminder to reinstate footpaths across fields or to maintain a structure owned by the landowner or tenant.

Local Highway Panels (LHP) Members Guide 2016/17 5 Illegally obstructing a route is a criminal offence. Essex County Council takes the issue of illegal obstruction seriously, and the Concordat outlines the council s policy and procedure. Maintenance Vegetation cutting of the natural seasonal growth on our PROW network is undertaken between April and October. It can only be funded by the revenue budget. Maintenance Teams have an established annual cutting programme, which allows for the most cost-effective programming of routine work. Not all paths are part of the schedule. The district maps on the website show the cutting schedule. These paths will be cut during June and July, if conditions permit. Volunteers deliver maintenance works under the Parish Paths Partnership Scheme undertaking locally important improvements on the network. Where cutting is requested on a path not contained in the programme an assessment will be made on site as to whether it should be added to future programmes or cut on an ad hoc basis. Localism Schemes Parish Councils may enter into a service level agreement with ECC to maintain the vegetation on their priority routes. Any new applications should be made in December with a schedule of paths for which the Parish wishes to take responsibility. Community Groups can volunteer through the Parish Paths Partnership scheme to clear seasonal growth and undertake other maintenance tasks on the network. Groups identify paths that need attention and organise a work party to clear the vegetation. The volunteers are supported by our PROW Inspectors. Landowners and Farmers also cut paths on their land or land within their control under the headland management scheme. User Satisfaction The PROW Team makes use of user satisfaction information to plan and prioritise its work. Residents should be encouraged to complete the survey which will help inform the council of the concerns.

6 Local Highway Panels (LHP) Members Guide 2016/17 4. Typical Measures Examples of the types of schemes that the LHP budget can deliver are shown below. The provision of some form of levelling and surfacing, commonly tarmac (blacktop), for urban footpaths and road planings capped with granite dust for byways or bridleways in more rural settings. Kissing gates... Bridges may be required to link up separate rights of way. This may require the creation of a new section of right of way to join the two existing routes.

Local Highway Panels (LHP) Members Guide 2016/17 7 5. Scheme Investigation Before allocating LHP money to a Public Right of Way scheme it should be checked against the PROW capital programme to identify if the scheme is already programmed. When investigating a scheme the following would need to be considered: Landowners and any existing private access rights. Landowner access approval (possibly seasonal around harvests) and vehicle access on both sides of the river/crossing is critical for bridges. Environmental approvals from Environment Agency (EA). Environmental considerations e.g. Sites of Special Scientific Interest (SSSI) or protected species habitats such as badger setts or otter holts. Implications of the Equality Act 2010. Other locally relevant considerations. 6. Costs and Timescales The Essex County Council contract with Ringway Jacobs is a target cost contract and not a fixed price contract. This type of contract was chosen as the best type of contract to deliver savings and efficiencies and also to promote partnering between ECC and Ringway Jacobs. An explanation of the process and indicative costs and timescales can be found in Appendix 1

8 Local Highway Panels (LHP) Members Guide 2016/17 7. Glossary of Terms AVL CMA CMB EA ECC EH LHP NEPP PP RTPI Automatic Vehicle Location (similar to RTPI) Cabinet Member Action Cabinet Member Briefing Environment Agency Essex County Council Essex Highways Local Highways Panel North Essex Parking Partnership Parking Partnership Real Time Passenger Information S106 Section 106 (Money provided by a Developer to County Council to implement infrastructure as an obligation of the planning permission) S278 Section 278 (Infrastructure required to be implemented by the Developer as an obligation of the planning permission) SERP SID SEPP SLO SSSI TRO TSRGD VAS Safer Essex Roads Partnership Speed Indicating Device South Essex Parking Partnership Speed Limit Order Site of Special Scientific Interest Traffic Regulation Order Traffic Signs Regulations and General Directions Vehicle Activated Sign