PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Similar documents
Limited quantities of compressed gases.

MSC Guidelines for Pressure Vessels

[Reserved] Packagings ICC 3 1 3AA 3AL 3AX 3A480X 3AAX

HYDROSTATIC LEAK TEST PROCEDURE

Minimum test pressure (psig) 2. Requalification period (years) DOT psig 5. non-corrosive service ( see

Standard Pneumatic Test Procedure Requirements for Piping Systems

NBIC Committee Action Block

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

Subpart E. Pressure Testing

Wayne Chaney Investigator, Southern Region Field Operations

Process Name Compressed Gas Cylinders Program

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (ELEVENTH REVISION)

Liquefied gas cargo tanks and process pressure vessels

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015

PRESSURIZED EQUIPMENT AND SYSTEMS

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (EIGHTEENTH REVISION)

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

EXPIRATION DATE: June 30, 2011

Permanent expansion means a permanent increase in a cylinder's volume after the test pressure is released.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Subpart F Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A)

EXPIRATION DATE: September 30, 2013

400 Seventh Street, S.W. of Transportation Washington, D.C EXPIRATION DATE: February 28, 2010

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (FOURTH REVISION)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

PIPELINE AND HAZARDOUS MATERIAL SAFETY ADMINISTRATION CYLINDER REQUALIFICATION FACILITY INSPECTION REPORT GENERAL INFORMATION

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (NINTH REVISION)

PIP PNE00012 Piping Examination and Leak Test Guide

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

DOT-SP 8391 (FIFTHTEENTH REVISION) EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

J. Paul Guyer, P.E., R.A.

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Annex G (normative) Requirements for Nondestructive Examination

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

Testing Procedures of Watertight Compartments

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

v. Size shall be specified on drawings.

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TENTH REVISION)

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Draft. Not yet Approved

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Valve Inspection & Testing

MODEL PAF 450 ASSEMBLY

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

MSC Guidelines for Independent Fuel Tanks

I m not just a Big Drum

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6

Handling and Storage of Gases

EKC International FZE. Safety Instructions For Handling & Inspection Manual For Refillable Seamless Steel Gas Cylinders

PRESSURE RELIEF DEVICES. Table of Contents

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

High Pressure Iron (HPI) Recertification Guidelines & Procedures

MSC Guidelines for Compressed Air Systems

Pressure Relief Device Investigation Testing Lessons Learned

Operation Manual Piston Sensed Gas Pressure Regulators

BMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles

49 CFR 195 Transportation of Hazardous Liquids by Pipeline THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS

3.0 Basic Plant Operations Performance-Based Skills Assessment 2016

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

September 2018 Pressure Test

PART 178 SPECIFICATIONS FOR PACKAGINGS. Subpart A [Reserved] Subpart B Specifications for Inside Containers, and Linings

Tank Blanketing Pressure Regulators RHPS Series

COMPRESSED GAS CYLINDERS

Installation, Operation and Maintenance Manual for Back Pressure Regulator

User Information Sheet 024

Regulations Respecting Compressed Gas Pressure Vessels

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

CODE OF FEDERAL REGULATIONS TITLE 49. Parts

UKOPA Dent Management Strategy

Refrigeration plants where ammonia is used solely as a refrigerant.

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

INJECTION ODORIZING SYSTEMS : DOSAODOR TYPE

CURI Pierside Stainless Diesel Tank

Knowing the Job: Any employee actively engaged in dispensing propane should meet minimum responsibilities

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Procedures for Inspection Bodies Testing and Inspection of UK Tanks

FV Flash Vessel Installation and Maintenance Instructions

TABLE OF CONTENTS PART 2 - CONFINED SPACES

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP 7218 (NINETEENTH REVISION)

Circular Sight Windows

Transcription:

PRESSURE RETEST 49 CFR, 180.407(g) Co#: Vin#: Spec: MAWP: Retest Date: Location: *External Inspection Performed: *Internal Inspection Performed: Test Pressure: psig Held for: min. (Must be at least 10 min.) Test Method Used: Hydrostatic YES NO Pneumatic: YES NO Insulated: YES NO ITEMS COMPLIANCE DEFECT Visual Inspection of Re-closing Pressure Relief Valves Removal and Testing of Re-closing Pressure Relief Valves Visual Inspection of Upper Coupler Signs of Leakage Bulging or Other Defects Pressure Bearing Portions of Cargo Tank Heating System Remarks: Upper Coupler Dropped and Inspected: YES NO Cargo tank returned to service: Cargo tank withdrawn from service: Inspector s Name: CT#: Inspector s Address: I CERTIFY THAT THE INSPECTION NOTED ON THIS FORM WAS PERFORMED BY ME AND ALL REQUIRED ENTRIES WERE MADE CONCERNING OBSERVATIONS MADE DURING THIS INSPECTION. Inspector s Signature Date Owner of Authorized Representative s Signature Date Form PRSRETST. Rev. 05/12 NATC, Inc., Hightstown, NJ 08520 USA / (609) 426-0555 / www.49cfr.com 1 of 5

(g) Pressure test. All components of the cargo tank wall, as defined in 178.320(a) of this subchapter, must be pressure tested as prescribed by this paragraph. (1) Test Procedure (i) As part of the pressure test, the inspector must perform an external and internal visual inspection, except that on an 338 cargo tank, or a cargo tank not equipped with a manhole or inspection opening, an internal inspection is not required. All reclosing pressure relief valves must be: (A) Removed from the cargo tank for inspection and testing. Each reclosing pressure relief valve must open at the required set pressure and reseat to a leak-tight condition at 90 percent of the set-todischarge pressure or the pressure prescribed for the applicable cargo tank specification; or, (B) Replaced. (iii) Except for cargo tanks carrying lading corrosive to the tank, areas covered by the upper coupler (fifth wheel) assembly must be inspected for corroded and abraded areas, dents, distortions, defects in welds, and any other condition that might render the tank unsafe for transportation service. The upper coupler (fifth wheel) assembly must be removed from the cargo tank for this inspection. (iv) Each cargo tank must be tested hydrostatically or pneumatically to the internal pressure specified in the following table: Specification Test Pressure 20.7 kpa (3 psig) or design pressure, whichever is greater. 300, 301,302, 303, 305, 306. 275.8 kpa (40 psig) or 1.5 times the design pressure, whichever is greater. 304, 307. 20.7 kpa (3 psig) or 1.5 times the design pressure, whichever is greater. 310, 311, 312. 1.5 times either the MAWP or the re-rated pressure, whichever is applicable. 330, 331. 1.25 times either the MAWP or the re-rated pressure, whichever is applicable. 338 34.5 kpa (5 psig) or 1.5 times the MAWP, whichever is greater. 406. 275.8 kpa (40 psig) or 1.5 times the MAWP, whichever is greater. 407. 1.5 times the MAWP. 412. (v) Each owner of 5 or more 300, 301, 302, 303, 304, 305, 306, 307, 310, 311, or 312 cargo tanks must pressure test at least 20 percent of the cargo tanks in his ownership each year beginning in 1991. The owner of fewer than five specification cargo tanks has until August 31, 1995, to pressure test these units. (vi) Each cargo tank of a multi-tank cargo tank motor vehicle must be tested with the adjacent cargo tanks empty and at atmospheric pressure. Continued Form PRSRETST. Rev. 05/12 NATC, Inc., Hightstown, NJ 08520 USA / (609) 426-0555 / www.49cfr.com 2 of 5

(vii) All closures except pressure relief devices must be in place during the test. All prescribed loading and unloading venting devices rated at less than test pressure may be removed during the test. If retained, the devices must be rendered inoperative by clamps, plugs, or other equally effective restraining devices. Restraining devices may not prevent detection of leaks or damage the venting devices and must be removed immediately after the test is completed. (viii) Hydrostatic test method. Each cargo tank, including its domes, must be filled with water or other liquid having similar viscosity, at a temperature not exceeding 100 F. The cargo tank must then be pressurized to not less than the pressure specified in paragraph (g)(1)(iv) of this section. The cargo tank, including its closures, must hold the prescribed test pressure for at least 10 minutes during which time it shall be inspected for leakage, bulging or any other defect. (ix) Pneumatic test method. Pneumatic testing may involve higher risk than hydrostatic testing. Therefore, suitable safeguards must be provided to protect personnel and facilities should failure occur during the test. The cargo tank must be pressurized with air or an inert gas. The pneumatic test pressure in the cargo tank must be reached by gradually increasing the pressure to one-half of the test pressure. Thereafter, the pressure must be increased in steps of approximately one-tenth of the test pressure until the required test pressure has been reached. The test pressure must be held for at least 5 minutes. The pressure must then be reduced to the MAWP, which must be maintained during the time the entire cargo tank surface is inspected. During the inspection, a suitable method must be used for detecting the existence of leaks. This method must consist either of coating the entire surface of all joints under pressure with a solution of soap and water, or using other equally sensitive methods. (2) When testing an insulated cargo tank, the insulation and jacketing need not be removed unless it is otherwise impossible to reach test pressure and maintain a condition of pressure equilibrium after test pressure is reached, or the vacuum integrity cannot be maintained in the insulation space. If an 338 cargo tank used for the transportation of a flammable gas or oxygen, refrigerated liquid is opened for any reason, the cleanliness must be verified prior to closure using the procedures contained in 178.338 15 of this subchapter. (3) Each 330 and 331 cargo tank constructed of quenched and tempered steel (Part UHT of the ASME Code), or constructed of other than quenched and tempered steel but without postweld heat treatment, used for the transportation of anhydrous ammonia, or any other hazardous materials that may cause corrosion stress cracking, must be internally inspected by the wet fluorescent magnetic particle method immediately prior to and in conjunction with the performance of the pressure test prescribed in this section. Each 330 and 331 cargo tank constructed of quenched and tempered steel (Part UHT of the ASME Code) used for the transportation of liquefied petroleum gas must be internally inspected by the wet fluorescent magnetic particle method immediately prior to and in conjunction with the performance of the pressure test prescribed in this section. The wet fluorescent magnetic particle inspection must be in accordance with Section V of the ASME Code and CGA Technical Bulletin TB 2. This paragraph does not apply to cargo tanks that do not have manholes. (See 180.417(c) for reporting requirements.) (4) All pressure bearing portions of a cargo tank heating system employing a medium such as, but not limited to, steam or hot water for heating the lading must be hydrostatically pressure tested at least once every 5 years. The test pressure must be at least 1.5 times the heating system design pressure and must be maintained for five minutes. A heating system employing flues for heating the lading must be tested to ensure against lading leakage into the flues or into the atmosphere. Continued Form PRSRETST. Rev. 05/12 NATC, Inc., Hightstown, NJ 08520 USA / (609) 426-0555 / www.49cfr.com 3 of 5

(5) Exceptions. (i) Pressure testing is not required for 330 and 331 cargo tanks in dedicated sodium metal service. (ii) Pressure testing is not required for uninsulated lined cargo tanks, with a design pressure or MAWP of 15 psig or less, which receive an external visual inspection and a lining inspection at least once each year. (6) Acceptance criteria. A cargo tank that leaks, fails to retain test pressure or pneumatic inspection pressure, shows distortion, excessive permanent expansion, or other evidence of weakness that might render the cargo tank unsafe for transportation service, may not be returned to service, except as follows: A cargo tank with a heating system which does not hold pressure may remain in service as an unheated cargo tank if: (i) The heating system remains in place and is structurally sound and no lading may leak into the heating system, and (ii) The specification plate heating system information is changed to indicate that the cargo tank has no working heating system. (7) The inspector must record the results of the pressure test as specified in 180.417(b) Form PRSRETST. Rev. 05/12 NATC, Inc., Hightstown, NJ 08520 USA / (609) 426-0555 / www.49cfr.com 4 of 5

ACCEPTABLE RESULTS of TEST and INSPECTIONS 49 CFR, 180.411 (a) Corroded or abraded areas. The minimum thickness may not be less than that prescribed in the applicable specifications. (b) Dents, cuts, digs, and gouges. (See CGA Pamphlet C-6 for evaluation procedures.) (1) For dents at welds or that include a weld, the maximum allowable depth is ½ inch. For dents away from the welds, the maximum allowable depth is 1/10 of the greatest dimension of the dent, but in no case may the depth exceed one inch. (2) The minimum thickness remaining beneath a cut, dig, or gouge may not be less than that prescribed in the applicable specification. (c) Weld or structural defects. Any cargo tank with a weld defect such as a crack, pinhole, or incomplete fusion, or a structural defect much be taken out of hazardous materials service until repaired. (d) Leakage All sources of leakage must be properly repaired prior to returning a tank to hazardous materials service. (e) Relief valves. Any pressure relief valve that fails to open and re-close at the prescribed pressure must be repaired or replaced. (f) Liner integrity. Any defect shown by the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance criteria found in the individual specification that applies must be properly repaired. Form PRSRETST. Rev. 05/12 NATC, Inc., Hightstown, NJ 08520 USA / (609) 426-0555 / www.49cfr.com 5 of 5