Medium Voltage Switchgear. Installation Manual for Pressure Relief Ducts

Similar documents
E-trike Li Assembly Guide

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6

SG36KTL-M Quick Installation Guide. 1 Unpacking and Inspection

SG33KTL-M Quick Installation Guide. 1 Unpacking and Inspection

SM6. instructions for use. connection with compartment for incoming cable from the top. MV distribution factory built assemblies at your service

FIX ROAD & FIX STRAP cargo securing systems Operating Instruction Manual

DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D

Agilent 1220 Infinity II LC Mobile Upgrade Kit

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

DISASSEMBLING & REASSEMBLING CARTRIDGE INSTALLING SEATPOST ON BIKE

EcoCell Vertical Electrophoresis Unit

PRO-III & IV (916) (800) Parts: 80000, 80020, & G Trade Center Drive Rancho Cordova, CA 95742

Operating Instructions

OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 10D

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Type POLIM -D..PI-2 Type POLIM -D..PI-3

INSTRUCTION MANUAL. January 23, 2003, Revision 0

BICYCLE TO MOTORCYCLE BICYCLE RACK

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

2.4M Viking Swing Basket Swing

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

BELT DRIVE INDOOR CYCLING BIKE SF-B1712

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

PCB accessories. PCB handle C. PCB retainer C. Order Information. Note. Order Information

Straightaway 130. Sliding & Folding Door Systems. Product Overview. Features. Technical Specifications. Coburn Product Data Sheet

IMPORTANT: RECEIVING INSTRUCTIONS:

Detroit Speed, Inc. Rear Coilover Conversion Kit Camaro/Firebird P/N: &

Arbor Terminator Press Operation Manual For IDT Connectors Order No Engineering No: AM

Poppetted Coaxial Drop Tube Assembly for use with Auto Limiter II. Installation Instructions

Evolution. Radiant Panels. Radiant panel system LPHW up to 90 C Suspended ceiling grid or sofit mounting Vertical wall surface mounting

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

PRODUCT CARD WALL MOUNTED FIXED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,00 TO 2,25 M

SASK-A-POLE OWNERS AND USERS MANUAL

Installation/Care/Use Manual

Final Assembly Instructions Bikes with Quill Stems

INSTALLATION & OPERATION MANUAL. Dual Duct VAV Terminals. Redefine your comfort zone.

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

TWO BIKE UPRIGHT ROOF MOUNT BIKE CARRIER

PRODUCT CARD WALL MOUNTED SIDE FOLDED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,2 TO 2,45 M

VK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010

INDOOR CYCLING BIKE SF-B1110 USER MANUAL

Installation and Service Manual

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

S Surge Arresters

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

E Manual Self tacking system 30

CENTER-STRUT HEIGHT ADJUSTMENT UNITS MANUAL OPERATION

OLYMPIC ARMS, INC. MPR SUPPLEMENTAL OWNER S MANUAL

SETUP INSTRUCTIONS SX-F EU 250 SX-F USA

Rudder Kit Assembly Instructions for Quest 13

A. TO PREPARE THE MACHINE FOR USE.

OPERATOR S MANUAL AND PARTS LISTING FOR THE. CTM Series Mounted Harrow

ModelsEZU-15 & EZU-15-R. BISHAMON INDUSTRIES CORPORATION 5651 East Francis Street Ontario, California 91761, USA (909) (800)

SAVE THESE INSTRUCTIONS. NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further instructions.

JET SWIM ELEGANCE 70 INSTALLATION AND USER GUIDE

Bike holder with three-point-support for mounting stand

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

2 pcs. 1pc. 4 pcs. 4 pcs. 4 pcs. 4 pcs.

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

Page 1. Single Scull Car Rack Assembly and User s Manual " "

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INTRODUCTION BILL OF MATERIALS SPECIFICATIONS & TOOLS PROCEDURES OPERATION OF SEATPOST GIANT LIMITED WARRANTY

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

2 pcs. 1pc. 3 pcs. 3 pcs. 1pc. 3 pcs.

InstallatIon and owner s InstrUCtIons

Installing a Christie One Mount/Christie One Mount Plus

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

K13.12 FACE FIXED PANIC EXIT DEVICE K13 DOORS

1201/1202 Series KSI VIBRAPLANE VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS MANUAL

Model: 7200 Collegiate Volleyball System

SETTING THE HANDLE HEIGHT ON THE ROLLATOR

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

INSTALLATION INSTRUCTIONS

Read Instructions carefully before use. Rollator is designed for indoor & outdoor use. Do NOT use as a wheelchair or as a transport chair.

User Manual Important, read before use!

American Flagpole & Flag Co. 1(800)

FALLTECH FALL PROTECTION ANCHOR BRACKETS MODEL 7432, Dual Truss/ Ridge Line Roof Anchor Bracket

SIMPLAIR PIPING TOOL. JXT Company

INSTRUCTION MANUAL Pressure Relief Device LPT

DelVal Flow Controls Private limited

ES-701 INSTRUCTIONS FOR USE

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

S-60-TO : 1 ton tower system INSTRUCTION MANUAL

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Declaration of Conformity as per Directive 97/23/EC

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

FOOSBALL ASSEMBLY, INSTRUCTIONS AND RULES PL

Smart tips! These are the important things with stairs and bridging steps!

M5400 Operators Manual

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)

Transcription:

Uniswitch Medium Voltage Switchgear Installation Manual for Pressure Relief Ducts

TABLE OF CONTENTS 1 Summary... 1 2 Transportation and storage... 2 2.1 Condition on delivery... 2 2.2 Unpacking at installation site... 2 2.3 Observing the pressure relief ducts at installation site... 3 2.3.1 General... 3 2.3.2 Instructions... 3 2.4 Temporary storage... 4 2.4.1 General warnings... 4 2.5 Delivery responsibilities... 4 3 Installing the pressure relief ducts into cubicles... 5 3.1 General warnings... 5 3.2 Preparations... 5 3.3 Dimensions... 5 3.3.1 Dimensions of pressure relief ducts... 5 3.3.1.1 Examples of duct dimensioning for switchgears equipped with fixed furnishing... 5 3.3.1.2 Examples of duct dimensioning for switchgears equipped with withdrawable circuit-breaker cubicles... 6 3.4 Installing the pressure relief ducts into cubicles... 8 3.4.1 Cubicles equipped with fixed furnishing... 8 3.4.2 Installing the pressure relief duct into circuit-breaker cubicles... 9 3.4.3 Installing the spacer... 12 3.5 Connecting the pressure relief ducts... 12 3.5.1 Connecting the ducts from their rear and bottom edges... 12 3.5.2 Fastening the top and front joints of the ducts... 13 4 Installing the pressure relief flaps... 14 4.1 Installing the pressure relief duct and pressure relief flap... 14 4.1.1 Pressure relief outwards from the switchgear... 14 4.1.2 The pressure relief flap mounted to the outer wall of the building... 15

Y o u r s a f e t y f i r s t a t a l l t i m e s! WARNING! This manual only applies to the installation of pressure relief ducts of Uniswitch switchgear. In addition to this manual, the installation manual of the switchgear must also be available. Always follow the instructions provided in the manual and respect the rules of good engineering practice! Hazardous voltages may cause serious injury or death! Contact us! If you have any further questions about this manual, the members of our field organization will be pleased to provide you with the required information.

1 Summary Uniswitch product family Uniswitch switchgears are metal-enclosed switchgears equipped with either a fixed furnishing or a withdrawable circuit-breaker. The switchgear is available in two different heights, 1635 mm and 1885 mm. Switchgears equipped with a withdrawable circuit-breaker are always of the higher model. Technical documentation Uniswitch technical documentation consists of two publications: Instruction Manual and Installation Manual. Critical messages User-critical messages are marked as follows: for Danger for Warning for Caution for Note

2 Transportation and storage 2.1 Condition on delivery Delivery package The switchgear pressure relief ducts are delivered as a separate transportation unit packed in plastic film. 2.2 Unpacking at installation site Storage and inspection The Uniswitch switchgear with its pressure relief ducts should only be installed indoors. Therefore it is important to store the pressure relief ducts in their transportation packages as long as possible. The packaging should only be opened to inspect for possible damage that may have occurred during transportation. After inspection, the packaging should be restored to its original condition. Any transportation damage should be reported immediately to the carrier/forwarder. If the installation of the switchgear is to be made immediately after the delivery, the transportation packaging can be removed. Figure 2.1 Pressure relief ducts packed in plastic film. Installation accessories for pressure relief ducts. General Cubicle-specific pressure relief ducts (Figure 2.3) and pressure relief flaps (Figure 2.4) have been pre-assembled. ABB 2

Assembled pressure relief duct for a 500 mm wide cubicle. Pressure relief duct and pressure relief flap that is to be mounted on the outer wall. Instructions Remove the plastic film from the pressure relief ducts. 2.3 Observing the pressure relief ducts at installation site 2.3.1 General! Install the pressure relief ducts into the cubicles before moving the cubicles into their final locations. When installing the ducts, there must be sufficient clearance for installation (approximately 1 m) behind the cubicle.! Check the locations of the switchgear's pressure relief ducts. If the cubicle is to be equipped with a pressure relief at the rear side, select a duct with 260x315 mm (h x w) opening for these cubicles. 2.3.2 Instructions Duct installation Transfer instructions Mount the collars for pressure relief openings into the ducts that have been equipped with backwards-directed pressure relief openings. Install the pressure relief ducts into the cubicles while being as near to the final operating site as possible, because the ducts will increase the height of the cubicles and thus make it more difficult to, for example, lift them. The cubicles equipped with pressure relief ducts may be transferred by a manual forklift or a forklift truck, and moved into the final location by means of rolling tubes (using at least four tubes). ABB 3

! When transferring the cubicles, pay special attention to those equipped with a pressure relief opening Lifting instructions The units and parts of the pressure relief ducts can be lifted manually without any special lifting accessories. 2.4 Temporary storage 2.4.1 General warnings! The pressure relief ducts should be stored in the same room with the switchgears. 2.5 Delivery responsibilities Responsibilities The responsibilities of the consignee when the pressure relief ducts arrive at site include, but are not limited to, the following: Check the consignment for completeness and lack of any damage (including moisture and its detrimental effects). In case of doubt, the packaging must be opened and then properly resealed. Always take photographs to document any major damage! If any quantities are short, or defects or transport damage are detected, these must be: documented on the respective shipping document immediately notified to the relevant carrier or forwarding agent in accordance with the applicable liability regulations. ABB 4

3 Installing the pressure relief ducts into cubicles 3.1 General warnings! When the final construction documents are compiled, the binding data supplied by ABB must always be taken into account! 3.2 Preparations Prior to installation Prior to commencing the installation on site, the switchgear room must be completely finished. The room must be provided with lighting and electricity supply, be lockable, dry, and furnished with proper heating. 3.3 Dimensions 3.3.1 Dimensions of pressure relief ducts Detailed drawings of the pressure relief openings to be implemented in the building, as well as dimension drawings of the ducts, will be provided separately. 3.3.1.1 Examples of duct dimensioning for switchgears equipped with fixed furnishing Figure 3.1 An example of room layout for switchgear that only contains cubicles equipped with fixed furnishing. Pressure relief backwards from the switchgear. Dimension 1 = 2300 mm high model and 2050 mm low model Dimension 2 = 2080 mm high model and 1830 mm low model Dimension 4 = 270 x 326 mm (h x w), dimension of the pressure relief duct ABB 5

Figure 3.2 An example of room layout for switchgear that only contains cubicles equipped with fixed furnishing. Pressure relief from the end of the switchgear. Dimension 1 = 2300 mm high model and 2050 mm low model Dimension 2 = 2095 mm high model and 1845 mm low model Dimension 4 = 356 x 228 mm (h x w), dimension of the pressure relief duct 3.3.1.2 Examples of duct dimensioning for switchgears equipped with withdrawable circuitbreaker cubicles Figure 3.3 An example of room layout for switchgear that includes withdrawable circuitbreaker cubicle(s). Pressure relief behind the switchgear. Dimension (4) = 270 x 326 mm (h x w), dimension of the pressure relief duct ABB 6

Figure 3.4 An example of room layout for switchgear that includes withdrawable circuitbreaker cubicle(s). Pressure relief from the end of the switchgear. Dimension (3) = 356 x 283 mm, dimension of the pressure relief duct ABB 7

3.4 Installing the pressure relief ducts into cubicles 3.4.1 Cubicles equipped with fixed furnishing General Duct installation If pressure relief ducts (90.2) are to be added into the switchgear, a cube-specific pressure relief duct has already been installed on the back of the cubicles (90.1). The pressure relief ducts of the switchgear will be installed on top of this duct. Lift the duct (90.2) on top of the back end of the vertical duct (90.1) and push the duct forward so that the top edge of the vertical duct fits into the groove in the bottom edge of the duct (Figure 3.6). Figure 3.5 Pressure relief duct lifted on top of the back end of the vertical duct. Figure 3.6 Pressure relief duct groove. Figure 3.7 Pressure relief duct installed. ABB 8

Mount the pressure relief duct to the vertical duct of the cubicle using screws. Figure 3.8 Mounting the duct using screws. 3.4.2 Installing the pressure relief duct into circuit-breaker cubicles Instructions Circuit-breaker cubicles do not have a vertical duct at the back of the cubicle. Instead, the pressure relief duct is installed on top of a frame that is attached to the roof. The lifting lugs on the back of the cubicle must be bent forward before installing the pressure relief duct. Use, for example, a lead sledgehammer or large hammer to bend the lugs. Figure 3.9 Lifting lug of the cubicle bent forward. ABB 9

Installing the foundation of the pressure relief duct Install the crossbar of the pressure relief duct's foundation (90.4) into the front edge of the pressure relief opening (10.3). To mount the bar, use the same screw as with the flap of the pressure relief opening. Lift the foundation frame of the pressure relief duct (90.3) into place (Figure 3.12). Figure 3.10 Crossbar of the pressure relief duct foundation Figure 3.11 Mounting the crossbar. Figure 3.12 Foundation frame lifted into place. Mount the frame (90.3) to the roof frame of the cubicle with screws, and, from the back, to the back wall of the cubicle. Self-threading screws should be used for the back wall mounting. Drill 5mm holes into the back wall of the cubicle. ABB 10

Figure 3.13 Mounting the frame to the cubicle. The duct is installed on top of the frame in the same way as with other cubicle types, see section 3.4.1. Figure 3.14 The pressure relief duct of a withdrawable circuit-breaker cubicle, furnished with a pressure relief collar ABB 11

3.4.3 Installing the spacer Instruction If the switchgear includes both fixed furnishing cubicles and withdrawable circuit-breaker cubicles, the respective depths of the pressure relief ducts may vary. Due to depth difference, the clearance must be covered by a spacer. Fasten the spacers as applicable. Figure 3.15 Spacer. 3.5 Connecting the pressure relief ducts! Install the cubicles on their operating site in accordance with the installation instructions. The pressure relief ducts will be connected to each other in the last phase. 3.5.1 Connecting the ducts from their rear and bottom edges The pressure relief ducts will be connected to each other from their rear and bottom edge using a profile bar. Fit the connection bars at the rear joint (90.8) into place. Use a hammer if needed. Correspondingly, fit the connection bars at the bottom joint (90.9) into place. The end plates of the duct are mounted to the front and the back in the same way as the ducts are mounted to each other. ABB 12

. Figure 3.17 Connecting the pressure relief ducts from their bottom edge with a profile bar. Figure 3.16 Connecting the pressure relief ducts with a profile bar. 3.5.2 Fastening the top and front joints of the ducts The ducts are fastened to each other from their top and front joints by means of a bolted joint. The fastening screws and nuts (M6) are included in the delivery. Figure 3.18 Bolted joints of the ducts and ends. ABB 13

4 Installing the pressure relief flaps 4.1 Installing the pressure relief duct and pressure relief flap 4.1.1 Pressure relief outwards from the switchgear Instructions Most of the pressure relief ducts delivered consist of two parts: a collar mounted to the pressure relief duct of the cubicles (90.5) and a bushing collar mounted to the outer wall of the building (90.6). The collars are to be shortened as needed depending on the thickness of the wall construction. The bushing collars must be inserted within 70 mm of each other. Mount the collar (90.6) to the wall construction in a way appropriate to the wall material. Pressure relief ducts directed to the side from the end of the switchgear contain constructions in which no separate collar is used (90.6). Instead, the actual duct passes directly through the wall. Figure 4.1 Parts of a pressure relief duct implemented by means of a collar. ABB 14

4.1.2 The pressure relief flap mounted to the outer wall of the building Instructions The pressure relief flap (90.7) contains a pre-installed heat insulation plate. If required, insulate the space between the collar and bushing collar (90.5) with insulation wool before mounting the outward collar (90.6) into place. The pressure relief flap opens from its upper edge, and the opening angle is restricted to 45 degrees by means of a chain installed inside the flap.! Ensure the correct positioning of the flap. The flap is fastened from its upper edge so that the flap's edge is only partially inserted under the screw's head, and the bottom edge has holes that make the opening easier. Mount the flap (90.7) tightly to the outer wall using fasteners that have been selected in accordance with the wall construction.! When mounting the pressure relief flap it should be taken into account that in the event of a possible malfunction, a considerable pressure shock is directed towards the flap. If the flap has not been securely mounted, it may come off, and cause a dangerous situation. Figure 4.2 Structural drawing of a pressure relief duct equipped with a collar. ABB 15

Figure 4.3 Pressure relief flap viewed from the outside. Figure 4.4 Pressure relief flap viewed from the inside. Figure 4.5 Pressure relief flap mounted on a brick wall. ABB 16

2006-02, 100 ABB Oy MV Apparatus & Switchgear P.O.Box 613, FIN-65101 Vaasa, FInland Tel.: +358 10 22 11 Fax: +358 10 22 44661 www.abb.com The information provided in this publication is generally applicable to the equipment described. The manufacturer reserves the right to make changes in the future without a prior notice. UNIS15GB 06-02