The Restoration of Jimmycomelately Creek

Similar documents
The Blue Heron Slough Conservation Bank

RESTORING 400 ACRES OF TIDAL MARSH IN THE SNOHOMISH RIVER DELTA

MCCAW REACH RESTORATION

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

COA-F17-F-1343 YEAR END REPORT

Sub-watershed Summaries

East Kitsap Peninsula WRIA 15 Salmon Habitat Restoration Strategy Summary

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

Union Pacific Railroad

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Puget Sound Shorelines. Waves and coastal processes. Puget Sound shorelines: Effects of beach armoring

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Jamestown S'Klallam Tribe Natural Resources Department Report to General Council September 13, by Scott Chitwood

Strategies for mitigating ecological effects of hatchery programs

Chagrin River TMDL Appendices. Appendix F

X.B WETLANDS ROGUE RIVER ESTUARY

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Wild Steelhead Coalition Richard Burge Conservation VP September 11, 2006

U.S. Fish and Wildlife Service Native American Crosscut Funding

The Salmonid Species. The Salmonid Species. Definitions of Salmonid Clans. The Salmonid Species

Okanagan Sockeye Reintroduction

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

Searsville Dam Removal

Yakima/Klickitat Fisheries Project

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Hood Canal Steelhead Project A conservation hatchery experiment. Joy Lee Waltermire

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Estuary & Salmon Restoration Program

Clallam County Shoreline Master Program Update. Draft Public Land/Access Inventory Emphasis on Shoreline Public Access

2012 Bring Back the Natives Awarded Projects

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

Jamestown S Klallam Tribe Natural Resources Department. Scott Chitwood Natural Resources Director March 8, 2008

Conserving the Forests, Lakes and Streams of Northeast Michigan

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

STEELHEAD SURVEYS IN OMAK CREEK

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Restoring the Iconicc Lower Cache River

Deschutes WRIA 13 Salmon Habitat Recovery Committee SRFB / PSAR Letter of Intent Form

Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

6. FRESHWATER REACH SUMMARY

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

FACT SHEET I. LOCATION

11426 Moorage Way P.O. Box 368 LaConner, WA Phone: Fax:

Ned Currence, Nooksack Indian Tribe

Cat Island Chain Restoration

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

ESTIMATED RETURNS AND HARVEST OF COLUMBIA RIVER FALL CHINOOK 2000 TO BY JOHN McKERN FISH PASSAGE SOLUTIONS

Salmon Recovery Planning in Washington

Conservation and Restoration Florida s Coastal Marshes: An Overview of MESS. Jeff Beal, Kent Smith, Erin McDevitt, Maria Merrill

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Brook Trout in Massachusetts: A Troubled History, A Hopeful Future

Environmental Review and Permitting for Wild Trout

Backgrounder and Frequently Asked Questions

What was the historic coaster fishery like?

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Nechako white sturgeon are an Endangered Species

2016 Volunteer Program Annual Report

Three point plan to addressing land use and habitat loss impacts on Chesapeake Bay tidal fish and shellfish

Lake Chelan Kokanee Spawning Ground Surveys 2012 Final Report

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD

What happens to Oregon s tidal wetlands with sea level rise?

Commercial Net Pen Salmon Farming in Washington State

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II October 2014

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FWCP External Projects Delivered by Stakeholders and First Nations

A BLUEPRINT FOR THE PENOBSCOT RIVER WATERSHED

Eastern Brook Trout. Roadmap to

Fish Community. Fish Habitat, Streams and Rivers

Don Pedro Project Relicensing

Maintaining biodiversity in mixed-stock salmon fisheries in the Skeena watershed

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

Conservation Planning in Vermont

The Malaspina Okeover

Staff, Organizations Directly Affected (including but not limited to):

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Hoh River Wild Steelhead on the Brink

Restoration Project at Trout Run Nature Preserve

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

Restoration of the Nisqually River Delta and increased rearing opportunities for salmonids

The Calawah River System

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Texas Water Resources Institute

New England Atlantic Salmon Programs DPS Delineations

UNIT 4E. SALMON SUPPLEMENTAL INFORMATION

CHAPTER 2 - THE COQUILLE FISHERY

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

Transcription:

The Undevelopment of Jimmycomelately Creek & Estuary Jimmycomelately The Restoration of Jimmycomelately Creek The Jimmycomelately (JCL) watershed comprises an area of 15.4 square miles, with JCL being the major tributary flowing into Sequim Bay. In the early 1990 s, the Jamestown S Klallam Tribe (Tribe), the Clallam Conservation District, Clallam County and others began to address the problems associated with declining fish populations and increased flooding on the south Sequim Bay Estuary and Jimmycomelately Creek. Since that time extensive partnerships have developed, grant funding has been sought and received, restoration plans have been written and implementation is currently underway. Project goals established by the partners include: Restore the river and estuarine habitat of JCL Creek and South Sequim Bay for fish and wildlife habitat in perpetuity; Reduce flood hazards to homes, roads and utilities; Monitor and evaluate the project as a model restoration program; Keep the community involved. To accomplish these goals, technical experts recommended the realignment of JCL Creek into one of its historic sinuous channels, reconnecting the link between the creek and the tidal actions of the estuary, and restoring estuary habitat. Actions include removal of fill and roads, JCL Creek just upstream of the restoration area the construction of a new Highway 101 bridge, native re-vegetation, and land acquisition required to accomplish the restoration goals. Also included in the project are future low-impact public access and small-scale educational activities. The History of the Jimmy Development of south Sequim Bay began in the late 18th century with logging, roads and development, railroad construction, dredging, wetland drainage, fill and diking. JCL Creek itself was relocated, channelized and straightened, and constricted by roads and fill to facilitate farming and the settlement of the community known as Blyn. In the late 1800 s, wetlands were filled and converted for a mill and a log yard that was in operation until the late 1990 s. In addition, native vegetation was removed, and non-native vegetation became established on the fill and dikes. Who was Jimmy? Historians dispute the identity of the Creek s name. The Creek may be a namesake for a watchmaker named Jimmy Whittier who was an early settler in a cabin nearby. The term Jimmycomelately was generally used by Indians and early settlers to refer to newcomers who were ill-prepared for pioneer living on the Olympic Peninsula.

Page 2 Jimmycomelately The Jimmycomelately Creek Lower Sequim Bay Estuary Restoration Project The Washington Harbor people fish for dog salmon in a creek near Blyn. The chief owns the trap at the mouth of the creek. Gunther, 1927; Klallam Ethnography Summer Chum Salmon Jimmycomelately Creek and Sequim Bay have long been important to the Jamestown S Klallam People as a major traditional hunting, fishing, shellfishing and gathering area for thousands of years. In the old days, every creek entering the bay held at least one salmon trap, including those at JCL, where S Klallams fished for dog or chum salmon. One of the most important and urgent reasons for attempting to restore JCL and its estuary is that the creek has a run of summer chum salmon, an ESA-listed species, which is now nearly extinct. Only seven chum returned to JCL to spawn in 1999. Spawning escapement has varied dramatically in JCL with a mean estimated annual spawning escapement of 311 over the period from 1974 to 2002. During that same period, the estimated mean harvest w as 49 summer chum, and has been effectively zero since 1993. This year, approximately 460 summer chum returned to the Jimmycomelately. Escapement is: The number of adult fish who have survived all fisheries and returned to make up a spawning population; the portion of the run that returns to natural or artificial spawning areas. The life history of summer chum is unique among the five species of Pacific Salmon, as they are among the earliest fish to return to their natal streams to spawn. Hood Canal/Strait of Juan de Fuca Summer chum are genetically distinct, and reproduce in the lowest reaches of streams in the eastern Strait of Juan de Fuca and Hood Canal. 1400 1200 1000 800 600 400 200 0 Jimmycomelately Summer Chum Harvest Escapement 1973 1978 1983 1988 1993 1998 2003

Jimmycomelately Page 3 Limiting factors include: lack of channel complexity, sediment aggradation, poor riparian conditions and estuarine habitat loss and degradation. Efforts to recover the threatened run of summer chum in JCL are linked to the Summer Chum Salmon Conservation Initiative which was completed in 2000 by the WA Dept. of Fish & Wildlife (WDFW) and Point No Point Treaty Tribes. While habitat measures are being implemented, JCL salmon are on a life-support program known as the Summer Chum Salmon Recovery Project, an effort led by the WDFW, with help from dedicated volunteers and the Tribe. Each fall as fish return to JCL to spawn, a certain number are trapped and spawned, with the eggs going to the hatchery or instream incubation sites, to be raised as a part of the recovery program. Fish are also allowed to move upstream to spawn naturally, dependent upon the numbers returning. One of the most important and urgent reasons for attempting to restore JCL and its estuary is that the creek has a run of summer chum salmon, an ESA-listed species, which is now nearly extinct. Spawning Summer chum salmon Birds feeding on the mudflats of the JCL estuary Other Important Species In addition to summer chum salmon, coho salmon, winter steelhead and sea-run cutthroat trout are known to inhabit JCL Creek. These fish are all considered to be highly vulnerable to the cumulative impacts of land use and management in the upper basin, as well as in the estuary and bay. Cutthroat are listed as a species of special concern by the State because of widespread declines throughout Puget Sound. Forage fish, such as sand lance and herring, also use the estuary for feeding and refuge, and their populations have been heavily impacted by shoreline development and the degradation of the estuary. South Sequim Bay also provides critical habitat for a wide variety of shellfish, and has been certified by the State for South Sequim Bay provides vital habitat for shellfish commercial shellfish harvest. Native littleneck clams are commercially harvested in the south bay. Pacific Oysters have been cultured there since 1975 on State and Tribal lands, and experimental clam culture is currently underway by the Tribe. In addition, many species of birds and mammals depend upon the estuary and bay during parts of their life history. Bald eagles, osprey, cormorants, kingfishers, gulls, ducks and geese, shorebirds, sea lions and otters all share in the abundant food supply of Sequim Bay. Removing most of the log yard pilings and rafts, dikes, fill and wood debris will increase the amount of healthy subtidal and intertidal areas, eelgrass beds and beach habitat which are important for all of these species.

Page 4 Jimmycomelately Jimmycomelately Creek Lower Sequim Bay Estuary Restoration Project Planning Fish & Flooding A century of activities along South Sequim Bay came to a head in the late 1990 s when the summer chum were listed as threatened, and flooding sporadically closed Highway 101, cutting off access to the entire North Olympic Peninsula. Within the JCL project area, wetland fill, native plant removal, agriculture and residential development have resulted in a loss of wetlands and river habitat. The dysfunctional condition of the creek and the bay: Places property owners and local, state and tribal infrastructure at a recurring risk of flood damage, and Limits the ability of the area to provide feeding, rearing and breeding habitats for fish and wildlife species. If successful, this restoration project will reduce flooding. It will also provide measurable benefits to fish including summer chum, coho, winter steelhead and sea-run cutthroat, and habitat for shorebirds, waterfowl, shellfish and the community. Several landowners have actively cooperated throughout... Their willingness to allow creek realignment on, or near their property was a key component to the project s success. Project Planning Following a series of meetings between Blyn residents and a technical review group of biologists and planners, restoration plans were developed for the creek and estuary. These are described in detail in four documents by Shreffler covering the technical studies, partnerships and monitoring: A Preliminary Plan for Restoring Jimmycomelately Creek and the Lower Sequim Bay Estuary, Phase I Report (2000); 1997 Flooding on Old Blyn Highway Phase I Monitoring Plan: Jimmycomelately Creek Realignment (2001); A Conceptual Plan for Restoring the Lower Sequim Bay Estuary (2003), and Channel Design for Realignment of the Jimmycomelately Creek Channel (2003). Historical maps and photos, and soil tests were used to determine the actual route of the new channel. Technical experts also concluded that the new JCL channel should be realigned into the existing lower Sequim Bay tidal channel, enabling movement of sediment from the creek into the tidal action of the estuary. Eventually a channel was designed incorporating a floodplain to accommodate overflows, and large woody debris. In addition, a restoration design was developed for Dean Creek to the west, which also flows through the estuary. Re-vegetation Plan In 2001, the Clallam Conservation District developed a JCL re-vegetation plan to address the establishment of native vegetation along the realigned stream co urse. The plan focuses on the removal of non-native species, primarily Himalayan blackberry, Canada thistle and Reed canary grass, along with the establishment of native grasses and forbs for surface erosion. Wetland species will be planted after channel construction, and woody vegetation during the winter and spring following construction. Monitoring will be performed to ensure co m- pliance with the Plan, and will dictate whether future supplemental plantings, and/or protective devices are needed. Salmon blocked access to creek Property Acquisition Property acquisition from willing landowners began in 1999 by the Tribe, WDFW and WSDOT. Several landowners have actively cooperated throughout the planning and implementation process. Their willingness to allow creek realignment on, or near their property was a key component to the project s success. Monitoring Monitoring is taking place during all phases of the channel realignment and estuary restoration. A phase 1 monitoring plan is in place. An updated long-term monitoring effort will focus on: Ecological processes: hydrology, sediment transport and deposition; Habitat condition & functions: channel morphology and topography, water quality, LWD, soils and flood conveyance; Biological responses: riparian and wetland vegetation establishment, invasive vegetation removal, salmonid use and upland bird use. Permitting has been a huge and complex part of both the creek and estuary restoration, which had to be anticipated and completed before any actual restoration could proceed. The anticipated results are: a net gain of approximately 19.61 acres of marsh, mudflat, and intertidal habitat; removal of 158,863 yd3 fill; 2,700 linear feet gain of creek channel; 1,000 feet of tidal channel gain; 8.99 acres of upland gain; improved hydrology and sediment and nutrient transport; fish access to tidal channels and marshes and the upper watershed; improved aesthetics; reduced flooding of roadway and properties, and improved water quality.

Jimmycomelately Page 5 BEFORE aerial showing existing conditions in 1999 AFTER (virtual) aerial showing re-aligned & restored channel & estuary (Goal: 2005) IN PROCESS: Aerial of newly completed channel upstream of Highway 101 March, 2003

Page 6 Jimmycomelately Project implementation consists of four major phases as follows: Phase 1: Channel Realignment 2002-2003 (Completed 2003) Channel construction began July 2002, with the Clallam Conservation District, Jamestown S Klallam Tribe and U.S. Fish & Wildlife Service leading the effort. The new stream channel, within an area roughly 1,700 feet long and 350 feet wide, is located west of the current channel, and will be approximately 3,490 feet long. It is designed to meander naturally in a stable manner both in the freshwater and intertidal areas. Over time, the LWD placed there will form habitat, and increasingly control the channel form and process. Phase 2: Estuary Restoration / Fill Removal 2003-04 Estuary restoration is dependent on property and easement purchase and funding. A tiered list of priorities based on ecological considerations includes: Remove log deck road, Old Blyn Hwy., log yard pier & wetland fill, (Pier and fill removed in 2003); Restore log yard to 1870 shoreline, remove log yard pilings; Restore Dean Creek and RV park area, remove sediment accumulation at the old creek mouth, acquire/restore private properties within project area, and provide public access and interpretation along the Olympic Discovery Trail. Phase 3: Bridge Replacement 2004 A new bridge over the realigned channel will replace the existing culverts which were not large enough to accommodate flows in the old channel. The design of the new bridge will accommodate flood flows, allow sediment transport to the bay, and improve fish and wildlife passage. Phase 4: Diversion of Existing Creek Flow 2004 The stream flow will be diverted into the new channel after bridge completion and estuary restoration. It is timed to avoid impacting smolts leaving the system or summer chum adults returning to spawn. Any fish in the existing channel below the diversion point will be trapped and removed before the flow is cut off. An earthen plug will close the old channel, and be planted according to the Conservation District s re-vegetation plan. Excavation of the log yard pier and fill The sequencing of these activities does not necessarily coincide with ecological priorities, and instead depends upon nearby landowners who need to have access to their properties, and their willingness to sell or participate.

Jimmycomelately Page 7 2003 Jimmycomelately Status Report Creek Realignment and Riparian Planting The realignment of the creek started in 2002, and the excavation and shaping of the main channel and floodplain were completed in August of 2003. This included digging the channel, and the placement of large amounts of spawning gravel along the stream corridor, as well as large woody debris throughout the system. Riparian planting and seeding has also o c- curred along much of the stream channel. Estuary Restoration and Re-vegetation After acquisition, the log yard restoration b egan in 2003. The log yard pier, along with 30,000 cubic yards of fill from the estuary were removed in 2003. Native wetland plants will be planted in the estuary this fall. Newly cut channel with spawning gravel, LWD and plantings Bridge Replacement The bridge has been designed, funding procured and construction is scheduled for January through June, 2004. The Summer Chum Recovery Project In 2003, over 86,753 summer chum eggs were co llected for the recovery project by the WA Dept. of Fish & Wildlife and the North Olympic Salmon Coalition community volunteers. Eleven volunteers participated on a regular basis this year, and another thirty have generously helped since the program was started. Native seeding and trees (in blue protectors) re-vegetate freshly cut banks Cheri Scalf and NOSC volunteers perform Recovery Project activities This undevelopment project involves the removal of 19,000 dump truck loads of fill and sediment; removal of a bridge, roads, pilings and a pier; building demolition and relocation of utility corridors.

The Undevelopment of Jimmycomelately Creek & Estuary Partnerships & Friends From the beginning, the Jimmycomelately Restoration has been a story of innovation, surprising alliances, and cooperative partnerships. WSDOT: Hwy. 101 bridge design, land acquisition; USFWS: Technical assistance. Conservation Reserve Enhancement Program WA DNR Washington Aquatic Lands Enhancement Account WA Dept. of Ecology Washington Centennial Clean Water Fund WA IAC Washington State Wildlife & Recreation Fund WA SRFB Washington State Salmon Recovery Fund WSU Cooperative Extension The JCL Restoration Team includes: Jamestown S Klallam Tribe: Property owner, project design and coordination; Financial assistance has come from: Clallam County: Permitting, roads and infrastructure; WA Dept. of Fish & Wildlife: Land acquisition, technical assistance; Clallam Conservation District: Channel relocation & vegetation plan; Environmental & Engineering Consultants: Shreffler Environmental, Sam Gibboney Engineering, & ESA, Inc. US EPA: Wetlands & estuary technical assistance; NOAA/NWIFC Pacific Coast Salmon Recovery Program USFWS North American Wetlands Conservation Act & National Coastal Conservation Grant Other cooperators include: Audubon Society (National and North US EPA Wetland Protection Program, CWA Sections 106 & 319, Brownfields, and GIS Grants Olympic Chapter), Battelle NW, local US BIA Watershed Projects; Jobsin-the-Woods ture, Streamkeepers, US Army Corps of USDA Farm Service Agency WA Environmental Council. landowners, North Olympic Salmon Coalition, NTI, Pacific Coast Joint VenEngineers, US Forest Service, and the The complex scientific, legal, financial and engineering challenges of the JCL project have been enormous. However, the commitment of the property owners, technical experts and agency partners has enabled it to progress steadily toward success. THANK Y OU! For more information contact: Sam Gibboney, JCL Project Coordinator or Byron Rot, Habitat Program Manager at the Jamestown S Klallam Tribe, (360) 683-1109. We would like to express our THANKS to Randy Johnson, WDFW for his technical and photographic support. Budget Summary (Estimated Costs) Estuary / Riparian Acquisition: Estuary / Salt Marsh Restoration: Restoration Planning / Monitoring: Channel Relocation / Restoration: Bridge Design & Construction: Total: $2,645,000 $1,200,000 $ 262,500 $ 450,000 $1,400,000 $5,957,500 Plus Inkind Written by Linda Newberry Produced by the Jamestown S Klallam Tribe 2003