Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Similar documents
IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

1. The well has been shut in on a kick and the kill operation has not started.

IWCF Equipment Sample Questions (Surface Stack)

Practice Exam IADC WellSharp Driller and Supervisor

Worked Questions and Answers

OCEAN DRILLING PROGRAM

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

W I L D W E L L C O N T R O L FLUIDS

Study Guide IADC WellSharp Driller and Supervisor

SUBSEA KILL SHEET EXERCISE No. 5

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Deepwater Horizon Incident Internal Investigation

Subsea Safety Systems

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

RPSEA UDW Forum June 22 & 23, Secure Energy for America

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

Hard or Soft Shut-in : Which is the Best Approach?

Chapter 4 Key Findings. 4 Key Findings

Casing Design. Casing Design. By Dr. Khaled El-shreef

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

WILD WELL CONTROL WARNING SIGNS OF KICKS

Why Do Not Disturb Is a Safety Message for Well Integrity

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

W I L D W E L L C O N T R O L COMPLICATIONS

PHE KE30-A8 WORKOVER PROGRAM

Live well deployment of long perforating gun system using combined CT technologies

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

Understanding pressure and pressure

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Dynamic Underbalance (DUB)

Chapter 5 Drilling and Well Testing Practices

NORSOK standard D-010 Rev. 3, August 2004

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

APPENDIX A1 - Drilling and completion work programme

OPTIMUM SELECTION OF WELL CONTROL METHODS

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Float Equipment TYPE 925/926

VOLUMETRIC METHODS and STRIPPING OPERATIONS

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

Hydro-Mech Bridge Plug

Abandonment Program for Paramount Fort Liard F 36

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Oil Well Potential Test, Completion or Recompletion Report, and Log

Nye rapporteringskrav til brønnkontrollhendelser Monica Ovesen Petroleumstilsynet (Ptil)

August 21, Deepwater MPD / PMCD

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

W I L D W E L L C O N T R O L AIR DRILLING

DE149. Wireline Servicing, Fishing Job for Completion and Workover

The Developing Design of the Blowout Preventer in Deep Water

Texas Administrative Code

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

Recommended minimum functional specifications and standards for geothermal wells in the Netherlands v.5

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

DB Bridge Plug. Features. Benefits. Applications

Chapter 5 HORIZONTAL DRILLING

Disposal/Injection Well Pressure Test Report (H-5)

Oil Industry Safety Directorate

Well Control Institute (WCI) Core Curriculum and Related Learning Outcomes: Supervisory Level

Rig Math. Page 1.

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Oil Well Potential Test, Completion or Recompletion Report, and Log

Petr 311 Wellbore pressures and Kick Control

Colorado Oil and Gas Conservation Commission

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

TAM Single SeT inflatable

Casing and Cementing Requirements

Marine Technology Society

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Appendix M Structural Analysis of the Macondo #252 Work String. Appendix M Structural Analysis of the Macondo #252 Work String

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

The SPE Foundation through member donations and a contribution from Offshore Europe

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

A case study : Underground Blowout Control at Well NHK #285

Petroleum Development

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

HydroPull. Extended-Reach Tool. Applications

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

WELL CONTROL OISD RP 174

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

Transcription:

1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers, who were working with the mobile crane, succumbed to the burn injury. 2. Well history The said well was drilled to a target depth of 700 meters seven years back with an objective to produce gas from a shallow gas reservoir. The well was drilled to the target depth, production casing was lowered cemented and hermetically tested at 100 kg / sq. cm and VSP (Vertical Seismic Profile) was recorded Upper Object was perforated and tested. It was found to be hydrocarbon gas bearing with a flow rate of 50 thousand cubic meters per day (8 MM bean size). Average Tubing head pressure was 50 Kg / Sq. cm. The well was subdued with 1.30 specific gravity mud and isolated by placing cement plug against the perforation. Lower Object was perforated and tested. The well ceased after flowing a little gas for few hours. The well could not be activated inspite of number of compressor applications. The well-produced mainly water with little gas. The perforated interval was then isolated with cement plug after subduing the well. Cement was cleared up to 541 meters (one meter below the bottom of upper object) and the well was put on production from the upper object interval (536 540 meters). It was producing with a flow rate of 25 29 cubic meter of gas per day. The bean housing of this well was reported to be getting choked with wet sands frequently and ultimately production was stopped. The well was taken over for workover job for clearing sand deposition in the well, gravel pack and recompletion. Subsequently a charter hired workover mobile rig of 50 ton capacity was deployed at the well for the specific job. 3. Sequence of operations / events Rig building of workover rig on the well. Well was subdued with 1.1 specific gravity brine. X-mas tree was removed & BOP was installed. Released production packer & pulled out the completion string. No activity or loss observed during the pulling out process. Retrievable mechanical packer was lowered and set at 527 meter depth. Production casing was tested at 1000 psi and mechanical packer was released and pulled out. Annular mill was lowered and bottom was tagged at 538 meters (three meters above the cleared depth i.e. 541M). Cleared up to 542 meters. Observed no progress beyond 542 meters. The annular mill was pulled out, replaced with another similar annular mill, run in and tagged bottom at 542M. Page 1 of 5

4. Analysis Could not clear beyond 542.5M in spite of rotating the annular mill for several hours. Cement pieces/ cuttings and metal cuttings were observed during the operation in the return. Brine weight reduced to 1.05 from 1.1. It was increased to 1.13. Continued circulation to stabilize the well. After stabilizing the well, continued rotation of mill for several hours but could not drill / mill beyond 542.5M. Metal pieces / cement cuttings were observed in the return. The annular mill was then, pulled out of hole. Made up flat mill, run in and tagged bottom at 542.50M. Milled up to 543M only in spite of rotating mill for many hours but could not mill beyond this point. Observed metal pieces in the return. Stopped milling operation and pulling out string with mill started. During pulling out last stand of 4-1/8 diameter drill collars, observed gas flow from the well which became uncontrollable. An unsuccessful attempt was made by the rig crew to run back in the well followed by closing the blind ram against the drill collars. The uncontrolled flow of gas from the well continued. The drill collar stand that was stuck between the blind rams broke in two pieces and was thrown out of the well. The pipe rams of the BOP stack were replaced by blind rams under water umbrella and closed. The flow of gas from the well reduced to feeble flow but continued. The feeble flow of gas through closed blind rams again increased gradually to full bore flow. An effort was being made on 4 th day to replace the BOP stack under water umbrella. During this process, the flowing gas caught fire. Due to fire, twelve persons working for replacement of BOP stack received severe burns. The uncontrolled flow of gas reduced to feeble gas leakage at its own on 16 th day. BOP stack and annulus valves were replaced after killing the well by pumping heavy mud. Well was finally plugged with pumping cement in to it. 4.1. Observations The producing interval of upper object (540 536) meters was open throughout the work-over operation. The well was subdued with 1.10 Specific gravity Brine; however the same interval was subdued with 1.30 specific gravity mud after testing. The specific gravity of brine could not be maintained during the entire clearing operation may be due to mixing of formation water, which was continuously entering in the well bore with gas from the open perforated interval (540 536) or casing cut point. Well was not stabilized. This is the primary requirement that well should be stabilized prior to carrying out any operation in the well (specially gas well). Further brine cannot stop or reduce the gas migration in the instant case due to low specific gravity and viscosity. Gas migrates and expands very fast in brine. Gas wells must be stabilized Page 2 of 5

with drilling mud (high specific gravity and viscosity) instead of brine for carrying out milling or cement drilling operations. An annular mill was lowered with 4-1/8 round drill collars to clear the sand instead of a drill bit. This mill was not able to clear the well bore beyond 542.5 meters (bottom tagged at 538 meters). Still, it was rotated for a many hours at the same point, which may have resulted in casing cutting. This is evident from the metallic cuttings which were being observed in the return fluid continuously. The milling string was pulled out without stabilizing the well. Also, the well was not monitored for its behavior during pulling out operation. There is no evidence of filling trip sheet to monitor well behavior during pulling operation. The swabbing of gas during pulling out coupled with the gas intrusion from open perforation / casing cut reduced the hydrostatic head drastically and resulted in uncontrolled flow of gas from the well. The gas kick was noticed when the last stand of drill collar was being pulled out. Instead of pulling it out or dropping it in the well, the rig crew tried to connect a drill pipe and run back the same in the well, which is a wrong operation. Blind ram was closed against the drill collar which resulted in damage to the blind ram. This indicates that the operation personnel of the workover rig were not competent for well control operations. There was no any BOP in the BOP stack, which could be closed against 4 1/8 drill collars. It means that that there was no tested barrier when the 4 1/8 drill collars were against the BOP. The ram block was replaced in flowing well conditions with water spray for cooling. It could not hold the pressure. This indicates that the BOP ram cavities were damaged severely during closure of ram against drill collars or the BOP was got damaged prior to the blowout. There was no evidence of carrying out BOP function test, BOP Low and High pressure test. There was no evidence of conducting Emergency mock drills, Trip drills, BOP drills. Trip sheets were not being filled to monitor the well behavior during pulling out operations. During pulling operations, the following SOPs were not followed by the operational personnel of the rig: Prior to starting pulling out, observe the well for the time at least equal to the time required for complete pulling out plus safety margin. Circulate for at least bottom up to ensure that no influx has entered in the well bore. Check for self-flow intermittently. Prior to pulling out BHA, observe the well for the time at lease equal to the time required for making up pup joint, putting drill collars clamps and pulling out BHA plus safety margin. Page 3 of 5

Circulate for at least bottom up to ensure that no influx entered in the well bore. Check for swabbing during pulling out. The root cause of the incident is ignorance of basic operational practices by the operational personnel of the rig; inadequate supervision and monitoring by all concerned. 5. Root cause The root causes of the incident are enumerated below: Well was not stabilized during the entire operations with the brine. String was pulled out without ensuring the stability of the well. During pulling out, the well was not being monitored for its behavior. Use of brine itself is inappropriate instead higher density mud should have been used. The mill was not able to clear beyond 542.5 meters. Still the milling tool was rotated continuously at the same point. This might have resulted in damaging the casing. The blind ram was closed against the drill collars which was a wrong operation. BOPs were not tested at the desired level of pressure. The reason of fire may be development of spark inside the cabin penal, battery terminals of the mobile which was stationed near the cellar pit area and was being used for BOP replacement job. 6. Recommendations: The responsibilities of Operator and Contractor must be clearly mentioned in the Bridging document in respect of handling emergency situations viz. operations, well control operations etc. Competency criteria for key operational personnel of charter hired rigs must be developed considering all the specific requirements and associated jobs. Competency of work-over operational personnel must be enhanced by training, retraining including regular assessments. Level of supervision should be increased for work-over in gas wells. It must be ensured that only persons having adequate experience and competency in workover operations be deployed in workover of gas wells. The workover operations in gas wells must be carried out using drilling mud only. Before designing String, it must be ensured that the BOPs of BOP stack is suitable for closing on its tubular components. All BOP function tests, BOP low and high pressure test must be carried out in accordance with the requirements of OISD-RP-174. Trip drills for all the three scenarios mentioned in OISD-RP-174 shall be carried at regular intervals in the presence of senior officers. Reports of the tests / drills to be signed by concerned in charge and witnessed by the senior officer of work-over department. Page 4 of 5

It is recommended that blind cum shear ram in place of Blind ram and 2-7/8 to 5 variable ram should be provided for workover operations in gas wells. Use of Trip Tank must be made mandatory to monitor well behavior of well during pulling out operations in work-over of gas wells. Trip sheet must be filled during pulling outs. WELL DIAGRAM OF ONGC ANKLESHWAR WELL#OLPAD-31 Page 5 of 5