CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Similar documents
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

MARKHOUSE ROAD IMPROVEMENTS

Leyton to Blackhorse Road Route Markhouse Road Section

Lea Bridge Road A street for everyone Tell us

BYRES ROAD: PUBLIC REALM Public Consultation

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

HISTON ROAD Have your say on better public transport, cycling and walking journeys

ENFIELD TOWN THE REVISED DESIGN

Walthamstow Village: trial results and workshop summary

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

ENJOY WALTHAM FOREST WALKING AND CYCLING ACCOUNT

Background. Caversham a vision for the future. Joint public meeting arranged by:

Cycle Superhighway 4 from Tower Bridge to Greenwich

MILTON ROAD LLF PROJECT UPDATE

Chelmsford City Growth Package

College Green traffic management changes

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

CUERDEN TRANSPORT PROPOSALS

SHOTLEY BRIDGE VILLAGE TRUST

Sevenways Roundabout, and the need for a Road Safety Scheme:

Milton Road Project Update. Paul van de Bulk 30 January 2018

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Easton Safer Streets - Final Project Report BRISTOL

Your views are important. Please fill in a form before you leave. Or alternatively

Appendix 12 Parking on footways and verges

How do we design for pedestrians? Case study: transforming the Walworth Road

London Cycle Network Annual Report 2000

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

Nottingham Cycle City Frequently Asked Questions

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Dowling/Beaty Cycling Route

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

The Consultation has now ended.

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

2. Context. Existing framework. The context. The challenge. Transport Strategy

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit

The Rower Traffic Management Scheme

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Low traffic neighbourhoods

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

20mph. We want to make Edinburgh a better and safer place to live, work and play.

Mornington Crescent Junction (Cobden Junction)

Frome Street Bicycle Route

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan

LET US KNOW WHAT YOU THINK

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Nelson City Council Tahunanui Pathways 7 December 2017

APPELLANT S STATEMENT OF CASE

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL

Chelmsford City Growth Package

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Consultation Report & Results August 2016

CAMBRIDGE SOUTH WEST PARK & RIDE

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Have your say on the transformation of Oxford Street West

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Bristol City Council has produced a draft Bristol Transport Strategy document.

BOROUGH-WIDE SPEED LIMIT CONSULTATION

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards

Maynooth Cycling Submission on North South Corridor

Welcome! Public Open House on UBC s Transportation Plan

Guildford Borough (Draft)

1 st and 2 nd Street Couplet FAQ s

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Enjoy Waltham Forest. Cllr Clyde Loakes. Jon Little. Bespoke Transport Consulting. London Borough of Waltham Forest

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Oxford Street West. 21 December

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential

A105 Scheme. Consultation Report. Dated 29 January 2016

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

FAQ s Walsh Road / Ferguson Road Pilot Scheme

Welcome. If you have any questions or comments on the project, please contact:

to the Public Information Centre for the Downtown Traffic Study

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Design Workshops Summary of all Feedback January 2017

Hopkins Architects. University of Nottingham. University Park Campus Masterplan Strategy. 13 th February 2009

Strategy for Walking & Cycling Action Plan

Bus and Transit Lane Review Update

Transcription:

CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk

CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from Transport for London (TfL) for the Mini- Holland Programme to make significant improvements to the borough and encourage more local people to walk and cycle. Church Road runs between Lea Bridge Road and High Road Leyton in the south of the borough and is used by up to 12,000 vehicles and 150 cyclists daily. The road has seen 52 accidents in the last five years meaning that changes to improve navigation and road safety for all road users are key. Key proposals Overview of the proposals 2 Improvements to cycle lanes Fully segregated north and southbound cycle lanes on Church Road between Lea Bridge Road and Capworth Street. A quieter and safer cycle route for cyclists travelling north and southbound via Capworth Street, Manor Road, and Grange Park Road. Fully segregated two-way cycle lanes on Grange Park Road (south), Leyton High Road and Church Road. Improvements to the pedestrian street environment New street lighting Better signage for people who cycle Wayfinding 20mph zones Improvements to bus stop accessibility Safer crossing at road junctions Aims of the scheme As part of the Mini-Holland Programme we are investing in the Church Road area to transform the streets, encouraging more people to walk and cycle. The Church Road scheme is part of the Mini-Holland Leyton to Blackhorse Road cycling and walking route, providing excellent links to Forest Road E17, Orient Way E10, Ruckholt Road E10 and local amenities and services. As well as providing better facilities for people who cycle, the road will be improved for local residents, businesses and visitors to the area. The Church Road scheme aims to: Encourage more residents and visitors to walk and cycle Improve the look, feel and road safety of the area for all road users Improve access across the borough including access to local amenities and services between areas in the borough and local amenities. Reasons for changes To make the road safer for all road users, especially those who walk and cycle, whilst encouraging more people to cycle. To make the routes safer whilst improving the look and feel of the area making it an enjoyably place to be. To reduce traffic speeds in the area making it safe and enjoyable for all. To improve the road for all road users, especially those using public transport. To make navigating junctions easier and safer for all road users.

KEY INFORMATION AND DATES Working with the local community We want to work together with the local community to help shape the plans and have already started this engagement process by getting local people s ideas and feedback. In March this year a survey was carried out with local residents and businesses to get their views, concerns and aspirations for the area. The results can be found at www.enjoywalthamforest.co.uk/work-in-youarea/church-road. The feedback received has helped us to develop a design for the area that is based on the needs of local residents and businesses. Consultation approach We want everyone who lives, works and uses the road to have their say on the scheme proposals. We want to ensure that people understand the improvements, the reason for them as well as the potential benefits that they may bring. We are asking for your views on the proposals as a whole rather than on individual measures. We are asking you to rate the proposal as well as asking what else you would like to see. This will allow us to shape and develop a scheme that best suits the local community. What happens next? The feedback received will be carefully analysed and considered as part of our final design. Where possible, we will try to incorporate people s suggestions however where this is not possible we will provide a reason why. We will produce a summary of the results for everyone who took part and will say how they have been used. How you can have your say There are a number of ways for people to provide comments: Complete our online survey by visiting www.enjoywalthamforest.co.uk/work-in-you-area/church-road Visit us at our information stand to view the plans and ask questions on Wednesday 15 July at 5pm to 8pm, St. Joseph s Catholic Junior School, 150 Vicarage Road, London E10 5DX Request a paper copy of the consultation document by calling 020 8496 3000 or emailing miniholland@walthamforest.gov.uk. Timescales Stage Timescales Public consultation July 2015 Detailed scheme design September to October 2015 Construction Late 2015 Review of scheme From six months after implementation 3

CHURCH ROAD PROPOSAL The proposal has been developed based on the results from surveys, information on traffic movements and traffic survey data. The residential area is also part of the Mini-Holland Leyton Town Centre scheme and will benefit from further improvements to the area such as public realm improvements in 2016. The key elements of the proposals are shown on maps one to five and outlined in this document. To help us manage the scheme, the area has been separated into three sections, A, B and C, however the consultation questionnaire will ask you to comment on the route proposals as a whole. Cycle route We want to provide the best possible route for people who cycle in the area. A cycle route is prosed on Church Road from Lea Bridge Road through to High Road Leyton. Although Church Road provides a direct route to High Road Leyton, the cycle route will be directed off Church Road in order to reduce parking impacts to residents living on the road whilst providing a safe and quiet route for cyclists. The cycle route at its northern and southern ends will include a mix of fully segregated cycle tracks with section B providing a quieter route for cyclists through residential streets. Section B will have improved cycle wayfinding measures implemented, and due to the nature of these streets segregated cycle tracks will not be implemented in this section. The cycle route will begin on Lea Bridge Road with fully segregated cycle lanes, turn left at Capworth Street and then right onto Manor Road providing a much quieter, safer and more direct route. It will then link back into the fully segregated route at Grange Park Road, Church Road and Leyton High Road (as shown on map one). To facilitate the proposed route, new cycling facilities such as improved signage will be put in place to make the direction of travel clear for cyclists. The route will also be potentially enhanced by the Leyton Town Centre improvements. To accommodate the fully segregated tracks the following changes will be made to the existing road layouts: Section A (see map two) Removal of the single yellow line Partial removal of bus lane. Section C (see map four) Removal of single yellow line Removal of bus lane between Grange Road and High Road Leyton Removal of existing parking and loading provision on the following roads. Where parking is removed we will seek to make additional parking in surrounding area. - Grange Park Road between Church Road and High Road Leyton - Eastern side of High Road Leyton between Church Road and Grange Park Road. Creating a safer environment Residents have told us that reducing the amount of speeding traffic and creating a safer environment in the scheme area are key priorities. In response we are proposing to introduce a number of measures that will improve safety in the area for all road users. 4

CHURCH ROAD PROPOSAL A 20mph speed restriction will be put in place along Church Road along with traffic calming measures, such as raised junctions and crossings, to reduce speeds and improve the safety for all road users. Raised Copenhagen style crossings, also known as blended crossings, will be implemented at all minor side roads. The pedestrian footway will be continued across side roads, giving priority to pedestrians and cyclists over vehicles. Vehicles will slow down on entering or exiting the side road with tighter corners on the junctions, and give way markings. Significant improvements will be made to existing crossing points on Church Road as can be seen in the section B and C proposed measures. Section B (see map three) Church Road junction with Capworth Street raised priority junction Church Road junction with Oliver Road raised signal controlled junction Park Road to Marsh Lane raised cycle/pedestrian parallel crossing upgrade Opposite 132 Church Road raised uncontrolled pedestrian crossing Church Road junction with Goldsmith Road raised junction with uncontrolled pedestrian crossing. Section C (see map one) Improved zebra crossings will be located at: Church Road junction with Grange Park Road Grange Park Road junction with High Road Leyton Church Road junction with High Road Leyton. Bus stop improvements Existing bus stops will be updated (or improved) to make conditions safer for cyclists and bus passengers, and to prevent buses from having to slow down to avoid people cycling. The new bus stops will reduce the chance of conflicts between pedestrians and cyclists, and avoid the sometimes hazardous interactions between buses and cyclists. The bus stops will be upgraded to TfL accessibility standards making this better for elderly or disabled passengers and parents with prams and buggies. How you can have your say We want to hear your views on the proposed improvements. Complete our online survey by visiting www.enjoywalthamforest.co.uk/work-in-you-area/church-road Visit us at our information stand to view the plans and ask questions on 15 July at 5pm to 8pm, St. Joseph s Catholic Junior School, 150 Vicarage Road, London E10 5DX Complete a paper copy questionnaire and return it using the freepost envelope provided. To request a paper copy of the consultation document and questionnaire call 020 8496 3000 or email miniholland@walthamforest.gov.uk. For more information on the Church Road scheme or the Mini-Holland Programme visit www.enjoywalthamforest.co.uk, or email miniholland@walthamforest.gov.uk. 5

KE SECTION A: FULL SEGREGATED TWO - WAY CYCLE LANES AND 20MPH ZONE SECTION C: FULL SEGREGATED TWO - WAY CYCLE LANES AND 20MPH ZONE 6 MAP 1 SCHEME OVERVIEW CHURCH ROAD MINI HOLLAND ROUTE: OVERVIEW SECTION B: 20MPH ZONE

254 252 351 333 331 ZONE TO LEA BRIDGE ROAD SECTION A SECTION A 260 262 264 371 363 373 GLOUCESTER ROAD 258 359 353 MALTA ROAD TALLACK ROAD ESTATE WAY PALAMOS ROAD 319 MAP 2 SECTION A 240 238 228 228a 230 232 234 307 305 ZONE TO SECTION B PROPOSED NORTHWEST AND SOUTHEAST CYCLE ROUTES CONTINUATION CAPWORTH STREET 7

228 228a 230 232 234 295 307 12 40 40b 15 40a 11 65 38a 61 57 55 49 9 10 14 16 1 307 El 4 3 ZONE TO SECTION A 238 305 PROPOSED NORTHWEST AND SOUTHEAST CYCLE ROUTES CAPWORTH STREET CONTINUATION ZONE TO SECTION A 238 228 228a 230 232 234 305 PROPOSED N SOUTHEAST KEY CAPWORTH STREE CONTI SECTION B 295 RAISED PRIORITY JUNCTION TION B LOCATION PLAN RAISED CYCLE/PEDESTRIAN PARALLEL CROSSING UPGRADE RAISED UNCONTROLLED PEDESTRIAN CROSSING SECTION B RAISED JUNCTION WITH UNCONTROLLED PEDESTRIAN CROSSINGS 8 MAP 3 SECTION B LOCATION PLAN CHURCH ROAD MINI HOLLAND ROUTE: SECTION B CAPWORTH STREET TO GRANGE PARK ROAD WALTHAM FOREST RAISED SIGNAL CONTROLLED JUNCTION 14 16 18 20 22 Works GRANGE PARK ROAD 34 38 1 to 7 49b 49a Club PROPOSED NORTHWEST AND SOUTHEAST CYCLE ROUTES CONTINUATION 47 39 37 TENNYSON ROAD Grange Park United Reformed Church Sub Sta Lion and Key (PH) 465 473 1 to 30 John Strype Court 442 448 450 444 446 John Strype ZONE TO SECTION C Court 1 to 30 454 Leyton Vicarage 460 452 Grove House VICARAGE ROAD LINDLEY ROAD Grove House HIGH ROAD LEYTON 466 Garage Hall 70 Parish Hall Hall

4 454 55 70 Leyton Vicarage 40 40b 40a 15 11 GRANGE PARK ROAD 49 49b 49a Club PROPOSED NORTHWEST AND SOUTHEAST CYCLE ROUTES CONTINUATION 9 10 12 14 16 1 TENNYSON ROAD El Sub Sta 1 to 30 John Strype John Strype Court Court 1 to 30 VICARAGE ROAD START OF 20MPH ZONE LINDLEY ROAD 478 466 HIGH ROAD LEYTON Garage Hall ZONE TO SECTION B 460 Hall Parish Hall 3 DAWLIS SECTION C 14 16 18 20 22 Lion and Key (PH) LOCATION PLAN Works 38a 26 32 32a 34 38 Grange Park United Reformed Church 465 473 a 442 442 448 450 444 446 452 Grove House PROPOSED NORTHWE SOUTHEAST CYCLE R 57 to 63 Grove House CONTINUATIO 438 455 1 WILMOT ROAD ZONE TO SECTION B 14 22 47 39 37 29 21 13 445 to 451 426 Garage 404 to 424 BUCKLAND ROAD 2 Surgery SECTION C SECTION C 62 to 93 429 to 437 388 to 392 394 386 MAP 4 SECTION C LOCATION PLAN CONSULTATION DRAWING: SECTION C HIGH ROAD ONE WAY SYSTEM FROM GRANGE PARK ROAD WALTHAM FOREST 49 to 31 26 to 30 1 to 12 HIGH ROAD 368 366 START OF 20MPH ZONE 376 to 380 374 372 364 382 SEDGWICK ROAD 44 25 9 58 62 60 66 64 8

CYCLE ROUTE CYCLE ROUTE CYCLE ROUTE LOCATION PLAN 10 MAP 5 CYCLE ROUTE CHURCH ROAD MINI HOLLAND ROUTE: CYCLE ROUTE VIA CAPWORTH STREET, MANOR ROAD AND GRANGE PARK ROAD WALTHAM FOREST

SURVEY RESULTS Headline results from the early engagement surveys. 40% of Church Road businesses said they would like to see a better retail, business and service mix BANK 20% would like to see better lighting 20% improved public spaces 20% better crossing points whilst 20% think they arrive by foot 65% of respondents on Church Road walk 52% use public transport 42% would like safer crossing points 50% of respondents would like more places to sit To make Church Road a better place for walking and cycling 47% would like protected cycle lanes 60%of businesses on Church Road think their customers arrive by car 20% think they use public transport and 13% think their customers cycle 38% take the car 27% cycle 47% would like more cycle parking of businesses on Church Road 47% said that some areas feel safe 33% said some areas are 40% 47% said business could be better said it is easy to get around unattractive 33% said business is flourishing 56% of respondents feel that some areas on Church Road are unattractive 51% 51% say the area feels like a community For more information on the Church Road scheme visit www.enjoywalthamforest.co.uk/work-in-you-area/church-road say some areas don t feel safe 11