VAG DUOJET Automatic Air Valve

Similar documents
Operating and Maintenance Instructions. VAG BETA 200 Gate Valve

Operation and Maintenance Instructions. VAG PICO Pilot Operated Control Valve

Water. VAG DUOJET Automatic Air Valve Single-chamber type PN 10/16/25/40 - DN KAT-A 1912

Operating and maintenance instructions. VAG ZETA Knife Gate Valve Version with handwheel

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Combination Air Valve

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation, operation & maintenance manual - original version

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Installation & Operation Manual Proven Quality since 1892

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Installation, Operating and Maintenance Manual Overflow Regulator Type 94/ 94 E

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

Operating instruction

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

lead water to the next level NEEDLE VALVES

Engineering Data Sheet

Installation, Operation and Maintenance Manual for Back Pressure Regulator

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Steam trap BK 37 BK 28 BK 29 BK 37 ASME BK 28 ASME BK 29 ASME

Declaration of Conformity as per Directive 97/23/EC

SCA Series Inverted Bucket Steam Traps

Non-Return Valve SRK 22A

Pressure relief valve

Declaration of Conformity as per Directive 97/23/EC

KTM 50 (DN ) Installation, maintenance and operating instructions

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Declaration of Conformity as per Directive 97/23/EC

1200B2 Series Service Regulators. Instruction Manual

Control Valve with ZK Radial Stage Nozzle ZK 210. Original Installation Instructions English

Bermad Model:

Mounting and Operating Instructions EB 3017 EN. Self-operated Regulators

Combination Air Valve Model

Installation and operating instructions KEMPER Backflow Preventer BA Figure 361

Water Safety Shut-off Valve HON 790

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Inverted Bucket Steam Trap IB 16A-7

ITT RICHTER CHEMIE-TECHNIK

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Steam Trap BK BK 212-ASME. Original Installation Instructions English

MANUALLY OPERATED VALVE VLM SYNCROFLUX TECHNICAL MANUAL MT042/E

OPERATING MANUAL CHEMTRAC 840M MANUAL RETRACTABLE PROCESS HOLDER

Installation / Operation / Maintenance Manual KLINGER Reflex Level Gauge Type R 25

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

SEries 29 Hydrant valves installation, operation & maintenance manual

Pressure Reducing Valve DMV 750 set range: bar

Pressure relief valve

Regulator from 1800 B series

776 Cryogenic Safety Valve

Wastewater combination air valve in stainless steel AISI 316 Mod. SCS

Telefon (+45) Telefax (+45)

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats

SECTION BUTTERFLY VALVES

Flowmeter. Original operating manual DFM

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

Ball Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

MAINTENANCE AND OPERATING MANUAL

Model MTB-ASME Vertical Bladder Tanks

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

Type BBS-03, BBS-05, BBS-06, BBS-25

Installation and commissioning instructions 255 series and 256 series

Declaration of Conformity as per Directive 97/23/EC and Manufacturer s Declaration as per Directive 98/37/EC

TITAN FLOW CONTROL, INC.

Horizontal Bladder Tanks

Installation and Operating Instructions Bypass Flow Meter DST

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Model MTB-ASME Vertical Bladder Tanks

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

756 Safety Relief Valves

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Vertical Bladder Tanks

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Mounting and Operating Instructions EB 2555 EN. Self-operated Pressure Regulators. Pressure Reducing Valves Type 50 ES Type 50 EM.

RD(H)20/25 Pressure-Reducing Regulator User Manual

Manual Actuated Boiler Blowdown Valves

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

Pressure relief valve DHV 712 DN 65-80: 0,5-10 bar, DN : 0,3-4 bar, DN 100: 0,5-6 bar

OPERATING INSTRUCTIONS

Control Valves ZK 610 ZK 613

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm

safety Shut-Off Valve HON 721

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats Installation and Maintenance Instructions

Transcription:

Operation and Maintenance Instructions VAG DUOJET Automatic Air Valve KAT-B 1912 Edition2 05-10

Contents 1 General 3 1.1 Safety 3 1.2 Proper use 3 1.3 Identification 3 VAG reserves the right to make technical changes and use materials of similar or better quality without express notice. The pictures are non-binding. 2 Transport and Storage 3 2.1 Transport 3 2.2 Storage 3 3 Product features 4 3.1 Features and function description 4 3.2 Applications 4 3.3 Performance limits 4 3.3.1 Minimum pressure 4 3.3.2 Air inflow performance data 4 3.3.3 Venting performance data 4 3.3.4 Air release valve performance data 5 4 Installation into the pipeline 5 4.1 Conditions required on site 5 4.2 Installation location 5 4.2.1 Installation in pipeline < DN 600 5 4.2.2 Installation for pipelines DN 600 6 4.2.3 Water flow rate 6 4.3 Installation position 6 4.4 Installation note 6 4.4.1 Installation position downstream from pumps 7 4.4.2 Installation in standpipes 7 4.4.3 Discharging splashing or surge water 7 4.5 Assembly instructions and fittings 8 5 Set-up and operation of the valve 8 5.1 Visual inspection and preparation 8 5.2 Function check and pressure test 8 6 Maintenance and repair 8 6.1 General safety instructions 8 6.2 Inspection and operation intervals 8 6.3 Maintenance work and replacement of parts 9 6.3.1 Design 9 6.3.2 Recommendations for the replacement of parts 9 6.3.3 Replacement of the seals (3.2 and 8) 10 6.3.4 Bolt tightening torques 10 7 Trouble-shooting 10 8 How to contact us 10

1 General 1.1 Safety These Operation and Maintenance Instructions must be observed and applied at all times along with the general VAG Installation and Operation Instructions for Valves (see www.vag-group.com / Category: Installation and Operation Instructions). When using this valve, the generally acknowledged rules of technology have to be observed (e.g. international standards, etc.) The installation must only be carried out by qualified staff (see also Section 7.1 General safety instructions). For further technical information such as dimensions, materials or applications, please refer to the respective documentation (KAT-A 1912). VAG valves are designed and manufactured to the highest standards and their safety of operation is generally ensured. However, valves may be potentially dangerous if they are operated improperly or are not installed for their intended use. Everyone dealing with the assembly, disassembly, operation, maintenance and repair of the valves must have read and understood the complete Operating and Maintenance Instructions (and also Accident Prevention Regulations and ANSI Z535). Before removing any protective devices and/or performing any work on the valves, depressurise the pipeline section and ensure it is free of hazards. Unauthorised, unintentional and unexpected actuation as well as any hazardous movements caused by stored energy (pressurised air, water under pressure) must be prevented. In case of equipment that must be monitored and inspected, all relevant laws and regulations, such as the Industrial Code, the Accident Prevention Regulations, the Ordinance of Steam Boilers and instructional pamphlets issued by the Pressure Vessels Study Group must be complied with. In addition, the local accident prevention regulations must be observed. 1.3 Identification According to DIN EN 19 all valves bear an identification label specifying the nominal diameter (DN), nominal pressure (PN), body material and the manufacturer s logo. A rating plate is attached to the body and contains at least the following information: VAG Manufacturer s name Valve type DN Nominal diameter of the valve PN Nominal pressure of the valve Body material EN-JS 1030 (GGG-40) Date of manufacture 2 Transport and Storage 2.1 Transport For transportation to its installation site, the valve must be packed in stable packaging material suitable for the size of the valve. It must be ensured that the valve is protected against atmospheric influences and external damage. When the valve is shipped under specific climatic conditions (e.g. overseas transport), it must be specially protected and wrapped in plastic film and a desiccant must be added. The factory-applied corrosion protection and any assemblies must be protected against damage by external influences during transport and storage. The VAG DUOJET Automatic Air Valve must be transported and stored in a secure transport position. It is recommended to affix retaining bolts to the flange base for transport, if required. 1.2 Proper use The VAG DUOJET Automatic Air Valve is a valve for flanging to the pipeline. The standard type is suitable for the automatic aeration and venting of water supply systems. For the respective technical application ranges (e.g. operating pressure, medium, temperature) please refer to the product-related documentation (KAT 1912-A). For any alternative operating conditions and applications, the manufacturer s written approval must be obtained! These Operation and Maintenance Instructions contain important information on the safe and reliable operation of the VAG DUO- JET Automatic Air Valve. Observing these Operation and Maintenance Instructions helps you to: Prevent hazards Reduce repair costs and down-time of the valve and/or the entire equipment Improve the operational safety and useful life of the equipment. Picture 1: Transport position (top view) 2.2 Storage The elastomeric parts (seals) must be protected against direct sunlight and/or UV light as otherwise their long-term sealing function cannot be guaranteed. Store the valve in a dry and wellaerated place and avoid direct heat. Protect any assembly components necessary for the satisfactory function of the valve such as the ball and the small orifice for air release during operation against dust and other dirt by adequate covering. VAG Operation and Maintenance Instructions 3

Do not remove the protective caps of the connections / flanges and the packaging materials until immediately prior to assembly into the pipeline. The valve can be stored in ambient temperatures ranging from -20 C to + 50 C (protected by adequate covers). If the valve is stored at temperatures below 0 C, it should be warmed up to at least +5 C before installation and before it is put into operation. 3 Product features 3.1 Features and function description The VAG DUOJET Automatic Air Valve is a two-stage singlechamber air valve for the automatic aeration and venting of pipelines. The standard version is delivered with (cf. Picture 2): Inner parts made of stainless steel 1.4571 (Except DN 50/PN 16: float made of plastic) Screw connection in the outlet (possible to mount to fittings, elbows, insect protection) 3.3 Performance limits 3.3.1 Minimum pressure The minimum pressure for sealing the venting cross-sections is 0.3 bar. 3.3.2 Air inflow performance data The large aeration cross-section is for aerating with large amounts of air when switching off the pumping station. Picture 2: VAG DUOJET standard version As an alternative, a version with gate valve (VAG DUOJET S) as well as with an individually calculated orifice plate (VAG DUOJET Anti-Surge) is available (cf. Picture 3). Picture 4: Air inflow - large cross-section 3.3.3 Venting performance data The large venting cross-section is for venting large amounts of air when starting up the pumping station. Picture 3: VAG DUOJET -S and VAG DUOJET Anti-Surge Automatic Air Valve 3.2 Applications The VAG DUOJET Automatic Air Valve can be used with the following media: Water Raw and cooling water The VAG DUOJET Automatic Air Valve is not suitable for seawater, sewage or waste water. For information about the corresponding temperature limits, please refer to the product-related technical documentation (KAT-A 1912). In case of alternative operating conditions and applications, please consult the manufacturer. Picture 5: Air release large cross-section VAG Operation and Maintenance Instructions 4

3.3.4 Air release valve performance data The small venting cross-section is for venting small amounts of air during operation under full internal overpressure. Installation should take place at the high points of the pipeline. For direct installation of the VAG DUOJET Automatic Air Valve on a standpipe we recommend the use of an orifice plate upstream of the valve. Chamber structures must be built and equipped in accordance with DVGW data sheet W 358. 4.2.1 Installation in pipeline < DN 600 For pipelines < DIN 600 it is wise to use a sufficiently dimensioned venting dome. If not verified in detail, the venting dome can be considered sufficiently dimensioned if its construction height matches the diameter of the pipeline and has the diameter of approximately half the diameter of the pipeline. A central stop valve, an air valve and, if required, a device for manually activated aerating and venting or flushing are required. The central stop valve upstream from the air valve allows it to be installed or dismantled without interrupting operations. Because the air valve stopped by the stop valve is under pressure a vent plug is provided on the air valve to release pressure. In place of a plug, an installed valve operated manually simplifies aeration and venting and can also be used as a flush valve. 1 Picture 6: Air release small cross-section 2 4 Installation into the pipeline 4.1 Conditions required on site 3 When installing the pipeline flange it must be horizontal, plane parallel and flush. Aeration and venting valves should be installed as close as possible to the pipe being vented to avoid long supply lines from collect-ing stagnating water (hygienic problems, higher costs, regular flushing). In addition, long supply lines may result in limited venting function as well as be associated with the risk of freezing (the supply line or the air valve itself). In case of mechanical works around the valve causing dirt (e.g. painting, working with concrete etc.), the valve must be protected by adequate covering. For assembly in drinking water pipelines, suitable sealing materials, lubricants and process materials must be used which are approved for use in drinking water pipelines. Before putting the valve into operation, clean and purge the corresponding pipeline sections. ~ DN ~ 0,5 DN 4.2 Installation location To ensure the trouble-free function and long service life of the valve, several factors have to be taken into account when positioning the valve. 1: Venting valve 2: Manually operated air inflow and release, flush valve 3: Central stop valve The VAG DUOJET Automatic Air Valve can be installed in stations, in the open or in chambers. Picture 7: Pipeline < DN 600 VAG Operation and Maintenance Instructions 5

4.2.2 Installation for pipelines DN 600 For pipelines DN 600 the venting dome should not fall below nominal size DN 600 and a height of h = 600 mm. In this case a sufficiently dimensioned venting dome is provided. VAG DUOJET Automatic Air Valve To avoid a large installation height, manual venting can also be attached laterally to the air dome. Here, however, a second central stop valve upstream from manual venting is necessary. 1 2 Manually operated gate valve for air inflow and release 3 600 mm ~ DN 600 3 4 Diameter: DN / 10 1: Venting valve 2: Manually operated air inflow and release, flush valve 3: Central stop valve 4: Additional flush and discharge valve Immersion pipe Picture 8: Pipeline DN 600 Picture 9: Dome construction with immersion pipe 4.2.3 Water flow rate The water flow rate ascertained to fill a pipeline is equivalent to the volume of air to be released. In this case venting should take place at an overpressure of a maximum of 0.3 bar. In doing so, a change in the density of the air can still be accommodated. If when filling the rate in the pipeline exceeds 0.25 m/s, a dome construction with an immersion pipe is recommended to reduce pressure surges (Picture 9). The water flow rate ascertained to empty a pipeline is equivalent to the volume of air to be fed. In this case aeration should take place at an underpressure of a maximum of 0.4 bar relative pressure. In doing so, a change in the density of the air can still be disregarded. 4.3 Installation position The VAG DUOJET Automatic Air Valve must always be installed in an upright position. If installed in any other position, the manu-facturer cannot ensure the trouble free functioning of the valve or station (see Picture 10 - following page). 4.4 Installation note Observe the following special installation notes in accordance with the specified hydraulic conditions and installation positions. VAG Operation and Maintenance Instructions 6

Permissible Upright installation position 90 4.4.2 Installation in standpipes Standpipes result in high flow velocities during the filling process. If the VAG DUOJET Automatic Air Valve is installed directly on the standpipe there is a risk of the ball closing prematurely. To prevent premature closing we recommend the installation of a multiple-orifice plate in front of the valve (cf. Picture 12). Impermissible Multiple-orifice plate <> 90 Picture 10: Installation position of the Automatic Air Valve Picture 12: Installation position in standpipe 4.4.1 Installation position downstream from pumps If the VAG DUOJET Automatic Air Valve has to be installed downstream from pumping stations, positioning must take place according to the ideal installation position shown in Picture 11. 4.4.3 Discharging splashing or surge water When intentionally discharging splashing or surge water via the pipeline it should be cut off slowly downstream of the valve so that no improper suction effect impacts the VAG DUOJET Automatic Air Valve (cf. Picture 13). Impermissible installation position Ideal installation position Impermissible installation position (risk of suction effect) Ideal installation position (elbow and down-pipe separated) Picture 11: Installation position downstream from pumps Picture 13: Installation position for splashing or surge water VAG Operation and Maintenance Instructions 7

4.5 Assembly instructions and fittings Check the valve for possible damage that it may have suffered during transport and storage. Protect the valve against dirt caused on the construction site by adequate covering until installation. Thoroughly clean the surface of the flange gasket prior to installation. VAG does not assume any liability for consequential damage caused by dirt, shot-blasting gravel residue etc. The functional parts should be checked for proper operation prior to installation. Should the valves be repainted later on, it must be ensured that no paint is applied to the functional parts. The identification plates must not be painted over either. If the equipment is sand-blasted for cleaning prior to installation, these parts must be adequately covered. If solvents are used for cleaning, it must be ensured that the solvents do not destroy the seals of the pipeline or the valve. For the assembly of the VAG DUOJET Automatic Air Valve it must be ensured that proper load suspension devices as well as means of transport and lifting devices are available. When connecting the valve with the pipeline flanges, hexagon bolts and nuts with washers from flange to flange must be used in the through holes. The bolts and nuts selected by the operator must be appropriate for the pressure, temperature, flange material and the gasket. For connections that contain at least one cast-iron flange it is recommended to use bolts with a yield strength not exceeding 240 N/ mm². Fasten the bolts evenly and diagonally to prevent unnecessary tension and the resulting cracks or breaks. We recommend using steel-reinforced rubber seals to DIN EN 1514-1 Shape IBC. If you use raised face flanges, these seals are mandatory. 5 Set-up and operation of the valve 5.1 Visual inspection and preparation Before putting the valve and the equipment into operation, perform a visual inspection of all functional parts. Check whether all bolted connections have been properly fastened. If there is an upstream stop valve this must be set to the open position so that the VAG DUOJET Automatic Air Valve can function satisfactorily. 5.2 Function check and pressure test Warning: The pressure exerted on the closed valve must not exceed its nominal pressure (see technical data sheet KAT 1912-A). Newly installed pipeline systems should first be thoroughly purged to remove all foreign particles. If residue or dirt particles are present in the pipeline, they may clog the installation while the pipeline is being purged. This may impair the function of the valve or even block it. In particular after repair work or upon the commissioning of new equipment, the pipeline system is to be purged again with the valve being fully open. If detergents or disinfectants are used it must be ensured they do not attack the valve materials. 6 Maintenance and repair 6.1 General safety instructions Prior to beginning inspection and maintenance work on the valve, the connection to the pressure carrying pipeline must be shut off and depressurized via the plug on the valve. Only afterwards may maintenance work on the valve be performed. After completing the maintenance works and before resuming operation, check all connections for proper fastening and tightness. Perform the steps described for initial set-up as described under Section 5 Set-up and operation. Statutory and local provisions as well as the safety and accident prevention regulations must be observed and complied with at all times. Servicing, maintenance and inspection work as well as the replacement of spare parts must only be carried out by qualified staff. The plant operator is responsible for determining the suitability of the staff or for ensuring the relevant qualifications. In case the operator s employees do not have the qualifications required, they need to attend a training course. This training course can e.g. be held by VAG Service employees. In addition to this, the plant operator needs to ensure that all employees have understood these Operation and Maintenance Instructions as well as all further instructions referred to in them. Protective equipment such as safety boots, safety helmets, goggles, protective gloves etc. must be worn during all work requiring such protective equipment or for which such protective equipment is prescribed. Improper or wrong use of the valve should be avoided. Prior to the performance of any work on the valve and equipment it must be ensured that the relevant pipeline section has been depressurised and/or de-energised. 6.2 Inspection and operation intervals The VAG DUOJET Automatic Air Valve is virtually maintenancefree. The valve should however be inspected within a period of one year (DVGW data sheet W 392). Under extreme conditions of use this inspection interval should be carried out more frequently. Before any maintenance work is performed on the VAG DUOJET Automatic Air Valve, the valve must be shut off by an inspection valve and must be depressurised using the threaded plug 11 (see Section 6.3.1. Design ). VAG Operation and Maintenance Instructions 8

Warning: Open the threaded plug part 11 only by 3 turns maximum. The pressure is relieved via the drainage groove in the thread. Maintenance work must not be performed before this has been done. 6.3 Maintenance work and replacement of parts 7 8/8A 6 10 3.2 5 2 Maintenance activities are: Cleaning Removing deposits 9 Reapplying a coating of corrosion protection (when necessary) 11 Gasket replacement (when necessary) 3.1 Air release orifice replacement (when necessary) 12 4 Inspection should include examination of: Damage and corrosion Movability of the float in the shut-off device 1 Tightness Function Nozzle bores free from obstruction Visible deposits on floats and guide components For shaft installation the following additional inspections are required: Proper condition and cleanliness of the shaft structure Working order of the intake and outlet air of the shaft as well as drain Condition of measures for thermal insulation Condition of additional protective measures against infiltration of dirt, microbes and rain water in the shaft 6.3.1 Design The design view in Picture 14 is a partial overview of the following descriptions of the work procedures. Spare parts with associated part numbers are available in our document VAG KAT-E 1912. 6.3.2 Recommendations for the replacement of parts All parts should be changed as needed. The interval is oriented towards servicing requirements. For the sealings (part 3.2 and 8) replacement is recommended every 5 years. Replace the sealing ring (part 12) each time you open the threaded plug. Item Name Material 1 Body EN-JS 1030 2 Cover EN-JS 1030 3.1 Float 3.2 Sealing EPDM 4 Shell body 1.4541 5 Shut-off device 1.4541 6 Lead srew 1.4305 7 Supporting Disc 1.4541 8 8A Picture 14: Design Flatsealing Gasket p=0,1-1 bar DN 50 / PN 16 plastic > DN 50 stainless steel 1.4571 EPDM 9 Cylinder Head Screw A4-70 10 Disc A4 11 Plug Screw A4 12 Sealing ring Centellen VAG Operation and Maintenance Instructions 9

6.3.3 Replacement of the seals (3.2 and 8) 6.3.4 Bolt tightening torques Unfasten the cylindrical screws (9) crosswise Lift off cover (2) of the valve The seals, float, shell and shut-off device can now be removed The seal (3.2) is attached to the float (part 3.1) by cyanoacrylate adhesive (rapid set adhesive). When replacing the seal, pull it off the float and then glue the new seal to the float. For subsequent reassembly, place the shell into the body. Place the float into the shell, insert the seal (part 8) as well as the retaining washer (part 7) into the cover and centre it. Insert the shut-off device into the guide screw (part 6) and place the cover onto the body. Fasten the hexagon socket screws crosswise. Cylinder screw (9) M 12 M 16 M 20 30 Nm 10 Nm 20 Nm Table 1: Cylinder screw tightening torques Plug (11) G½ 30 Nm Table 2: Plug tightening torques 7 Trouble-shooting For all repair and maintenance work, please observe the general safety instructions described in Section 6.1! Problem Cause Remedial action Leaking main air valve Leaky air release orifice Air release orifice rate too small Foreign matter stuck in seat area Internal pressure too low Deposits from medium on the seat Sealing damaged Improper installation position Foreign matter stuck in air release orifice Sealing defective Operational characteristics were changed Flush valve, possibly disassemble and remove foreign matter To achieve tightness internal pressure must be at least 3 m water column. Replace gasket with a low pressure gasket (0.1-1 bar) Open cover, clean seat section Replace sealing (recommendation: replacement after a maximum of 5 years) see 6.3.3 Change installation position Flush valve, possibly disassemble and remove foreign matter Replace sealing (recommendation: replacement after a maximum of 5 years) see 6.3.3 Check layout and operational characteristics, if necessary, install special air release orifice with larger release bore Outlet clogged Insect infestation Clean valve and attach insect protection 8 How to contact us Head office VAG-Armaturen GmbH Carl-Reuther-Str. 1 68305 Mannheim Germany Telephone: +49 (621) 749-0 Fax: +49 (621) 749-2153 Service Our service hotline can be reached 24/7 world-wide. In case of emergency, please contact us by phone. Service hotline: +49 621-749 2222 Service per email: service@vag-armaturen.com info@vag-group.com http://www.vag-group.com VAG Operation and Maintenance Instructions 10

VAG-Armaturen GmbH Carl-Reuther-Str. 1 68305 Mannheim Germany Tel. +49 6 21 749-0 Fax +49 6 21 749-2153 info@vag-group.com www.vag-group.com Edition2-05/2010