ONTRAS VNG Gastranport GmbH PRICE LIST FOR NETWORK ACCES

Similar documents
Connect with us. ontras. Gastransport GmbH

Price list for Network Access

Annex: Technical Framework Conditions

Weapon dealer s licence

Bad Lauchstädt Storage. Special Storage Facility Conditions

Language Marathon Rules

Members & Firms

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

Elektromotoren und Gerätebau Barleben GmbH. Kooperationspartner Transformatorgase. Universal Breathing Buffer Box (G3B)

Winter Annual Ratio (WAR) bands

SGN Natural Gas Postalised Exit Capacity Charges for the Gas to the West Area. 30th August 2016

Firm dates for the FickstutenMarkt (Horse fair) 2018 (current stand: )

Recalibration of gas meters

Columbia Gulf Transmission Company Section 2.3. Original Volume No. 1.1 Version Non-Conforming Service Agreement No

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

WMF World Deaf Minigolf Championships 26 th -27 th April 2019

Integration of the. BBL pipeline into. the TTF market. area. Operational aspects

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

ANNOUNCEMENT. ISU European Short Track Speed Skating Championships January 12th to January 14th, 2018 Dresden/Germany

The 2013 SUPPLEMENT to THE CONSTRUCTION AGREEMENT 2010

EUROPEAN POWERLIFTING FEDERATION. Invitation. The European Powerlifting Federation. and the German Powerlifting Federation

Overview of early implementation of CAM NC (IP-level)

Baltic Health Path Health touristic route. Pilot Route Groningen (Provinz Drenthe) Mecklenburg-Vorpommern Pomorskie Liaison Office (Gdansk)

Meter Data Distribution User Manual

Open Metering System

TOURNAMENT INFORMATION No.1 + Information about Pre Match Procedures

2016 Lithuanian C League Rally

Submission of Non-PTO Wheeling Data

GERMAN OPEN JJIF Grand Slam Turnier -

Coupe E-Rallye Regularité de la FIA REGLEMENT PARTICULIER STANDARD FIA E-Rally Regularity Cup STANDARD PARTICULAR REGULATIONS

Project: OpenDRIVE Document No. Issue: Title: Style Guide For OpenDRIVE Databases VI C. Date: 05 th March 2014 no.

July 6 th until July 15 th, 2018 Notice of Race. A-Cat Europeans

Québec. Table of Contents Regulations and other Acts Index

XV UIPM Masters World Championships. in Modern Pentathlon and Tetrathlon - Halle (Saale), Germany

European Aviation Safety Agency

Payment Acceleration for OMAR Data Submission

Charisma/Charisma Identification of substance: - Product details:


Tariff Guide - Resident

Connected Systems, CSEPs and ISEPs

Network Transmission System Gas Supply Emergency / Gas SCR Overview. Jenny Phillips

DEPARTMENT OF HOMELAND SECURITY. Customs And Border Protection

Code for the Provision of Chargeable Mobile Content Services

Minigolf World Championships 21 st 24 th August 2013 in Bad Münder / Germany PROMOTER

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Advanced Project Management: Planning renewable energy projects

Government Accelerators

Law 16 Last Hour Time Lost Calculation. Toronto Cricket Umpires' and Scorers' Association

BBL Reverse Flow project and implications for IP Bacton. Presentation to the UNC Transmission Workgroup 7 th June 2018

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Entry Manual for AFC Club Competitions

Innovative Vacuum for Automation. Operating Instructions Dust Filter STF P / STF-D P.

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

RESTORATION PROCEDURES

2018 STATE CUP TEAM REGISTRATION PROCEDURE COMPREHENSIVE GUIDE

Am Sportzentrum 5, Riesa

Bid Regulations WE CARE ABOUT FOOTBALL UEFA EURO 2024

Guidance Note. NXT Advisors

The Only Open Standard for Smart Metering Across all Energy Types

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for April 2010

Invitation. Women s Race - Share your Run -

A-Cat Europeans Korsar Nationals Musto-Skiff German Open and International Regatta

82 ND MEETING RESOLUTION C RESOLUTION ON THE PROCESS FOR IMPROVED COMPLIANCE OF RESOLUTIONS ADOPTED BY THE COMMISSION

Code for the Provision of Chargeable Mobile Content Services

Central European Gas Hub

2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP

United Kingdom of Great Britain and Northern Ireland

G.B. Collins Engineering, P.A. Comments to Proposed Code Modification SW7074-A1

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for June 2012

Invitation. Dressagetests Class E - M. Jumpingtests Class E - L. Nations Cup PALTRA- TROPHY

Connecting Coal Bed Methane to the NTS. Transmission Workstream 1 st July 2010

Current situation and prospects for copper, nickel, lead and zinc

OEM Liquid-Flowmeter

Entry Information for DATEV Challenge Roth on July 09, 2017

Experience with the design, manufacture, test and commercialisation of the REpower 6M turbine

Race schedule. Regatta München e.v Euro Masters Regatta Munich Olympic Regatta Course Munich in Oberschleißheim, Germany July 26 to 29, 2018

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Manual Power relay SR853

INVITATION Dear Gymnastics Friends, the eg Wohnen 1902 and the SC Cottbus Turnen e.v. cordially invite you to the

Redesign of the International Timetabling Process (TTR) Ljubljana, 19 February 2019

An innovative Safety Solution for Overpressure Protection in the Urea Synthesis Section

Finn World Masters 2016 Notice of Race Published

Tariff Guide - Resident

Primus Line Flexible technology for the trenchless rehabilitation of pressure pipes. Gas. Oil. Water. Designed developed and made in Germany.

Classification according to PED 97/23/EG results in categories, depending on:

Cycling and Health. The Austrian Masterplan on Cycling. Promoting Cycling for Health, Environment and Quality of Life


Safety. Operating instructions Manual valves AKT, flow adjusting cocks GEHV, GEH, LEH DANGER. Contents WARNING CAUTION. Changes to edition 06.

Operation Manual. Nano-MQS Hand Tool 0,13-0,35 mm². en (Translation of the original German version) 1/17

Pump Performance Testing

Ocean Observatories Initiative Cabled Array Observatory Extension Cables/Connectors

Germany The Baltic Sea: Lübeck Stralsund Tour 2018 Individual Self-Guided Cycling Tour 8 days / 7 nights

Bank of Mauritius Template on Fees, Charges and Commissions

Change-Over Pressure Filter DFDK

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

CODE OPERATIONNEL DE RESEAU TRANSMISSION

DSG CSS Consequential Change. 22 nd January 2019

Dundalk Western Transportation Infrastructure. Supplementary Development Contribution Scheme

Original language: English CoP17 Doc CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

Transcription:

Connect with us. ONTRAS VNG Gastranport GmbH PRICE LIST FOR NETWORK ACCES from October, 1 st 2012

ONTRAS - VNG Gastransport GmbH price list for network access Valid from 1st October 2012 This English translation of the Price List for Network Access of ONTRAS VNG Gastransport GmbH shall not be legally binding and is for convenience only. The legally binding access to the network shall only be granted on the basis of the German version of the Pricelist for Network Access.

1. Firm Capacity The firm entry and exit tariffs for the respective entry and exit points are listed on the appendix of this price list. Further regulations contained in article 11 of the Supplementary Terms and Conditions of Trade of ONTRAS. 2. Interruptible Capacity The reduction factor for s for interruptible capacity - with the exception of the capacity s for network access points - is 0.98. Other regulations contained in article 12 of the Supplementary Terms and Conditions of Trade of ONTRAS. 3. Hourly allocation data for network connection points The balancing group manager shall pay the following s for hourly allocation data for network connection points: a) One-off set-up s: Service Charge in EUR Setting-up 2,000.00 Setting-up additional points 165.00 Setting-up of data polling by land line per balancing group (including 6 exit points) per additional exit point 365.00 per exit point Setting-up of data polling by mobile phone Setting-up of data polling and measurement point 365.00 per exit point 970.00 per exit point b) Monthly s: Service Charge in EUR Data polling by land line 260.00 per exit point Data polling by mobile phone 330.00 per exit point Data polling incl. data measurement 425.00 per exit point Operation 1,000.00 per balancing group 330.00 per exit point Version: 6.6 Page 2 / 7 Valid from: 1st October 2012

Appendix: entry and exit tariffs for firm and interruptible capacity Entry and exit tariffs include costs for implementation and operation of the platform for primary and secondary capacity in accordance with article 12 paragraph 1 sentence 2, paragraph 2 sentence 3 GasNZV. 1. Tariff for entry points Entry points Tariff zone firm interruptible Cross border points Deutschneudorf 10002 Entry 0.86 0.8428 Kamminke Entry 10004 Entry 0.86 0.8428 Market area interconnection point Steinitz 770 Entry 0.86 0.8428 Storage points UGS Bad Lauchstädt 2154 Entry storage 0.64 0.6272 UGS Bernburg 2136 Entry storage 0.64 0.6272 UGS Buchholz 2200 Entry storage 0.64 0.6272 UGS Katharina 5828 Entry storage 0.64 0.6272 UGS Kirchheilingen 2158 Entry storage 0.64 0.6272 UGS Kraak 2564 Entry storage 0.64 0.6272 UGS Peckensen 1322 Entry storage 0.64 0.6272 UGS Staßfurt 61004 Entry storage 0.64 0.6272 Biogas entry points BGA Barleben 6009 Entry biogas 0.00 0.0000 BGA Dargun 5798 Entry biogas 0.00 0.0000 BGA Haßlau 5830 Entry biogas 0.00 0.0000 BGA Lehma 6004 Entry biogas 0.00 0.0000 BGA Leizen 6012 Entry biogas 0.00 0.0000 BGA Neudorf 6013 Entry biogas 0.00 0.0000 BGA Sachsendorf 6014 Entry biogas 0.00 0.0000 BGA Satuelle 6015 Entry biogas 0.00 0.0000 BGA Schöpstal 5827 Entry biogas 0.00 0.0000 BGA Thronitz 6017 Entry biogas 0.00 0.0000 BGA Zernin 6018 Entry biogas 0.00 0.0000 BioEnergiePark Güstrow 5731 Entry biogas 0.00 0.0000 Reverse flow according to article 7 of the Supplementary Terms and Conditions of Trade of ONTRAS Lasow 469 Entry - 0.8428 Other entry points ONTRAS-MITGAS-Netz Bernburg-Peißen 2851 Entry storage 0.64 - Salzwedel Entry 6003 Entry 0.86 0.8428 Version: 6.6 Page 3 / 7

2. Tariff for exit points Exit points Tariff zone firm interruptible Accounting Specific biogas redistribution levy operation 1 Cross border points Deutschneudorf 2439 Zone 2 0.65 0.6370 0.0008 0.0080 - - Gubin 2494 Zone 1 0.79 0.7742 0.0008 0.0080 - - Lasow 469 Zone 1 0.79 0.7742 0.0008 0.0080 - - Market area interconnection point Steinitz 770 Zone 2 0.65 0.6370 0.0008 0.0080 - - Storage points UGS Bad Lauchstädt 2154 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Bernburg 2136 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Buchholz 2200 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Katharina 5828 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Kirchheilingen 2158 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Peckensen 1322 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - UGS Staßfurt 61004 Storage Zone 2 0.49 0.4802 0.0008 0.0080 - - E.ON Hanse Speicher Kraak 2564 Storage Zone 3 0.78 0.7644 0.0008 0.0080 - - Network connection points NAP Ahrensfelde 5789 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 118.17 NAP Bernburg 1176 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 61.30 NAP Bitterfeld GuD 2493 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 57.26 NAP Böddenstedt 6006 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 43.53 NAP Coswig II 1466 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 12.88 NAP Wolfen Areal A 5582 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 25.76 NAP Dieselstraße 5125 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 61.30 NAP Dresden 1429 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 92.41 NAP Eigenverbrauch UGS Bad Lauchstädt 5775 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 38.64 NAP Eigenverbrauch UGS Bernburg 5774 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 25.76 NAP Eigenverbrauch UGS Buchholz 5773 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 38.64 NAP Eigenverbrauch UGS Kirchheilingen 5772 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Eigenverbrauch UGS Peckensen 1426 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 38.64 NAP Eisenhüttenstadt Zone 41002 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 61.30 NAP Frömmstedt 887 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Wolfen Kraftwerk 5581 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 30.65 NAP Gräfenhainichen 672 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Hennigsdorf II 1131 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 43.53 NAP HKW/HW Schwerin Zone 5802 Zone 3 1.03 1.03 0.0008 0.0080 0.1857 157.20 NAP Industriegebiet Halle An der A14 5795 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 74.18 NAP Kirchmöser 1275 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 57.26 NAP Lenz 1726 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 12.88 NAP Marienehe 5266 Zone 3 1.03 1.03 0.0008 0.0080 0.1857 114.52 EUR/d Version: 6.6 Page 4 / 7

Exit points Tariff zone firm interruptible Accounting Specific biogas redistribution levy operation 1 EUR/d NAP Melamine Piesteritz 6000 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Merseburg Zone 41041 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 92.41 NAP Mosel 36 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Obertopfstädt 885 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Radsystem Mosel 5832 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 12.88 NAP Schwarze Pumpe 66 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 30.65 NAP Schwarze Pumpe II 6042 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 43.53 NAP Schwarzheide I 363 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 12.88 NAP Schwarzheide II 1040 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 57.26 NAP SKW Piesteritz 5760 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 92.41 NAP Spreetal Kraftwerk 5730 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 69.29 NAP Staßfurt 2991 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 30.65 NAP Staßfurt GuD 6002 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 43.53 NAP Thyrow 5791 Zone 1 0.79 0.79 0.0008 0.0080 0.1857 135.94 NAP Torgau 5009 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 61.30 NAP Trotha 2132 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 43.53 NAP Wolfen II 1869 Zone 2 0.65 0.65 0.0008 0.0080 0.1857 30.65 Commercial exit zones NKP-Zone DOW Olefinverbund 6029 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone DREWAG Netz 41001 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone E.ON Avacon 41010 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone E.ON edis 41013 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone E.ON Hanse 41019 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone EMS 41009 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone ENSO Netz 41034 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone envia INFRA 6030 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone ETG 41024 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone EV Schwarze Elster 41026 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone EW Bautzen 6043 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone EWA 41028 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone EWE Netz 41029 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone EWE Wendorf 6057 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone EWP 41031 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone GV Eisenhüttenstadt 6044 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone GV Görlitz 41039 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone GV Greifswald 6056 Zone 3 1.03-0.0008 0.0080 0.1857 NKP-Zone GV Vorpommern Netz 5718 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone Halle Netz 41025 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone ISB Arneburg 6045 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone Köthen Energie Netz 5084 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone MITNETZ Gas 1 41042 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone MITNETZ Gas 2 41043 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone NBB 1 41003 Zone 1 0.79-0.0008 0.0080 0.1857 - Version: 6.6 Page 5 / 7

Exit points Tariff zone firm interruptible EUR/d NKP-Zone NBB 2 41077 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone NBB 3 41078 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone Netz Leipzig 41065 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone NG Chemnitz 41058 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone NG Schwerin 41027 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone PVU 41051 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone Redinet Zeitz 41073 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SpreeGas 41053 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone Südsachsen Netz 41022 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SÜW Lübben 6047 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SÜW Luckau-Lübbenau 41064 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Bernau 41057 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Burg Energienetze 6050 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Döbeln 6051 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Elbtal 41059 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Finsterwalde 41060 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Freiberg 41032 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Güstrow 41061 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone SW Haldensleben 41062 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Lutherstadt Wittenberg 41071 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Magdeburg 41066 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Meißen 6046 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Neustrelitz 5126 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone SW Ribnitz-Damgarten 6052 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone SW Riesa 41067 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Rostock 41068 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone SW Senftenberg 6054 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Spremberg 41069 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SW Stendal 41070 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Wittenberge 6053 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone SW Zittau 41072 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone SWS Netze 5803 Zone 3 1.03-0.0008 0.0080 0.1857 - NKP-Zone TEN 41056 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone TW Naumburg 61009 Zone 2 0.65-0.0008 0.0080 0.1857 - NKP-Zone VB Hoyerswerda 6055 Zone 1 0.79-0.0008 0.0080 0.1857 - NKP-Zone ZEV 41075 Zone 2 0.65-0.0008 0.0080 0.1857-1 The metering operation is payable, if ONTRAS is meter operator. Details in article 25 paragraph 1 of the Terms and Conditions of Trade of ONTRAS. Accounting Specific biogas redistribution levy operation 1 Version: 6.6 Page 6 / 7

3. Tariff for transport between Steinitz and UGS Peckensen according to article 6 of the Supplementary Terms and Conditions of Trade of ONTRAS Measuring Accounting Steinitz Entry 770 0.0164 - - Steinitz Exit 770 0.0164 0.0004 0.004 UGS Peckensen Entry 1322 0.0164 - - UGS Peckensen Exit 1322 0.0164 0.0004 0.004 Version: 6.6 Page 7 / 7