(MSW) Process Overview. Introduction Chevron Corporation. All rights reserved.

Similar documents
We live by the Life Saving Rules so that everyone goes home safe, every day.

We also ask our subcontractors and partners to. At EHS Support we re passionate about safety. The. ensure the safey of themselves, their coworkers and

ESSENTIAL SAFETY RESOURCES

6. Each mitigation was verified and individually documented

PINNACLE OWNING SAFETY: Zero Fires Zero Loss Incidents 100% Employee Engagement

RYA British Youth Sailing Safety Policy

Safety at Work. Rules for Staying Alive

Permit-Required Confined Space Entry Program

WHS CONTRACTOR INFORMATION PACKAGE

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

LOCKOUT/TAGOUT PROGRAM

HAZARD IDENTIFICATION & RISK ASSESSMENT

Best Practice #207. Facility: Entire DOE Complex. Best Practice Title: Identification of Look-Alike Electrical Equipment

CONFINED SPACE ENTRY WRITTEN PLAN

Control of Hazardous Energy. Environmental Health and Safety

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

Confined Space in Construction

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

HAZARD MANAGEMENT PROCEDURE

WORKING ALONE PROGRAM

SITE SAFETY SUPERVISOR (SSS)

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Project & Task Work Health and Safety Risk Management Procedure

Lockout/Tagout Program

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

Module: Permit to work System

Confined Space Entry Safety Program

Above ground or below, worker and jobsite safety is your priority and ours.

Flammable Environments Guideline

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

LO/TO LOCKOUT/TAGOUT PROGRAM

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

1.1 OHS Policy and Responsibilities

CONFINED SPACE WRITTEN PROGRAM

P3: Pressure Pipe Principles. Carl Thunem, EHS Audit Manager Encana Services Company, Ltd.

Minimum Safety Requirements for Contractors Working on Railway Property

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Safety Essentials. Mandatory rules for our high risk activities

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Lockout/Tagout Safety Policy

1 Purpose. 2 Responsibilities. 3 Policy Content ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS. TITLE: CONFINED SPACE ENTRY Document Number: *

SPECIALIZED ONLINE TRAINING COURSE LIST

Lessons from a Deep, Dark Confined Space: A Case Study and A Brief on the New Construction Standard

Contractor/Visitor Safety Orientation UNBC

University of Vermont Department of Physical Plant Burlington, Vermont

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Delaware State University

THE UNIVERSITY OF NORTH CAROLINA

Version 1.0 March 2016

Risk Management and Safety (RMS) Confined Space Entry Program May 1, 2009

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Lockout Tagout Program

CONFINED SPACE AWARENESS

Written Programs Listing

2523-LDG-E. Leader s Guide

PRO Lifting Operations

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN

Overview of Today s Program

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

Confined Space Entry Program

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

JOSOP 460 Isolation of Hazardous Energy Standard

GOLDEN SAFETY RULES AFT DR

Join t Op e ra tion s CHESM Fie ld I n s p e ction Ch e cklis t

Hazardous Energy Control

Lockout/Tagout Manual

OPERATING PROCEDURES

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

General Isolation Procedures

Safe Work Permits A Safety Advantage

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

DRIVER FATIGUE MANAGEMENT PLAN

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

Permit-Required Confined Spaces...29CFR

Hazard Assessment & Control. Faculty of Veterinary Medicine

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

Lockout Tagout Program

Working Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014

Health & Safety Policy & Plan. Rightway Roofing.

US Pipelines & Logistics Contractor Toolkit

Based on market capitalization (in U.S. dollars) at December 31, 2015.

Duties of WAH Competent Persons

EMA, Inc. SITE SAFETY PLAN

(iii) The controlling contractor must apprise the host employer of the information exchanged with the entry entities pursuant to this subparagraph.

Company Health and Safety Policy

SOP. Working in Confined Spaces

LOCKOUT / TAGOUT PROGRAM

Occupational Health Safety and Welfare. Our Policy

Confined Space Plan Environmental Health & Safety Office July 2017

CONFINED SPACES IN CONSTRUCTION SUBPART AA

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lock Out/Tag Out Control of Hazardous Energy

2018 NFPA 70E Electrical Safe work practices

Transcription:

SiteSafe Managing Safe User Work Training (MSW) Process Overview Introduction 2009 Chevron Corporation. All rights reserved.

Operational Excellence Management System 2009 Chevron Corporation. All rights reserved. 2

Managing Safe Work (MSW) Process Overview What is the Managing Safe Work Process? It is a management system, written in a five component model to manage safe work practices in order to fulfill OE Element 3.2 Expectations of: A comprehensive safety program is in place for each location. Core elements of the program shall include: Written Safe Work Practices (SWP). SWPs include: permit to work, hot work, confined space entry, equipment isolation (lockout/tagout), opening equipment, excavation, working at heights, electrical work, simultaneous operations (SimOps), bypassing critical protections and lifting and rigging, and other applicable practices identified through risk assessment of local operations. A Job Safety Analysis (JSA) to identify, eliminate or mitigate potential risks prior to conducting work. Stop Work Authority 2009 Chevron Corporation. All rights reserved. 3

Managing Safe Work Process Purpose and Objective The purpose of the Managing Safe Work (MSW) process is to identify, assess, and mitigate, control or eliminate the risks associated with work. The MSW process provides for the identification and evaluation of job task hazards, specification of control measures, management of those measures, control of the work, and behaviors to support safe work. 2009 Chevron Corporation. All rights reserved. 4

Managing Safe Work Process Scope This MSW operational excellence (OE) process covers work performed by Chevron employees and their delegates and contractors within Chevron Global Upstream (GU) Exploration and Production operational control. Contractor MSW process activities (e.g., permitting, safe work practices, SOPs) within Chevron Operational Control are expected to meet the requirements of the GU MSW process. The SBU will work with contractors to determine if the SBU MSW process (or specific procedures, safe work practices, etc.) will be used and/or if the contractor process may be used. The Contractor HES Management (CHESM) process or other SBU process (e.g. bridging procedure) is generally used to review contractor MSW activities. 2009 Chevron Corporation. All rights reserved. 5

What s in the Managing Safe Work Process? Work Permitting Incident & Injury Free Operations 2009 Chevron Corporation. All rights reserved. 6

Chevron Thailand MSW Process Requirements To comply with this process, Chevron Thailand shall meet the following requirements: 1. Work shall be performed consistent with the steps and sequence outlined in the Chevron Thailand MSW process flow. 2. Conduct an MSW Engagement Session to identify supervision, by level in the organization, and associated behaviors specific to supporting the MSW Process. Measurement, tracking, and review of these identified behaviors shall be established along with setting appropriate accountability. 3. Work planning shall include a hazard analysis. 4. Contractors shall utilize a MSW process consistent with the design and intent of the Chevron Thailand process. Contractors using their MSW process shall be reviewed through the CHESM or other Chevron Thailand process. 2009 Chevron Corporation. All rights reserved. 7

Chevron Thailand MSW Process Requirements 5. SWP standards that meet or exceed the Chevron Thailand SWP Standards shall be maintained. 6. A job safety analysis (JSA) shall be performed prior to the beginning of work. This shall be discussed with workers prior to the start of the job. 7. A Stop Work Authority (SWA) policy shall be established, communicated and reinforced. 8. Personnel with roles in the MSW process shall demonstrate MSW competencies appropriate to their role. Affected personnel shall understand the SWPs that apply to their work and level of responsibility prior to performing the work, or be under the direct (and constant) supervision of a supervisor. 2009 Chevron Corporation. All rights reserved. 8

MSW Process Work Flow Planning Start 1.1: Identify work to occur? Develop work plan 1.2: Is this a low risk activity? 1.3: Does a qualified SOP exist? 1.4: Obtain preexisting hazard analysis if available 1.5: Conduct or Update hazard analysis 1.6: Update Work Plan Permitting 2.1: Is Permit to Work required? Conduct Onsite JSA 2.2: Determine Specialized work permits required 2.3: Prepare all required permits 2.4: Conduct Onsite JSA Recycle 2.5: Approve / Release Permit Periodic Verification / Review File for process verification and continuous improvement Return to Planning or Permitting Implementing 3.1: Implement controls 3.2: Work in progress 3.3: Have work conditions changed? 3.4: Should work be stopped? 3.5: Evaluate mitigation requirements 3.6: Is change within scope of plan? 3.7: Implement mitigations 3.8: Continue work 3.9: Work complete Closeout 4.1: Inform Responsible Party / Return Permit 4.2: Are updates (e.g. SOP, JSA, training) required? 4.3: Update documentation 4.4: Close and file

Impact to Daily Work MSW Workflow 1.0:Planning 2.0: Permitting 3.0:Implementing 4.0: Closeout Identify Work In Scope, develop work plan Determine if high-risk work applies Obtain existing Hazard Analysis or use qualified SOP if available, if not then Conduct Planning Hazard Analysis, If require, request General Work Permit and associate certificates Conduct onsite JSA with all work team members Area Controller and Work Team Leader sign to approve/release permit Conduct pre-job briefing Implement control measures Apply Think Incident Free Start and monitor work Determine if work can progress or needs to be stopped If work to be stopped, reevaluate mitigation requirements Inform responsible parties job is completed Clean up area and de isolate equipment Update training, SOPs, JSA, any documentation if required, Close out permit and certificates Approve permit Continue and complete work 2009 Chevron Corporation. All rights reserved. 10

Chevron Thailand MSW Process Requirements Precedence of Local Regulatory Requirements Local regulatory requirements shall take precedence in the event of a conflict between MSW process requirements and local regulations. 2009 Chevron Corporation. All rights reserved. 11

Role and Responsibilities Contractor / Subcontractor Management Ensure that supervisors and employees are properly trained, understand and follow the MSW process and procedures Ensure that up-to-date records of trained Work Team Leaders are kept 2009 Chevron Corporation. All rights reserved. 12